Off-Site Construction

Slides:



Advertisements
Similar presentations
3DM Construction Technologies 13 July 2006 Discovering offsite.
Advertisements

Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Construction Method, Material Selection & Building Services
151 MODERN METHOD OF CONSTRUCTION (PART 1)
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
 Waste Water Treatment Fax:
PREFABRICATED BUILDING Vargas, Valentina Vásquez, Carla.
Economic and sustainable implications of standardised components and modular assembly.
Magic Quadrants 1. Research Processes Behind Methodologies 2 Qualitative Insight Research Quantitative Market Research Magic Quadrants Market Scopes Hype.
Construction Industry Efforts and Capabilities to Support PBES Deployment. William G. Duguay J.D. Abrams, L.P.
Lecture 3 Apr 8, Discussion of chosen technologies 2.Lecture Technology and Market Acceptance 3.Case for Thursday.
Prefabricated Buildings Arantxa Hernández Nº Elizabeth Hernández Nº
A Revolutionary New Panelized Construction System Steel frame panels for each project are built in CHS’s manufacturing facility and delivered to job-site.
Prefabricated Timber Frame Construction
Barry's Advanced Construction of Buildings, Second Edition, by Stephen Emmitt and Christopher A. Gorse. © 2006, 2010 by Stephen Emmitt and Christopher.
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
BUILT TO LAST Assessing the Benefits of Modular Construction for Military Applications.
CSI315 Web Technology and Applications
Shaping Student Information Systems to Deliver Services in the 21st Century Presented by Maggie Hartley - Assistant Registrar for Records and Registration.
2010 Webinar Series Creating Your First Campaign Using Augmented Reality Andrew Bagley Director of Emerging Media, Sitewire Original Broadcast:
Turnkey Project Services Worldwide. Serving Heavy Industries Transportation and Logistics from Source to Foundation for: Power Generation LNG, Oil and.
CHARM Pre Commercial Procurement Support of Cooperative ITS Functions Ian Chalmers Highways Agency P4ITS Network Meeting Brussels Feb 2015.
Partnering. The West’s response to Japan’s greater efficiency in major manufacturing industries Japan’s approach is based on cooperative, long term relationships.
The Hype Cycle. The five stages in Gartner's interpretation of the Hype Cycle. 1. "Technology Trigger" is the first phase of a hype cycle. This could.
Printing: This poster is 48” wide by 36” high. It’s designed to be printed on a large-format printer. Customizing the Content: The placeholders in this.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
Management Approaches. Construction Management Customer appoints Design team and Management team.
TimeLine Phase 1: Planning Time: 1 year Phase 2: Construction Time: 6 months Phase 3: Installation Time: 1 month Phase 4: Student Involvement.
Manufacturing Systems at the enterprise level
Digital repositories: All hype and no substance? Marinus Swanepoel.
Karl Tuplin British Antarctic Survey Halley VI Project Manager Halley VI: An Antarctic Research Station.
Cross Wall Construction
Energy Seminar A prefabricated, non-disruptive approach to whole house energy retrofit. Stock assessment, appropriate properties and implementation. John.
DfMA – What does it mean? Rob Francis, Skanska. “The distinctive timber viaducts were constructed using common materials which was preserved by Kyanising.
Project Stakeholder Integration in Off-Site Construction May 24, 2016 Partners in Progress.
CoCType of commodity required Interior Trim - Cabin space e.g. Pillar trims (Plastic & fabric wrapped or unwrapped) - Rear cabin trim e.g. loadfloor, Loadspace.
Module Three Lifting with 60 inch Pry Bars and Cribbing.
° Role 1st Role 2nd Role What are we looking for?
advices for advancing the productivity of the construction industry:
Portable Cabins Sean Jordan Cabins has established itself as a market leader in the production of premium quality, multi-purpose Cabins offering advanced.
Prefabricated Timber Frame Construction
Iyad Alzaharnah, PhD – Director Innovation Center
Modularization 2011 Break Bulk Conference
Residential Wall Systems
CERN-ITER Workshop CERN Procurement Anders Unnervik 16 Jan 2017
Industrialised Building System (IBS) Global Adoption: Lessons Learned
Step Free Access Programme
Concepts used for Analysis and Design
Residential Wall Systems
Exploring Azure Event Grid
Best Ideas about Topics over Civil Engineering Seminar or Projects
Light Gauge Steel Frame
The Newcastle experience
FROM THIS WE CREATE:. FROM THIS WE CREATE: About us: Welcome to the exciting world of Umnyama Ikhaya, which means Rainbow Homes. We specialise in.
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Accelerating Housing Delivery through the use of modern methods of construction Embassy of Ireland Michelle Hannah 03rd May 2018.
6 MMC (Off Site Production)
Charles V. Trappey, National Chiao Tung University
Residential Wall Systems
Residential Wall Systems
GREEN ENERGY Hope or Hype?.
Manufacturing Systems at the enterprise level
Rising to the Challenge
Project delivery RIBA stages Define design deliver Key Objectives 1 2
KICK-OFF Overview and thematic approach 19th of June 2017
Offsite Construction Manufacturing BACH
…30 years in the Electro-Mechanical devices
A FEW MINUTES TO INTRODUCE OUR COMPANY
Digital Literacies for learning
Presentation transcript:

Off-Site Construction   ____________________________________________ Chris Goodier PhD MCIOB FICT FHEA School of Civil and Building Engineering Loughborough University 19th Jan 2017

Offsite construction Scene setting The need Types of offsite Offsite vs traditional? How to decide

The need Opportunity – lots of civil engineering needs

The need New Civil Engineer, 30/09/15 We shouldn’t worry that we don’t need people More a case of, How will we deliver? http://www.newcivilengineer.com/future-engineer/infrastructure-pipeline-needs-100000-recruits/8689669.article?blocktitle=News-Feed&contentID=13710 New Civil Engineer, 30/09/15

The need We also have targets to meet Construction 2025

But we do need to start doing some things differently, which is INNOVATION NCE Feb 2016, cover

So…… We have lots of infrastructure in the pipeline We have less people to deliver it We have numerous targets to meet: costs, delivery, emissions, exports etc We need to deliver things differently Offsite can help……

But before we get excited……

How long is innovation innovative? Gartner Hype Cycle Hype Peak of inflated expectations Plateau of productivity (ie acceptance of technology) Slope of enlightenment Trough of disillusionment 1999 Technology trigger Maturity / Time How long is innovation innovative? After Gartner, USA

NCE Feb 2016 ….. Gartner hype cycle a branded graphical presentation developed and used by US research and advisory firm Gartner for representing the maturity, adoption and social application of specific technologies through five phases from concept to practical application. Advanced Infrastructure Manufacturing and Operation (AIMOC) UKCRIC 1st March 2016

AR v VR

What is Offsite? Manufacture and assembly before installation Level 0 – Materials Level 1 - Component Sub-assembly Level 2 - Non-volumetric pre-assembly Level 3 – Volumetric pre-assembly Level 4 – Modular Building Different levels Pre-assembly is not new - accepted practice for structural frames, cladding panels and ductwork. Volumetric units create usable space, are finished internally and are installed within and onto an independent structural frame, e.g. toilet pods?, plant rooms, lift shafts. Modular building - volumetric units where each unit forms the structures fabric of the building, e.g. hotels, prison blocks, McDonalds.

Second Severn Crossing 1996

Level 2 - Pre-assembled services module for Brindley Place, Birmingham Courtesy Crown House Engineering

Level 3 Packaged Plantrooms Courtesy Haden

Level 4 – Modular Building McDonalds Courtesy Yorkon

But do we take full advantage? We usually…… design as ‘stick-build’ traditional Then decide to ‘go offsite’ http://slightlywarped.com/ http://i.ehow.com/

Or, we… DO decide early to ‘go offsite’ Then… forget about it….. Sometimes for well thought-out, logical reasons Sometimes not Then… forget about it….. thinking that offsite, by definition, will solve all of our problems…..

Offsite or onsite or both? Arup Global Research Challenge Innovative approaches to the modular construction of commercial buildings in transportation hubs

Arup – Future of Rail AIM  (what): develop a global strategic vision and local business models -virtual shopping mall -modules as cargo -tagging that will aid the improvement of the adaptability of platform-side commercial provision in transportation hubs.

But….. how much offsite? % offsite = Total Hours moved offsite . Total construction Hours (Stick Built) Volume? Weight? In Malaysia, 70% has to be IBS…… Does it matter?

offsite.lboro.ac.uk 2014 1999 Started career as Engineer & Manager Nuclear & Large commercial Jumped ship to academia early ‘90s Had to do research – what in? Prefabrication / modularisation Various research projects Wrote a book 20 years ago Included engineering construction – oil & gas, petro-chem Singapore Aromatics Plant What has changed? – Not much? offsite.lboro.ac.uk

Loughborough Offsite Projects Team Loughborough Offsite Projects CIRIA S&P/Offsite Buildoffsite IMMPREST HASPREST Whittles Offsite CRISP NHS Estates CIMclad Cladd:ISS Offsite Skills Offsite Sustainability Concrete Printing Adaptable Futures Offsite Infrastructure

1999

offsite.lboro.ac.uk

Login cgoodier Uni password offsite.lboro.ac.uk offsite.lboro.ac.uk

Offsite construction Scene setting Types of offsite The need Types of offsite Offsite vs traditional? How to decide tools available