DESY / XFEL – Tunnel layout, transport and handling solutions

Slides:



Advertisements
Similar presentations
Summary of Projects Kai Hock. LHC Upgrade About the project LHC is a 27 km circular accelerator in CERN that produces 7 TeV protons. The project is to.
Advertisements

RAMIRI 2 Prague, March 2012 Legal and governance issues: ESRF and European XFEL as examples of single-site facilities Karl Witte Hamburg.
SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
MICRO VERTEX DETECTOR ZEUS experiment at DESY (HAMBURG) PROJECT SPECIFICATIONS : Design and production of a silicon Micro Vertex Detector (MVD) for the.
Centro de Electrónica Industrial (CEI) | Universidad Politécnica de Madrid | | Design, prototype and manufacture of a large series.
XFEL The European XRAY-Laser Project in Northernn Germany The Safety-Concept Stefan Schrader April 2005 XFEL X-Ray Free-Electron Laser XFEL X-Ray Free-Electron.
The Train Builder Data Acquisition System for the European-XFEL John Coughlan, Chris Day, Senerath Galagedera and Rob Halsall STFC Rutherford Appleton.
ELECTROLYSIS SYSTEMS DISINFECTION OF WATER ROYAL ACADEMY OF THE UNITED NATIONS.
Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
1 Albrecht Wagner, EPP2010, 16 May 2005, Chicago ILC - International Cooperation and Coordination The Point of view of DESY and Germany Albrecht Wagner,
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
EDMS for CFS Discussion: How to best use EDMS for CFS in ILC preparation? Lars Hagge, Benno List Deutsches Elektronen-Synchrotron DESY LCWS13, Tokyo,
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Status of the Project April EPOG, 12th Outreach-Meeting, CERN, Petra Folkerts, DESY 1 Report from DESY, Hamburg, Germany The Status of TESLA and.
The Lab‘s Status & Future August 2003 – Fermilab - InterActions, Petra Folkerts, DESY Report from DESY, Hamburg, Germany.
HORIZON 2020 RESEARCH & INNOVATION PROPOSAL : Promoting ResponsIble Research & InnovaTIon Evangelos Gazis IASA-NTUA 03 Sep
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
IWAA 2010 Hamburg Germany Deutsches Elektronen-Synchrotron, DESY Gerhard Neubauer, MEA2 A GIS sight on the European XFEL.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
DESY Deutsches Electron Synchrotron Shima Bayesteh.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.

DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Cryogenic refrigeration for the XFEL facility. Current status of the commissioning. Wilhelm Hanspeter Grenoble, June 4th, 2015.
July 2014, TE-CRG-MLEDMS Naming Key Issues – List of Naming conventions in use QAC Naming Conventions Sub-committee Meeting n.2 S. Knoops QAC TE(-CRG)
1 Valovna dolžina (nm). Band structure: direct vs. indirect Eg 2.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
CERN/BE/CO – Claude Dehavay - Sept.2016 (with input from Z.Zaharieva and M.Vanden Eynden) 1.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Crab Cavity Technical Coordination meeting:
Wind Power development in Russia: Barriers and Constraints
I. Bergevoet - Training preparation
Strategy and Status of Reference Cavities for European XFEL
Paper: Acoustic Injectors for Drop-On-Demand Serial
Grzegorz Wrochna, PIMS kick-off CERN
MSc-Student Activities at the European XFEL
Introducing European XFEL Enlightening Science
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
ICEC/IMC 2016 Sergiy Putselyk DESY MKS
The Train Builder Data Acquisition System for the European-XFEL
Task on I.T. Russian firm are discussing the possibility of purchasing mobile phones in Germany. The cost of one unit is 20 Euro, the cost of transportation.
Communication and Documentation Needs exemplified on WP 71
Markus Hüning 3rd XFEL Collaboration Meeting
CERN The world’s largest Particle Physics Research Center in Geneva
Insuring the balance sheet
Course Structure.
Extraction Michael Bevins May 17, 2007
by Sven Mohr DESY D5 – Occupational Safety and Evironmental Protection
Radwaste: status & way forward
ISO/TC 154 ISO/TC 154 Processes, data elements and documents in commerce, industry and administration.
Laser Und XFEL.EU Experiment
Presentation transcript:

DESY / XFEL – Tunnel layout, transport and handling solutions I. Ruehl / EN-HE

European XFEL in a nutshell Research facility of superlatives: Generation of ultrashort X-ray flashes—27 000 times per second and with a brilliance that is a billion times higher than that of the best conventional X-ray radiation sources. 3,4 km-long facility from Hamburg to Schleswig-Holstein Construction costs, including commissioning, amount to 1.22 Billion EUR (price levels of 2005), Germany covers 58%, Russia (27%), others between 1-3% At present 11 countries participating

The European XFEL.

Asset Management. Examples: Superconducting accelerator modules for the European XFEL: 100 modules build over two years Components from different vendors Assembly in different countries Different CAD systems involved Safety documents required … Documentation: Electronic Data Management System EDMS ‘If you want to hide a document, put it in the EDMS’