The Balmatt Deep Geothermal Project in Northern Belgium

Slides:



Advertisements
Similar presentations
Chuck Kutscher National Renewable Energy Laboratory Geothermal Power Potential Energy and Climate Mini-Workshop November 3, 2008.
Advertisements

Dr. Kamal Kant Dwivedi Counselor (S&T) Embassy of India Washington DC,
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
Geothermal Energy Technology and International Development Forum ThermaSource, Inc.: A Drilling Point of View Louis Capuano, Jr Chief Executive Officer.
D EEP P ERMEABLE S TRATA G EOTHERMAL E NERGY A Means To Extend Geothermal Energy Production To Deep Sedimentary Basins Dr. Richard J. Erdlac, Jr. The University.
The Potential Impacts of Co-produced Geothermal Waters Mid-cont. States with geothermal potential Water Produced in 2004 (kbbl) Total Water Production.
Adrian Larking, Managing Director 26 November 2007 Green Rock Energy Limited Annual General Meeting.
04 October 2004New and Classical Uses of Heat Flow Studies, Aachen1 Geothermal Resource Mapping of Northern Switzerland Thomas Kohl, Nathalie Andenmatten-Bertoud,
An Introduction to Heat Flow
District heating around Paris Guarantee policy Christian BOISSAVY Geothermal French Association for Professionals.
Cost and Supply of Geothermal Power Susan Petty Black Mountain Technology.
1 TEC-MTT/2012/3788/In/SL LMD1D v1 and v2 Comparison with Phoenix Flight Data Prepared by Stéphane Lapensée ESA-ESTEC, TEC-MTT Keplerlaan 1, 2201 AZ Noordwijk.
Orkuveita Reykjavíkur Sustainable Quality of Life Guðmundur Þóroddsson CEO June 16th 2007.
Geological Survey of Slovenia Characteristics of geothermal potential, current utilization and its future (challenges) in Slovenia Andrej Lapanje, Nina.
Alexey V. Kiryukhin 1 Leonid K. Moskalev Institute of Volcanology and Seismology FEB RAS 2 - SC “Geotherm”
Application of decision theory to the procurement of a geothermal power plant April 2nd 2008 Viktor Þórisson.
ENGINE Leiden Combining Areal Underground and Infrastructure Data to Minimize Exploration and Economic Risks Thomas Kohl, GEOWATT AG Clément Baujard,
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
Potential for water buffering A landscape based approach Lieselotte Tolk, et al.
Tecto Energy Pebble Creek Geothermal Project Outline Outline  World Geothermal Power Status  BC Geothermal Prospects  Pebble Creek (North Meager) Prospects.
Triassic geothermal clastic reservoirs in the Upper Rhine Graben The goal of this study is to make a first assessment of the Buntsandstein reservoirs (lower.

David Bridgland – Finance Director UNITED DOWNS DEEP GEOTHERMAL PROJECT 17 th November 2011.
Heat Flow Drilling as a Geothermal Exploration Tool Chris Matthews Technical Manager Australian Geothermal Energy Association Australian Geothermal Energy.
© NERC All rights reserved Potential geothermal opportunities in Scotland Martin Gillespie British Geological Survey.
ENGINE LAUCHING CONFERENCE ORLEANS Geothermal energy and strategies to reduce greenhouse gas emissions C. Fouillac Research Direction.
CO 2 -sequestration in abandoned coal mines Kris Piessens & Michiel Dusar Royal Belgian Institute of Natural Sciences Geological Survey of Belgium In order.
Opening address - Oscar Abbink Welcome to ENGINE Workshop 7 Leiden, The Netherlands.
Geothermal Energy Joanne Smith UK projections February 24 th 2005.
Powered by Rock Dr Liam Herringshaw Earth's Energy Systems.
State-of-the-art of thermal water utilization in the TRANSENERGY region: current state, potentials and challenges Nina Rman 1 Nóra Gál 2, Daniel Marcin.
Introduction to the TOPMODEL
The specification states that you need to be able to: The specification states that you need to be able to: Define and explain the following terms: Define.
Moving Geothermal Sites from Exploration Prospects to Economic Projects Jim Lovekin GeothermEx, Inc. California Geothermal Summit 9 June 2005.
Local Intelligent Networks and Energy Active Regions in Flanders Carlo Mol - VITO.
Selecting cost effective abatement measures to achieve good water status with the environmental costing model S. Broekx 1, E. Meynaerts 1, P. Vercaemst.
Program topic: Geothermal Technology
Joel Ben-Awuah. Questions to Answer What do you understand about pseudo-well? When to apply pseudo-well? What are the uncertainties in reservoir modeling?
For this goal, the reference system is based on the more challenging geothermal conditions likely to be encountered in many locations: moderate fluid temperatures.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Michael Feliks UK Operations Manager Cluff Geothermal.
References Bebout, D.G., Loucks, R.G., Gregory, A.R., Report of Investigations No. 91: Frio Sandstone Reservoirs in the Deep Subsurface Along the Texas.
The Risks around Renewables? March 2012 Campbell Dunford.
Subsurface resources in the Netherlands
Yao Tong, Tapan Mukerji Stanford University
Mn Association of County Planning and Zoning Administrators
Advance Seismic Interpretation Project
Institute of Energy and Environment & Institute of Geosciences – USP
Comparison of the thermal characteristics and temperature profile of the ground in Cyprus with other Mediterranean countries This work is supported by.
Recommendations for the management and monitoring
Instrumental Surface Temperature Record
RENEWABLE ENERGY POTENTIAL OF INDIA A REVIEW
Different scales of installation
Quarterly Journal of Engineering Geology and Hydrogeology
Impact of Flowing Formation Water on Residual CO2 Saturations
Geothermal Energy: An Overview
Energy: Powering Our Nation
9 CHAPTER Vapor and Combined Power Cycles.
Assignment #2 – Energy; Powering our Nation
Geothermal energy.
NS4960 Spring Term, 2018 China: Expanded Renewables
Instrumental Surface Temperature Record
Céline Scheidt, Pejman Tahmasebi and Jef Caers
Linking Geothermal Electricity Generation with Multiple Desalination Processes and Aquifer Storage and Recovery: A method to reduce fossil fuels use and.
by Jashar Arfai, and Rüdiger Lutz Petroleum Geology Conference
Instrumental Surface Temperature Record
Deep geothermal energy at Mol: The Balmatt-project
How does the geothermal energy work ?
Chapter HEAT AND ELECTRICITY GENERATION AND SYSTEM INTEGRATION
Presented in The 5th ITB International Geothermal Workshop Thursday, March 31, 2016 ON THE FEASIBILITY OF GEOTHERMAL HEAT PRODUCTION FROM A HOT SEDIMENTARY.
Presentation transcript:

The Balmatt Deep Geothermal Project in Northern Belgium Ben Laenen*, Matsen Broothaers, Virginie Harcouët-Menou & Sian Loveless Energyville, Dennenstraat 7, 3600 Genk, Belgium VITO, Boeretang 200, 2400 Mol, Belgium * phone: +32 14 33 56 38, e-mail: ben.laenen@vito.be VITO: from shallow to deep geothermal energy Since 1998, VITO is actively involved in new developments in geothermal energy in Belgium and the Netherlands. Initially, research focused on the use of shallow aquifers in combination with heat pumps for heating applications. VITO spin-off company, Terra Energy (www.terra-energy.be), continues this work on shallow geothermal systems and applications. VITO now focuses its own research on large-scale energy storage systems on the one hand and on deep geothermy for heating and electricity generation on the other hand. The Balmatt project in brief The geothermal plant will be located at the Headquarters of VITO, the Flemish Institute of Technology in Mol (Fig. 1). Targeting a carbonate reservoir with temperatures sufficient to match local heat and power demand. Final expected gross power output of up to 48 MW in 2020. A first well is planned to be drilled in early 2015. Subsequent development will be phased (Fig. 1), allowing for a gradual expansion according to surface requirements and aquifer conditions : 1. Geothermal doublet system connected to the high temperature heat network of the existing VITO/SCK sites, VITO’s new headquarter and other customers in and around the Balmatt site. 2. Additional wells will be drilled and electricity will be produced from a newly constructed ORC (Organic Rankine Cycle) and distributed to VITO and SCK. Surplus will be put on the general grid. The Balmatt project addresses both the technical and non-technical challenges for the development of geothermal energy in Flanders. The success of the project will pave the way for realisation of further geothermal plants in the Campine region. Fig 1. Location and development stages of the Balmatt site. Inset shows location in Belgium. Green region is Flanders. Geological setting Our geological model based on regional geological models and on newly acquired seismic data (Fig.2) reveals the targeted aquifer to lie at depths of between 2000 m and 3800 m (Fig. 3). This stratigraphic interval has been encountered in several wells in the Campine Basin, below the Coal Measures Group. The depth of the formation varies throughout the area, increasing towards the northeast. In the area of Mol, the depth is in the order of 2800 m below surface. Fig 2. Depth map for the top of the Carboniferous Limestone Group, based on data from the seismic survey 2D Mol-Herentals 2010. Fig 3. Geological setting of the geothermal reservoir with the location of the first well. Geothermal potential in Flanders In Flanders, the geothermal gradient is approximately 3 °C per 100 m and the heat flux varies from 50 to 90 mW/m2 (Fig. 4). The Balmatt project is located in the Campine area that has a heat flux of about 65 mW/m². The project targets water-bearing layers in the carbonate sequence of the Carboniferous Limestone Group. A static model calculated a temperature of 120°C can be expected at the top of the Carboniferous Limestone Group, and 142°C at the base. Fig 4. Heat flux map of Flanders. Energy demand in the region versus expected thermal output Five companies have been identified for heat delivery and 2 for power delivery with distances between 200 m and 8 km from the planned plant. The total amount of heat that could be provided towards the heat users equals 63.284 MWh/year. The remainder off the geothermal heat is available for power production. The geothermal potential under the Balmatt site is calculated as a P90 value (probability of success of 90% ) for the thermal output of a doublet. Calculations point to a P90 value of the thermal output of 12,6 MWth, with a flow rate of 140 m³/h (Fig.5). This was calculated using the DoubletCalc programme developed by TNO (Mijnlieff et al., 2012) and takes into account both geological and non-geological parameters and their uncertainty range (Table 1). Geological parameters were derived from data from reference wells in the Campine Basin, and from seismic surveys in the area. The achievable flow rate was calculated based on permeability data from several wells in the region and (large-scale) transmissivity from pump tests accounting for fractures, joints and vugs. Permeability also takes into account a depth trend of decreasing permeability with increasing depth. Table 1. Summary of the geological and non-geological parameters used to estimate the thermal output of the geothermal doublet. Fig 5. Probability chart for a) the geothermal output and b) the flow rate .