Monitoring of cell to cell inhomogeneity and transfer into simulation

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

GEM Chambers at BNL The detector from CERN, can be configured with up to 4 GEMs The detector for pad readout and drift studies, 2 GEM maximum.
Simulation of the RPC Response José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Standalone VeloPix Simulation Jianchun Wang 4/30/10.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
28 Feb 2006Digi - Paul Dauncey1 In principle change from simulation output to “raw” information equivalent to that seen in real data Not “reconstruction”,
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
GEM DHCAL Simulation Studies J. Yu* Univ. of Texas at Arlington ALCW, July 15, 2003 Cornell University (*on behalf of the UTA team; S. Habib, V. Kaushik,
Cluster Threshold Optimization from TIF data David Stuart, UC Santa Barbara July 26, 2007.
More on Testbeam Analysis FLZ. Stability Checks for TCMT Pedestal stability already shown by Kurt MIP calibration stability Response stability.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Simulation of RPC avalanche signal for a Digital Hadron Calorimeter (DHCAL) Lei Xia ANL - HEP.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Tracking within hadronic showers in the SDHCAL Imad Laktineh.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
W-DHCAL Analysis Overview José Repond Argonne National Laboratory.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Plans for a Simulation Study of the Magnetic Field Requirements of the LC TPC February 2006, ILC TPC Analysis Jamboree, DESY Christian Hansen University.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Semi Digital HCAL Data analysis results Robert Kieffer Institut de Physique Nucléaire de Lyon 10/02/
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
MicroMegas for DHCAL Status and activities at LAPP Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
1 Short Status of TB Analyses in SDHCAL Imad Laktineh.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Monitoring of cell to cell inhomogeneity and transfer into simulation M. Vander Donckt.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Manqi Ruan Status & plans for gaseous semi-digital HCAL in European.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
Pre-calibration of PM gain by photo-statistics
Time over Threshold (ToT) signal discrimination
A proposal to equip the high eta muon stations with High Rate GRPC
The Silicon Drift Detector of the ALICE Experiment
University and INFN of Naples
The Simulation Status of SDHCAL
CMS Preshower: Startup procedures: Reconstruction & calibration
DCH calibrations 2013 Gordon Lim, UCI.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
longitudinal shower profile
Development of hybrid photomultiplier for Hyper-Kamiokande
Summer 09 Testbeams SDHCAL prototypes
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Resistive Plate Chambers performance with Cosmic Rays
Presentation transcript:

Monitoring of cell to cell inhomogeneity and transfer into simulation M. Vander Donckt

February GRPC SDHCAL review Electronics: ASICs test facility The ASICs have been tested by R. della Negra using Labview-based application (cf. N. Seguin) The resulting gain correction is used as input for “on detector” calibration 03/02/2011 February GRPC SDHCAL review

February GRPC SDHCAL review Pedestals on detector Pads 35 03/02/2011 February GRPC SDHCAL review

On detector calibration From R. della Negra 1st threshold 1.015 DAC/fC Set asic DAC0 threshold =average pedestal+100 Check of threshold dispersion Charge injection not an absolute calibration due to unprecise injected charge knowledge Work in progress 03/02/2011 February GRPC SDHCAL review

February GRPC SDHCAL review Threshold uniformity 10 pads/asic for ~100fC (?) Dispersion ~7.5% (compared to 5% at ASIC test level) Mean threshold-Mean Ped=125DAC 03/02/2011 February GRPC SDHCAL review

Ideas for threshold monitoring Stability of charge injection threshold vs time for DAC0/1 and 2 (not absolute calibration) Stability of MIP threshold vs HV (for DAC0 and DAC1) Stability of ratios of number of pads above threshold 0 1 & 2 for given energy pions 03/02/2011 February GRPC SDHCAL review

Uniformity measurement To be done with cosmics as soon as we have 4 chambers Associate 3 collinear coincident clusters and predict in 4th chamber. Will allow multiplicity and efficiency uniformity measurement 1 cosmic/cm2/min -> Threshold scan over 120 DAC with ~10 tracks per pad in 20h Measurement of MIP peak withDAC0 & DAC1 03/02/2011 February GRPC SDHCAL review

Efficiency homogeneity studies HV: 7.5 kV Position scan area Homogeneous >95% Results obtained using time selection only 1m2 GRPC map February GRPC SDHCAL review 03/02/2011

Multiplicity homogeneity studies HV: 7.5 kV Multiplicity highly depends on threshold level Homogeneous <1.3 for threshold ~0.25 MIP Results obtained using time selection only Preliminary 1m2 GRPC map R. Kieffer 03/02/2011 February GRPC SDHCAL review

Inhomogeneity in simulation Dispersion of threshold/multiplicity can be added at the digitization level Idea to introduce pad multiplicity vs track position in simulation : Divide cells in 3x3 cells (Mokka) and compute probability of neighboring pads to be hit at digitization level (Marlin) as a function of the track entry sub-pad. M2 student starting end Feb to work on measurement/implementation. K. Belkhadi 03/02/2011 February GRPC SDHCAL review

February GRPC SDHCAL review Conclusion This is work in progress... Charge injection calibration can be improved by better impedance matching Will start using LPC Volcano data to start cosmic uniformity measurements 03/02/2011 February GRPC SDHCAL review