K. Foraz on behalf of OSS members

Slides:



Advertisements
Similar presentations
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
Advertisements

A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
SPS LS1 Planning meeting (N019) 04/09/13
BE-BI Activities and Status: LHC and Injectors
SMACC Tenth report [15 min] 13/09/2013
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
BA6 – crab cavity activities in EYETS
Status of LHC installation & New Installation Schedule
K. Foraz on behalf of OSS members
LIU – EVM status and next steps
AD consolidation activities in LS2
SPS - EYETS 2016/17 Vacuum systems planning
on behalf of the RF group
Update of cryogenic activities
LS1 Committee January 24th, 2014
Long Shutdown for the LHC: Vacuum Beam Pipes
Preparation of the activities for the LHC Long Shutdown 2
Installations, modifications, consolidation in 2005:
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Short LHC-TS week 38 Confirmed by LMC on 16th August
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
LHC installation status
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
Hardware Commissioning
Aziz AMAMOU EACM – 21th May 2019
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

K. Foraz on behalf of OSS members Injectors & LHC report K. Foraz on behalf of OSS members 29/11/13 LSC - EN-MEF-OSS

AD & LEIR AD BHN06: test of new coils gave satisfactory results UHM3107 and UVM3207 tanks : inspection and replacement of some gaskets – Postponed to wk 50-51 KFI tanks reinstallation KFI56 : Electrical tests completed - Tank back next week KFI55: Electrical tests in progress Demineralized water manifold modified in view of Elena transfer line LEIR Sector 2: bake-out finished TE/ABT : test of new control system progresses according to planning. OK. EN/STI : mechanical parts of STP20 beam stopper motorization upgraded and reinstalled in the machine. Pumped. Leak test OK. BE/RF : green light was given to BE/RF to install new rack in LEIR (transverse dampers). BHN06 – new coils LEIR sector 2 29/11/13 LSC - EN-MEF-OSS

PS In Progress CV Consolidation in progress - Test automation in progress. Consolidation of the 7 PS main magnets started 6 MU have been already removed from beam line and delivered to the Magnet workshop. Septum 16 External Shielding in progress Installation of new PS concrete floor blocks, replacing broken blocks activity started Cabling campaign (PS ring) in progress Decabling campaign in TT2 started to get space for new cables General equipment maintenance:   Instrumentation, Beam Stoppers, (EN/STI)  consolidation/maintenance program Power House renovation b355 started BIW installation is on-going (80%) 6th MU 29/11/13 LSC - EN-MEF-OSS

PSB In progress Completed. BE-CO ACCOR project integration 1st dry run tests. In progress PSB beam dump replacement project on schedule. Cabling of the new BLM’s. Commissioning of the BT.KFA10/20 hydraulic & control circuits. Cabling of the beam dump instrumentation & remote monitoring system. Reinstallation of BTY-QDE105 & QFO108 magnets BTY line Installation of the newly designed BCT’s (beam current transformers). Installation of the newly designed Pick ups (Type UES). Cooling circuit upgrades to the main bending and quadrupole magnets. CV consolidation and maintenance of CV, kickers, Septa, vacuum beam instrumentation, Magnet and Beam stopper, cabling campaign. Forecast ALARA 2 committee preparations for the replacement & renovation of the 4 PSB cranes 02/11/2014. Civil engineering preparation works to create a new cable trench to service the beam injector line (LIU project). Installation of 4 new SMV power converters in the BCER. Installation of the new RF finemet cavity. Installation of BLM supports. 29/11/13 LSC - EN-MEF-OSS

SPS BA1: TT10: Other works: Irradiated cabling campaign in on-going Removal of control cables starts next week. TT10: Installation of a protective mesh under the support beams will begin next week. Civil engineering works will continue until the end of the year. Re-installation of the beam line will begin in January 2014 Other works: TE/ABT have begun conditioning of the kickers in BA4. Conditioning of Kickers at BA6 will start next week EN/CV have started to re-fill the primary circuits at BA6 in preparation for the kicker conditioning. On-going TE/ABT are in the process of replacing Septas in BA2 This will continue until the end of the year EN/EL will complete the Fibre Optics installation at BA5 this week. On-going 29/11/13 LSC - EN-MEF-OSS

Injectors progress curves 29/11/13 LSC - EN-MEF-OSS

LHC - P1 R2E – Pt1: LSS1: Finished In progress Relocation of cryogenics equipment – Right side Relocation of Power converters Water cooled cable installation – Both sides WCC orientation will be done in December In progress Commissioning of cryogenic equipment Power converters cabling LSS1: Modification of the DQR water pipes almost finished  finish 13kA dump protection consolidation Beam vacuum activities: B1L1, B1R1 HRL consolidation 29/11/13 LSC - EN-MEF-OSS

LHC – P1  P2 Arc 12 : Point 2 LSS2 In progress SMACC De-solder (87%  ~100%) and Solder BB (55%  ~100%) Shunt installation (55%  90% ) DFBA consolidation 2L: CL consolidation on going QRL compensator replacement Point 2 Cryogenic maintenance in progress LSS2 Consolidation of the DFBX almost finished BTVST - NEG coating in progress (on surface) MKI piping in progress (integration) Beam vacuum: C1L2, B1R2 29/11/13 LSC - EN-MEF-OSS

LHC - P2  P3 Arc 23 LSS3 In progress SMACC BB desoldering (43%) and soldering (10%) in progress Shunt installation (14%) DFBA: preparation works started LSS3 Cabling campaign - Tests in progress Survey and alignment of intermediate components TCAPD piping BPMWJ/G – 3 months of delay announced on the current schedule Impact of vacuum resources in 2014 . Being solved (Total of 6 month of delivery delay from the firm) QQBIA.18R2 soldering 29/11/13 LSC - EN-MEF-OSS

LHC - P3P4 Arc 34 In progress DFBA consolidation SMACC: DFBAF - Sleeves cutting finished DFBAG – preparatory work from next week SMACC: M opening (50%) 29/11/13 LSC - EN-MEF-OSS

LHC – P4P5 LSS4 & P4 Arc 45 Finished In progress Thermoswitch installation BQS removed In progress New cooling tower installation SU and UW maintenance Cryogenic maintenance Beam vacuum: bake-out preparation A7L4 and C7L4 RF maintenance Water flow-meter for ADT being exchanged RF module ready for the end of the year Detailed schedule being prepared Arc 45 W opening (94%) QRL pumping Magnet reconnection DFBAI.5L CRG consolidation 29/11/13 LSC - EN-MEF-OSS

LHC – P5 LSS5: R2E – P5 In progress Survey and realignment of D and Q magnets (Till Q12) done TCLP installed but might be dismounted to put in place protection of the QRL bellow (to be clarified by HSE) Forecast TOTEM - Piping work next week R2E – P5 Finished Safe room extension almost finished Panel sandwich next week Relocation safety equipment In progress Cabling in progress BT cabling 1 week delay, but in the shadow Control cabling from next week Optical fibbers (ducts) Safe-room – cables pulling 29/11/13 LSC - EN-MEF-OSS

LHC – P5  P6 Arc 56 Finished In progress W closure – (85%  99%, 1 missing) In progress SMACC leak tests : (7) 8 sub-sectors validated 4 in progress DFBAK.6L – SHM transported, repair on surface (back in January) Diode Lead measurement in the tunnel soon 29/11/13 LSC - EN-MEF-OSS

LHC – P6 LSS6 & P6 In progress Electrical maintenance W. 50 Cables connectors and tests Water cooled cable campaign in progress MKB-MKD tests in progress BPMSB – installed Cryogenic maintenance Vacuum : IP6 (some issue with vacuum components NC) Electrical maintenance W. 50 RA67 - Pressure tests on WCC 29/11/13 LSC - EN-MEF-OSS

LHC – P6  P7 Arc 67 SMACC in progress: W Closure activities finished (97%  100%) 13/14 vacuum subsectors leak tested (W) DFBA consolidation 6R DFBAL leak test to be done 7L DFBAM finished Validation of the helium circuit from next week Pressure test being organized (January) Optical fiber finished Leak tests in progress 29/11/13 LSC - EN-MEF-OSS

P7 LSS7 Cabling campaign in progress (finished in 7R) Beam vacuum: bake-out preparation in progress (A5L7) Optical fibers installation – Right side in progress P7 enclosure – preparatory works in progress (cable rearrangement) Electrical maintenance on wk. 51 R2E – P7: UPS installation finished UTA installation finished Cabling campaign in progress 2 shifts from next week 29/11/13 LSC - EN-MEF-OSS

LHC - P7 P8 Arc 78 Splice consolidation in progress Insulation boxes installed 206/212 M weld 57%  95% Diodes 81%98% M leak test 40% DFBA consolidation in progress DFBAN.7R – finishing works DFBAO.8L Gimball bellow - solution under study (~wk48) Pigtail consolidation in progress Optical fibbers in 7R in progress 29/11/13 LSC - EN-MEF-OSS

LHC - P8 Cold box open LSS8 &P8 Cable campaign ongoing (right and left sides ) Survey with the duct (D&Q) in progress Beam vacuum: bake-out and NEG activation (A5R8, I5R8, A7R8 finished) UW maintenance in progress Thermoswitch installation in progress Cryogenic maintenance in progress R2E - P8 CV works almost finished Pressure test Dec. 9th A7R8 -bake-out 29/11/13 LSC - EN-MEF-OSS

LHC – arc 81 Arc 81 - SMACC SMACC DFBA consolidation DFBAP.8R (ends end January) shunt installation finished DFBAA.1L (ends end January) Shunt installation almost completed (97%  99%) M insulation installation (54%) Diodes installation (38%) Cryogenics consolidation and maintenance QRL consolidation of the compensator header D A24L1 29/11/13 LSC - EN-MEF-OSS

Insulation boxes installation follow-up 29/11/13 LSC - EN-MEF-OSS

Xmas activities Electrical test in 2014 Meeting next week Ss Jura - No access to LHC1 –ATLAS –LHC18 – SPS6 –SPS7 PM15 lift – No access to LHC1 (machine) , PM76 lift – No access to P7 Safety tests – No access from mid-arc to mid-arc AUG Meyrin west - No demineralised water production AUG Meyrin admin - No compressed air production in Meyrin and Pt 18 18kV maintenance at P1 – No access to LHC1 & ATLAS Electrical test in 2014 Meeting next week 29/11/13 LSC - EN-MEF-OSS

Overall progress Injectors LHC Good progress of work Injector start up being detailed LHC Good progress, SMACC but ~(3) 2.5 wks delay R2E – on schedule at P5&P7, ahead at P1 Equipment readiness around “warm vacuum” being analyzed 29/11/13 LSC - EN-MEF-OSS

LHC Overall Schedule – broken line 29/11/13 LSC - EN-MEF-OSS