Overview WMU – Case Study Software Demonstration Best Practices

Slides:



Advertisements
Similar presentations
Home Inspections What you should know Brought to you by EDC Home Inspections.
Advertisements

Managing a Successful Mechanical System project Following design – what next?
Roof Analysis Summary (online view). Roof Drawing (online view with priority color & penetrations)
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
Ground Control™ Document Control and Training Manager
Equivalent Uniform Annual Cost: A New Approach to Roof Life Cycle Analysis James L. Hoff, DBA Firestone Building Products Canadian Roofing Symposium Calgary,
Computerised Maintenance Management Systems
2 V2T Roof System. Let the wind work for your roof. Generic Presentation. Updated 01/08/2015 The V2T Roof System uses the power of the wind to hold the.
Enhancing Student Support EUCLID IT Tools - Personal Tutor.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Green Building Demonstration Project Adam Saling City of San Diego.
BUNCOMBE COUNTY SCHOOLS ROOFING STATUS REPORT Presented to the Board of Education October 4, 2007.
PowerLight Confidential 1 SunPower / PowerLight Commercial Monitoring Services.
RAILROAD COMMISSION OF TEXAS Steven Rios Corpus Christi Area Manager September 2015.
Creating A Cleaner Energy Future For the Commonwealth Renewable Closed Landfills Eileen McHugh Municipal Energy Programs Coordinator July 26,
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Historical Warranty Repair Cost: A Measure Of Long-Term Roof System Performance James L. Hoff Firestone Building Products.
TPO Membrane attachment and Base Tie-In Adhered System System Design Adapts Easily To Unusual Roof Profiles or Slopes System Design Is Easy To "Beef.
Affordable Computerized Maintenance Management Solutions (CMMS) Gabi Miles Hach Company May 22, 2009.
Working together for housing solutions First Nation Housing On Reserve Section 95 Housing Program Overview Pine Creek First Nation – October 13, 2015.
1 Facility Benchmarking PASBO Kim Seldomridge Conestoga Valley School District Brad Furey Hayes Large Architects March, 2003.
Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Computerised Maintenance Management Systems
Once the designer has decided to use and selected the correct Magna 3 pump in a specific application they must communicate these decisions to the contractor.
InfoCentre May InfoCentre Overview InfoCentre used in over 90 million sq. ft. Web-based building management services for:  Workflow management.
BIM & FM in Hong Kong Public Rental Housing Projects.
FY2007 Budget Presentation Annual Town Meeting April 24, 2006.
Coastal Carolina University
Major Die & Engineering Co.
Large Scale Deployment of Mobile Work Management
From Sales Rockstar to Superstar
FTA and ADOT Grant Asset Management Requirements
Committee on Information Technology Planning and Budget Sub-Committee
Introducing the future of
Building Windsor WCA Presentation 2016.
Demonstration of Energy & Efficiency Developments
Tuition / Capital Projects and Facility Fee Proposals
SPEAKING THE SAME LANGUAGE: Ensuring a smooth lab turnover, from construction to operations John Ott  Introduce Presentation topic and us.
SC Railing Company Overview
Orlando VAMC Architect’s Rendering of the Proposed House
AUTHORIZATION TO INCREASE PURCHASE ORDER NO WITH CALE AMERICA BY $82,000 FOR A TOTAL AMOUNT NOT TO EXCEED $156,995 FOR CALE WEB OFFICE FEES AND.
Why did you choose us? To address and provide a solution to the many problems associated with your current manual filing system -Problems include: -Lack.
Total Productive Maintenance and Maintenance Management
Let’s Blog Using a Blog as a Communication Tool
Website Design.
Designers’ Manual Overview and Chapter Contents
Regional Sales Manager
Division of Air AirCom DARM’s New Compliance and Enforcement Database and Field Inspection Tool.
Regional Sales Manager
Product Development Scenario Overview
ePermitting Roofing System
Commercial Property Inspections
Construction and Materials Management System
Regional Sales Manager
Mayor’s Task Force On Adoption of 2006 I-Codes
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Modern Systems Analysis and Design Third Edition
Project Information Management Jiwei Ma
Asset Management Journey
Industrial Products Business challenge
Insert date.
Modern Systems Analysis and Design Third Edition
Modern Systems Analysis and Design Third Edition
Company X ISO9001:2000 Implementation Databases
New York State Utility Inspection & Testing
Project Manager Application
Commission Agenda Item #1
Commission Agenda Item #2
Presentation transcript:

Overview WMU – Case Study Software Demonstration Best Practices General Statistics

WMU Roof Portfolio 3,083,489 Sq. Ft. 107 Major Buildings 551 Roof Sections

Deferred Maintenance Fee Inception – 1997 Defined Funding Sources

Needs / Best Practices Accurate Data Standardization of Design “ A way to get our arms around it ” Accurate Data Standardization of Design Decision Making Tools Timely Bid Process Commissioning Preventative & Scheduled Maintenance

1 - Accurate Data Accurate Centralized Data Computerized System Easy User Friendly Access Linked AutoCAD Drawings Sorting and Analysis Capabilities

Initial Data Gathering Field Verification File & Archive Search 2 students & 2 years AutoCAD and Digital Pictures

2 - Standardization of Design Fully Adhered 60 mil EPDM Four way tapered insulation 20 year full system warranty Specifications exceed minimum warranty requirements Full coverage adhesives

Distribution by Age and Type

3 - Decision Making Tools What We Wanted First Response Reference Warranty Compliance Data Repair & Replacement Analysis Proposals & Reports for Clients

4 - Timely Bid Process

5 - Commissioning Manufacturer warranty inspection In house staff Inspections during construction Punch list Increased familiarity with roof & system

6 - Preventative & Scheduled Maintenance Preventative Maintenance TMA scheduling/work order generation Annual/Bi-annual Inspections

General Statistics 3,083,489 sf 107 major buildings 551 roof sections Distribution by type 37.0% - Fully Adhered & Mech. Attached (26.22 Acres) 20.6% - Ballasted (14.57 Acres) 10.2% - BUR (7.19 Acres) 13.1% - Metal (9.28 Acres) 11.6% - Dow Liteguard (8.23 Acres) 7.5% - Other (5.31 Acres) 1,343,523 sf under warranty $.08 - $.10 per sf annual maintenance 381, 949 sf replaced in last 5 years 472,182 sf added in last 5 years 3 FTEs

WMU Facility Guidelines Specifications WMU Facility Guidelines http://www.pp.wmich.edu/standards/index.html

Contact Information Ken Fifelski - Kenneth.Fifelski@wmich.edu Steve Macomber -Stephan.Macomber@wmich.edu