Kent Harrell-Engineering Martha Zeigler-Customer Service

Slides:



Advertisements
Similar presentations
Toward a participatory infrastructure of civic online spaces: designing for citizen knowledge work Michele Simmons Miami University.
Advertisements

Public/Private Partnerships for Water & Wastewater Systems 2006 ACMA Summer Conference Loews Ventana Canyon Resort Tucson, Arizona.
1 Informational Meeting March 5, 2003 Perry Township Administration Building Delmar Addition/Glenn Avenue Sewer Improvement Area.
Response to LDEQ Consolidated Compliance Order and Notice of Potential Penalty.
AECOM Technical Services, Inc. February 18, 2015 Tiverton Wastewater District Sewer Construction Program Updates to Proposed Phase 1 Sewer Expansion Note:
Funding Application Workshop for State Fiscal Year 2014 (SFY 2014) Water Quality Program 1.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
Utility Extension Project
A Class and Fleet Development Activity 1. What is “The Great Snipe Hunt” The Great Snipe Hunt is a fleet building activity aimed at locating missing snipe.
© 2008 Dearborn Real Estate Education CHAPTER 4 HOW TO READ TITLE WORK LIKE A PROFESSIONAL.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
Transportation Enhancements Application Workshop Welcome!! October 3 & 4, 2012.
© 2008 California State University, Fullerton Introduction To Trust Fund/Special Projects Management Laleh Graylee Cecilia Patz Financial Services Division.
Overview Asset Management (AM) is a systematic process of operating, maintaining, upgrading and disposing of assets cost- effectively while maintaining.
College Financial Planning Workshop V: Funding Your Education Glow Foundation Online Version for Program Course Credit
Program Name or Ancillary Texteere.energy.gov April 1, 2010 Molly Lunn, SEP and EECBG Technical Assistance Lead Technical Assistance Overview Resources.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
BTLearningCenter Copyright BuildTopia 2006Page 1 ****Read Me**** You will delete this slide after you have reviewed it. Review all slides in this presentation.
Marquis Hills Area Construction Update Meeting May 5, 2016.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
Marquis Hill Area Construction Update Meeting December 2, 2015.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Mandatory Connection 1 st Information Meeting. Review project Explain mandatory connection process via Frequently Asked Questions Answer questions Supply.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Mandatory Connection 2 nd Information Meeting November 17, 2015.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Goochland County Administrator FY18 Proposed Budget
Heritage Park Area Construction Update July 28, 2015
Made possible through funding from the Great Lakes Water Authority.
Stage 2 Light Rail Transit Program “In the ground ready”
Overview Rationale Funding Phased Plan Leak Control Program Other Aspects Next Steps.
Marquis Hills Area Information Meeting September 13, 2016
Marquis Hills Area Information Meeting December 7, 2016
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Marquis Hills Area Information Meeting December 7, 2016
Community Retrofit Program
Funding Lead and Copper testing in public schools
Overview May 24, 2017.
Local Government Engagement and Communication Strategy
Local Government Engagement and Communication Strategy
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
FY Proposed Budget and Rates
Show Me the Money: Partnerships and Sponsorships
Identifying and Assessing CWSRF Funding Trends
Item 8A Authorize staff to establish a new standard operating procedure (SOP) with the authority to waive the sewer tap fee for an incentive period of.
Utilities Department Wedgefield Water November 28, 2017.
Springbrook Estates Sewer Improvement Area Informational Meeting
Transportation Alternatives (TA) Set-aside
EPAD-Louisville 101 EPAD-Louisville 101 Making Cent$ of Energy
Six Month Financial Status Update and Mid Year Budget Reconciliation
Environmental Education/Air Quality Education for Elementary, Middle and High School Audiences Kansas Association for Conservation and Environmental Education.
Common Sense Steps Towards Strong Financial Planning
Designing Useful Information for Community Decision Making: A Civic Website Research Project Michele Simmons Miami University M. Simmons | CCCC 06.
Public Hearing Sanitary Sewer Fees
Financial Basics for Entering Medical Students
Capital Improvement Plans
Financial Status Update & FY Proposed Biennial Budget
Biltmore C Proposed Water & Sewer Improvement Project
City of Smithville Tax Rate Public Hearing and Budget Workshop #2
Village of Naples New Sanitary Sewer System Final System Layout
GDPR Dashboard General Data Protection Regulation 06/02/2018
Toward a participatory infrastructure of civic online spaces: designing for citizen knowledge work Michele Simmons Miami University.
Local Postal Customer or mailing labels here Delete this text box
Local Postal Customer or mailing labels here Delete this text box
Bannock County Comprehensive Plan
Roanoke County Public Schools Budget
Office of Student Financial Aid and Scholarships
Presentation transcript:

Kent Harrell-Engineering Martha Zeigler-Customer Service Middle Sound Mandatory Connecti0n Workshop Kent Harrell-Engineering Martha Zeigler-Customer Service

Agenda Welcome – Kent Harrell Project Area Project Overview Workshop Objectives Tracking FAQ’s-Engineering and Customer Service Workgroup Breakout Stations

Project Area

Project Overview Planning, Design and Funding 1990’s Clean Water Management Trust Fund Pollution and Health Risk Reduction Construction Began 2003 1500 parcels to connect Mandatory Connection suspended 2007 634 Parcels remaining to connect 2007 Outstanding Road Repairs Creek pollution ongoing Resume Mandatory Connection 2009

Objectives Workshop Objectives: Project Objectives: Resume the mandatory connection process Reach out to the Middle Sound Community Review project schedule Clarify issues arising from the connection process Conduct interactive question and answer sessions; Project Objectives: Improve environmental quality in the community Initiate outstanding road improvements Complete sewer connection project

Schedule 07/30/09 Homeowner Outreach Meeting 08/14/09 Mandatory Connection Period Start 10/15/09 Connection Deferral Deadline 02/15/10 Mandatory Connection Deadline 03/15/10 Public Bid for Road Repairs 05/21/10 Award Contract for Road Repairs 12/15/10 Road Repairs complete

Online Status Map Legend Green = Connected Yellow = In process Red = Not Connected Orange = Vacant

Information Stations Road Repair Taps and Plumbing General ?’s, Deferrals, Status, etc. Applications, fees, loans, billing. NHC Health Department–Septic Systems Coastal Federation NH Soil and Water Conservation District

Engineering FAQ’s Kent Harrell What is this project all about? What are the benefits to me? When will our roads be fixed? Can I do the plumbing work myself? Might I be exempt from this process? What is the deadline for connection? What if I miss the deadline?

Customer Service FAQ’s Martha Zeigler How much will it cost? What financing is available for associated fees? What do I need to do to connect? How can I get help with the application process?

FAQ’s What do I need to do to connect? Residents of the affect area will receive a package via U.S. postal service. This package will include: 1. Instructions for connection 2. Application for service 3. Summary of Billing and Collection Policies 4. Water and Sewer Connection Loan Policies 5. Loan Application for Connection Charges 6. Loan Billing and Collection Policies

Breakout to Information Stations Contact Information http://www.cfpua.org 910-332-6900