Iterative Risk Management Workflow Tool

Slides:



Advertisements
Similar presentations
PROJECT RISK MANAGEMENT
Advertisements

Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Supporting people with a learning disability Introduction to Project Management Presenter: Steve Raw FInstLM, FCMI.
Risk Management Chapter 7.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Managing Project Risk.
CIS 375 Bruce R. Maxim UM-Dearborn
MONITORING PROJECTS: QUALITY AND RESULTS. DAY ONE ASSESSMENT DAY TWO DESIGN DAY THREE MONITORING MORNING Intro. Training Intro. Assessment Intro. DesignIntro.
RISK MANAGEMENT IN SOFTWARE ENGINEERING RISK MANAGEMENT IN SOFTWARE ENGINEERING Prepared by Prepared by Sneha Mudumba Sneha Mudumba.
What is Business Analysis Planning & Monitoring?
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
Chapter 11: Project Risk Management
Mar 03 Mar 03wec1 NASA Continuous Risk Management (CRM) CQSDI 2-4 March 03 Warren Connley Chief, Systems Management Support Office GSFC ,
Chapter 10 Contemporary Project Management Kloppenborg
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Project Management By: Dr Madhu Fernando Project Risk Management
Chapter 11: Project Risk Management
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
INCOSE TOULOUSE - FRANCE 1. 2 James C. Helm Associate Professor, Systems Engineering School of Science and Computer Engineering 2700 Bay Area Boulevard.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
1 INNOVATIONS 2001 Organized by The Clear Lake Council Of Technical Societies (CLCTS) in cooperation with and co-sponsored by CLCTS member organizations.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Develop Project Charter
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
SOFTWARE PROJECT MANAGEMENT
Project Risk Management Planning Stage
1 James C. Helm Assistant Professor, Systems Engineering School of Natural and Applied Sciences 2700 Bay Area Boulevard Houston, Texas VPN
Introduction to Project Management Chapter 9 Managing Project Risk
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Prepared By: Razif Razali 1 TMK 264: COMPUTER SECURITY CHAPTER SIX : ADMINISTERING SECURITY.
Project Risk Management Planning Division of Project Management November 2003.
UNIT III. A managerial problem can be described as the gap between a given current state of affairs and a future desired state. Problem solving may then.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
 Define and recognize risk  Define the contents of a risk management plan  Conduct a risk identification and prioritization process  Define.
Risks and Hazards to Consider Unit 3. Visual 3.1 Unit 3 Overview This unit describes:  The importance of identifying and analyzing possible hazards that.
PLC Year 2 Day 2 Inquiry Cycle
IT Service Transition – purpose and processes
Software Project Configuration Management
Risk Management.
Software Risk Management
Causal Analysis & Resolution (CAR) Support Category
The Five Secrets of Project Scheduling A PMO Approach
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
Project Based Risk Management Defusing a potential ticking time bomb
ESET 419 Engineering Technology Capstone I
Risk Management for Technology Projects
Software Engineering B.Tech Ii csE Sem-II
TechStambha PMP Certification Training
Chapter 11: Project Risk Management
Project Risk Management
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
INF 410 Education for Service-- snaptutorial.com.
INF 410 Teaching Effectively-- snaptutorial.com
Monitoring and Reporting Project Progress
PMI North Area PMP Exam Study Group
Project Charter I want to design a project
Conduction of a simulation considering cascading effects
Risk Management Process (Revised)
Planning Sales Dialogues and Presentations
ELC 347 project management
Chapter#8:Project Risk Management Planning
Project Management Group
Project Risk Management
Chapter#8:Project Risk Management Planning
Schedule (Major Deliverables and Milestones)
Presentation transcript:

Iterative Risk Management Workflow Tool James C. Helm, Ph.D., P.E. Assistant Professor, Systems Engineering And Hamsini Ravipati Graduate Student School of Natural and Applied Sciences 2700 Bay Area Boulevard Houston, Texas 77058-1098 VPN 281-283-3875 FAX 281-283-3828 helm@cl.uh.edu http://nas.cl.uh.edu/helm

Iterative Risk Management Workflow Tool This paper presents: A risk management paradigm A risk information sheet content An iterative risk management workflow prototype tool   The risk management paradigm is a set of functions that are identified as continuous activities throughout the life cycle of a project. The risk information sheet is a format that records the risk information gathered during each paradigm function. The risk management workflow processes the risk information sheets associated with the five stages of the iterative risk management lifecycle. Individual sections of the risk information sheet pertinent to the five stages of the paradigm are entered and saved in an Oracle database. The iterative stages are identify, analyze plan, track, and control. A prototype risk management workflow tool for recording and saving the risk information sheets was developed.

Risk Management Paradigm The Risk Management paradigm illustrates a set of functions that are identified as continuous activities throughout the life cycle of a project.

Components of Risk Management - 1 Identify search for and locate risks before they become problems Analyze convert risk data into useable information for determining priorities and making decisions Plan translate risk information into planning decisions and mitigating actions (both present and future), and implement those actions The purpose of Identify is to locate risks before they become problems and to incorporate this information into the project management process. Anyone in a project can identify risks to the project. Each individual has particular knowledge about the project. Risk versus Problems - risks haven’t happened (Iceberg and Titanic example) The purpose of Analyze is to convert risk data into decision-making information. Category risks Prioritized Risks The purpose of Plan is ensure the consequences and sources of the risk are known develop effective plans plan efficiently (only as much as needed or will not be of benefit) to produce, over time, the correct set of actions that minimize the risk and impacts (cost and schedule) while maximizing opportunity and value plan important risks first assign responsibility for tracking and controlling risk

Components of Risk Management - 2 Track monitor risk indicators and mitigation actions Control correct for deviations from the risk mitigation plans and decide on future actions Communicate & Document provide information and feedback to the project on the risk activities, current risks, and emerging risks The purpose of Track is to collect accurate, timely, and relevant risk information and to present it in a clear and easily understood manner appropriate to the person/group who receives the status report. Tracking is done by the person(s) responsible for monitoring “watched” or “mitigated” risks. The status report information generated during tracking is used by project personnel during the control function of the paradigm to make decisions about managing risks. The purpose of Control is to make informed, timely, and effective decisions regarding risks and their mitigation plans. The purpose of Communicate is for project personnel to understand the project’s risks and mitigation alternatives understand the risk data and make informed choices within the constraints of the project eliminate barriers to effective communication Communication and Documentation are present in all other functions of the paradigm and is essential for managing risks. Communication of risk information is often difficult because the concept of risk deals with 1) probability and 2) negative consequences

Components of a Risk Statement there is a possibility that Given the ; Condition Consequence will occur Risk Statement Condition: a single phrase that identifies possible future problems, and describes current key circumstances, situations, etc. that are causing concern, doubt, anxiety, or uncertainty Consequence: a single phrase or sentence that describes the key, negative outcome(s) of the current conditions The condition-consequence format provides a more complete picture of the risk, which is critical during mitigation planning. It can be read as follows: given the <condition> there is a possibility that <consequence> will occur The condition component focuses on what is currently causing concern. What keeps you up nights? This is something that is true or widely perceived to be true. This component provides information that is useful when determining how to mitigate a risk. The consequence component focuses on the impact of the risk. Understanding the depth and breadth of the impact is useful in determining how much time, resources, and effort should be allocated to the mitigation effort. A well-formed risk statement has only one condition, but may have one or more consequences.

IDENTIFY Risk Information Sheet Risk Management database Complete: ID Date Identified Risk statement Origin Risk Context The risk information sheet records the information gathered during each of the paradigm function. The shaded areas indicate the following fields will be completed during: IDENTIFY ID: unique identifier for the risk, numeric, or alphanumeric; assigned by project or organization or CM office Identified: date when the risk was identified Statement: statement of the risk Origin: Organization or person who identified the risk Context: Associated information that clarifies the risk

Risk Information Sheet ANALYZE Risk Information Sheet Related areas: Priority Probability Impact Timeframe Class The shaded areas indicate the following fields will be filled out during: ANALYZE Priority: The priority ranking of the risk Probability: The likelihood of occurrence—exact value depends on the level of analysis Impact: The degree of impact—exact value depends on the level of analysis Timeframe: The timeframe in which action is needed Class: The classification of the risk (could be more than one value); the class or group the risk belongs to

Risk Information Sheet PLAN Risk Information Sheet Risk Information Sheet Status Status Date Approval Closing Date Closing Rationale Contingency Plan and Trigger Mitigation Strategy Context Statement Origin Probability Impact Timeframe Class Assigned Identified: __/__/__ to: ___/___/___ Priority ID To be completed: Assigned to Mitigation Strategy Contingency plan and trigger The shaded areas indicate that the following fields will be completed during: PLAN Assigned to: Who is responsible for mitigating the risk. Mitigation strategy: The selected mitigation strategy for mitigating the risk. This field can also be used to document the other approaches that can be taken and their information (e.g., research approach with its research plan; watch approach with its tracking requirements; accept approach with its acceptance rationale) Contingency plan and trigger: A contingency plan, if one exists, and the event or time that triggers it, should the mitigation strategy fail.

Risk Information Sheet TRACK Risk Information Sheet Completed or Updated: Priority Probability Impact Timeframe Status Status Date The shaded areas indicate that the following fields will be completed during: TRACK Status/status date: Running status information that provides a history of what is being done for the risk and of any changes in the risk. Probability: Likelihood of occurrence—exact value depends on type of analysis Impact: Degree of impact—exact value depends on type of analysis Timeframe: Timeframe in which the risk will occur or action is needed Priority: Priority ranking of the risk

Risk Information Sheet CONTROL Risk Information Sheet Completed Items: Approval Closing date Closing rationale Status The shaded areas indicate the fields that will be completed during: CONTROL Approval: Approval for mitigation strategies or closure. For transferred risks, this may require the transferor's signature. Closing date: The date when the risk was closed. Closing rationale: The rationale for closure of the risk, e.g., probability is zero.

Risk Management Work Flow This is the home page for the iterative risk management workflow prototype tool http://nas.cl.uh.edu/ravipatyh/default.html