CHARM facility update 23/04/2015

Slides:



Advertisements
Similar presentations
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Advertisements

CELeSTA CERN LATCHUP STUDENT SATELLITE TEST BOARD DEVELOPMENT AND CHARM PRELIMINARY RESULTS Raffaello Secondo ESA/ESTEC CERN Visit - DECEMBER 9 th 2014.
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
Abstract: Based on the principle of the RADMON on line radiation monitoring system for the LHC, a new type of low cost, battery powered radiation monitors.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
2012 H4IRRAD test campaigns Summary of results S. Uznanski CERN, Geneva, Switzerland Radiation Working Group meeting Oct 16, 2012.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
Fraunhofer Test-Campaigns March 25 th 2013 (R2E) Mitigation Project: RadWG March 25 th 2013 FRAUNHOFER Test-Campaigns & Facilities M. Brugger.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.
RADWG 6 TH TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
TRIUMF and ISIS Test Facilities Radiation 2 Electronics (R2E) LHC Activities TRIUMF and ISIS test facilities Rubén García Alía, Salvatore Danzeca, Adam.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
HF FE Radiation tests at the CHARM facility Tullio Grassi 4 June 2015 Documentation on:
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Mar 26, 2014 FGClite Power Control TE-EPC-CCE.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
IEAP – CTU Prague Measurement of neutron flux during irradiation in NPI Řež T. Slavíček, V. Linhart, S. Pospíšil Institute of Experimental and Applied.
New Irradiation Test Facility : CHARM June 10 th 2014 CERN R2E project CHARM Introduction June 10 th 2014 New CERN Irradiation facility : CHARM !!! Many.
Planning and strategy for HL-LHC R2E
Matters arising RADWG - 3 July 2009
CERN/SSC Technology Transfer Day
Cryo equipment strategy in the R2E context
HF Test station at P5 A.Mestvirishvili.
RD51-WG X June test beam experience: useful information for October
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
CMS November Upgrade Week
Status of the MOPOS BI TB – 26th June 2014.
352MHz Klystron Control for the 3MeV Linac test stand
CNRAD dosimetry and Summary of the TS
10/month is the present production rate 2 FTE + sporadic contributions
Ongoing BE-BI developments going to be exposed to radiation
F.Guber, A.Ivashkin INR, Moscow
Alexander Herlert, CERN (PH-SME-IS)
RPC Detector Control System
MICROFIP-Do we need further tests? 28th June 2011
RPC Detector Control System
Upgraded Injector Test Facility
RADWG Meeting February 2017
Radiation Working Group RADWG
Presentation transcript:

CHARM facility update 23/04/2015

1st year - 2014 Construction of the facility has been finished last year on the 9th of October Intensive commissioning period from 10/10/2015 during 1 month First operation period has been performed from 12/11/2014 to 15/12/2014 (≈ 1 month) Within this period we made radiation tests for 10 users on 14 different equipment (in parallel)

1st year - 2014 14 equipment 10 users Group Technical responsible Equipement EN/STI Giovanni Spiezia/Raffaello Secondo/Salvatore Danzeca RadMON V6 Ruben G, Alia / Slawosz SRAMs Gilles Foucard/Paul Peronnard JDI tester IT/CS Alberto Garcia Molero IT beacons TE/CRG Nikolaos Trikoupis/ Juan Casas Cubillos Cryogenic electronics crate LEDs TE/EPC Slawosz Uznanski Components SRAM Renesas ADS1271 Delta-Sigma ADC Lionel Foro / Louis de Mallac Components tester (Op-amp, Comparator, power MosFETs etc …) UM2_EN/STI Raffaello Secondo Cubesat Julien Mekki Capa MOS INFN Massimiliano Fiorini PCB board and wires 14 equipment 10 users

Dedicated test position 1st Run Analysis Radiation levels at the different locations are being analysed Benchmarking is being performed between experimental measurements (RadMON / BLM) and Fluka simulations Results have been provided to the users TID 1 MeV neutron eq. fluence HEH fluence Dedicated test position Radiation test period

Winter Shutdown From 15/12/2014 to about Mid-April 2015 → Winter Shutdown Dedicated to the upgrade of the facility – Main activities: Montrac upgrade → Allow for a proper connection with the cable holder chain Revolver redesign and upgrade of the control system → Allow for a better accuracy Movable shielding → Bug with the switches solved EN/EL activities (light, new cabling, activities inside the facility) → Done (activities outside still to be done) Reception / Test / finalization of the installation for the AGV → Tests with the cables holder chains See video Repair of the Mantion System + new variators for the motor + speed adjustement for the conveyers Dry run station for water cooling finished And others… →

2nd year - 2015 Planning for Run2 Next 2 weeks → Commissioning

2nd year - 2015 Planning for Run2 We start to operate with users on the 11th of May

2nd year - 2015 Planning for Run2 In-beam test periods → No target and blown-up beam

2nd year - 2015 Planning for Run2 High Intensity period

2nd year - 2015 CERN users (25 users) External users (14 users) EN Department (10 users) EN/STI → 7 Users (Components test / Tester / Sensors / Cubesat / Optical fibers / RPL dosimeters…) EN/EL → 3 Users (Data concentrator / Light system / UPS system) TE Department (8 users) TE/EPC → 3 Users (FGCLite/ Components test / Tester / Full power converter system …) TE/MPE → 2 Users (Remote I/O interlocks equipment, QPS equipment) TE/CRG → 3 Users (Beam screen heaters system / Remote Sipart positioners …) BE Department (3 users) BE/RF → 2 Users (High bandwidth solid state amplifiers / PS electronics) BE/ASR → 1 User (Ionization chamber electronics for Linac4) IT Department (1 user) IT/CS → 1 User (Safety and network repeaters) PH Department (3 users) PH/ESE (collaboration with PH/UAT and University of Liverpool)→ 1 User (ASICs test) PH/AID → 1 User (MAPs sensor) PH/ULB (collaboration with INFN) → 1 User (LHCb RICH readout detector system) External users (14 users) France : University of Montpellier, Zodiac system company → Cubesat / Memories / Mixed Analog Digital devices / Full digital system / dosimeters …) Spain : University of Malaga → Dosimeters USA: Brown University → CMS HF Front end electronics cards / full crate Germany: DLR, Infineon → Applications for Robotic in space / Memories Czech Republic: IEAP → Timepix Japan: KEK, Hiroshima University → NE213 measurements Russia: URSC ISDE Institute → Cross calibration / space applications + More → Still in discussion

List of users – Requests Received For the Moment I got 7 radiation test requests: TE/EPC : Components tester TE/MPE: Remote I/O interlocks equipment TE/MPE: nDQQDG board PH/ESE: ASICs test (Blown up beam) PH/AID: MAPs Sensors PH/UCM: CMS HF Front end (electronics board + crate - 2 slots of irradiation) EN/EL: Field concentrator for the supervision of the electrical network Any others ?