Water Drainage System Harris County, TX

Slides:



Advertisements
Similar presentations
1 Urban Drainage System Analysis & Design CEVE 512 Hydrologic Design Lab Spring 2011.
Advertisements

1 CTC 261 Hydraulics Storm Drainage Systems. 2 Objectives Know the factors associated with storm drainage systems.
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
Preliminary Design of Galvez Estates Subdivision.
STUDY OF THE STORM DRAIN SEWER OF THE URBAN CATCHMENT OF LA RIERETA, SAN BOI DE LLOBREGAT, SPAIN TEAM 3: 1. Aline Veról 2. José Rivero 3. Pedro Ramos 4.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Drainage Rights Dr. Matt Helmers Assistant Professor and Extension Agricultural Engineer Department of Agricultural and Biosystems Engineering Iowa State.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Reading: Applied Hydrology, Sec 15-1 to 15-5
By Jennifer VerWest. Differences between Flat and Average/Steep Terrain Flat Terrain Steep/Average Terrain.
Texas A&M University Department of Civil Engineering Cven689 – CE Applications of GIS Instructor: Dr. Francisco Olivera Logan Burton April 29, 2003 Application.
Estimating Qmax Using the Rational Method
Things that Happened Before You were Born (The earth and SWMM were created) a story by Dr. Larry A. Roesner, Ph.D.,P.E. based (loosely*) on biblical quotes.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Prepared By Abeer Mohammed Ala' Snober Suhad Dwaikat Wajeha Ma'ani Submitted to Dr. Amal Al-hudhud.
Underground Systems: Hydraulic Design
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Outline Introduction. Population Analysis Study Area Objectives
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
Urban Storm Drain Design: Conduit design. Sizing Conduit size is computed based on the discharge expected at the upstream node; Typically is done by the.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
CE 3372 Water Systems Design
CE 3372 Water Systems Design
Things that Happened Before You were Born (The earth and SWMM were created) a story by Dr. Larry A. Roesner, Ph.D.,P.E. based (loosely*) on biblical quotes.
Introduction to Urban Hydrology
Clear Creek Solutions, Inc. LID Hydrology and Hydraulics Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Storm Sewer Map Development Presented by: Kurt Whited.
1 TR-55 Urban Hydrology for Small Watersheds. 2 Simplified methods for estimating runoff and peak discharge for small urban/urbanizing watersheds Ch 1.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
DES 606: Watershed Modeling with HEC-HMS Watershed Subdivision Theodore G. Cleveland, Ph.D., P.E. 6 OCT 11.
Introduction to the USEPA’s Storm Water Management Model (SWMM 5.0) David Rosenberg CEE 5460 – Water Resources Engineering.
Overcoming Obstacles: Real LID Projects with Real Solutions
Queenston Manor Apartments -
CTC 450 Review WW Characteristics.
Storm Sewer Assessment for South Newport Subdivision
Town of Brighton, Department of Public Works
Storm Water Drainage Analysis for Harris County (Crosby, TX)
Construction Analysis Hydrographs
TR-55 Urban Hydrology for Small Watersheds
Basic Hydrology: Rainfall-runoff based methods – II
Cristina Nelson, Term Project, CEE 6440, Fall 2007
CE 3372 Water Systems Design
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
The Woodlands - a Totally Planned Community
Coursework guidelines
CE 3372 Water Systems Design
The Tank Hollow Fire and the Increase of Flood Potential for Spanish Fork Jaxon White.
Introduction to Urban Hydrology
Chapter 3 -Hydrology Hwk#3 - pp ,4,7,11 Hydrologic Cycle
Hydrologic River Routing
Lake Ralph Hall Upper Trinity Basin, Texas
The Woodlands - a Totally Planned Community
DES 606: Watershed Modeling with HEC-HMS
Highway Drainage: Determining Flow Rates
CTC 261 Hydraulics Storm Drainage Systems
SCS Dimensionless Unit Hydrograph
Determining Peak Flows
Hyetographs & Hydrographs
Northern California LID Hydrology and Hydraulics
SCS Dimensionless Unit Hydrograph
Weekly lesson objectives
Love Field Modernization Program
Presentation transcript:

Water Drainage System Harris County, TX Hydro point llc. (Team 1) – landon allen, chadi kanan, Catherine Lundberg, Michael rauschuber, Fernando torres

Introduction and Problem Design Pipes Junctions (two inlets per junction) Gravity System Water Drainage System Construct a storm sewer design Accommodate 2 year, 3 hour storm design Prevent impacts downstream Area Crosby, Texas (Harris County) Gum Gully Creek (Outfall)

Project Area Land Area: 48.85 acres, north west of Gum Gulley Creek Enclosed by Jolly Boat Dr., Broken Back Dr., and Golf Club Dr. Elevations ranging from: 14’ (water surface of Gum Gulley) to 48’ (north west corner of area) above mean sea level. Soil CH-fat clay, hydrologic soil group D – clays that are highly impermeable (Web Soil Survey) Water shed Undeveloped grassland with trees that is used for agriculture or as a natural habitat Large portions are undeveloped and unfarmed forest Outfall at Gum Gulley Creek

Hydraulics Curb on grade inlets (15’ and 20’) Capacity and area that matches capacity Prevent erosion No detention basin needed Meet velocity requirements (3-8 fps) Outfall elevation EPA SWMM 5 Junction Placement Rain Gage – 2 year design storm, 3 hour SCS Type III hyetograph Backfill – Alter outlet offset to lower velocities and maintain at least minimum slopes Examine area through 18:30 to examine all flow *Since a detention basin is not suggested bc little difference in volume between pre and post development hydrographs. Make the outfall elevation similar to the creek’s water surface elevation (14’ with land elevation [bank?] at 19’) *Junctions placed according to inlet capacity size (area of 4 acres for 20 ft curb on grade inlets [12], and then 2.4 acres for 15 ft curb on grade inlets [2]) – two inlets per junction and then added more to keep pipes inside public road ROWs *Rain gage – make 24 SCS type III empirical hyetograph and pick largest 3 hours (11:00-14:00)

Hydraulics Velocity: Maximum at Conduit 31 (7.72 fps) Minimum at Conduit 26 (3.11 fps) Slope: Minimum at Conduit 13 of 0.0016 (0.0013 required) Backfill Maximum at Junction 24 of 10.5ft Minimum at Junction 1 of 3ft 21 junctions 21 conduits

Cost Clearing/ Grubbing of land is roughly 25% of total cost Materials are most substantial part of cost Materials include concrete piping, grade inlets, manholes, and junction boxes Grade inlets consist of 5’ (Type C-1) & 10’ inlets (Type C-2A) combined to reach optimal length needed Engineering -15% Contingency -15% - Based on current bid prices

Summary and Conclusion Purpose: Safely carry storm water from all areas of the subdivision to the proposed outfall at Gum Gulley Creek (southeast of the area) while preventing erosion at the outfall or downstream. 7 drainage areas contributing to 7 junctions (2 inlets per junction) 12-20ft inlets (drainage areas equal to ~ 4.0 acres); 2-15ft inlets (drainage areas equal to or slightly greater than 2.4 acres) Safe velocities, slopes, and backfill due to Harris County requirements (3-8ft/s, 0.13%, 3ft) Pipe size increases based on flow capacity coming through inlets 18” – 2881 linear feet 24” – 1265 linear feet 30” – 847 linear feet Table 1. Alloted Drainage Area per Inlet Capacity  Inlet Size (ft) Inlet Capacity Q (cfs) C i (in/hr) tc (min) A (acres) Q (cfs) 10 3.5 0.4 6.76 1.29 15 6.5 2.40 20 11 4.07