Network Diagram Prob 1 Activity Predecessor Duration (days) A None 2 B

Slides:



Advertisements
Similar presentations
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Advertisements

Network Analysis. COPYRIGHT TOM SULZER © 2015 A (4) B (3) G (8) C (5) H (12) D (3) F (4) E (6) Network Analysis  Determine the activity slacks  What.
CPA A house is to have new carpets fitted throughout. The work involved has been divided into a number of tasks, as shown in the table.
Network exercise (P2) Consider the PERT/CPM network shown below. D A 2
Construction Planning and Scheduling A G E NG 520 Schedule Computations Part #2 1. Definition and Computation of Total and Free Floats: Total Float : The.
CPA Setting up an ICT system. A consultancy company has divided the work into a number of activities. The table below shows the details. ActivityImmediate.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Activity networks – Example 1 TaskDuration (hours)Immediate predecessors A3- B4- C6- D5A E1B F6B G7C, D, E The table below shows the tasks involved in.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
Project Management Dr. Everette S. Gardner, Jr.. Project Management2 PERT / CPM advantages 1. Disciplined planning 2. Realistic objectives 3. Unambiguous.
Experiment No. 2 Critical Path Duration (week) Precedin g Act. Activity 3-A 2-B 2BC 3AD 2AE 3C,DF 2 G 7C,D,EH 5 I 6H,FJ Draw the network diagram for the.
1 Microsoft Project 2010 Demo Part 1. 2 Project: Initial Screen To start click Project/Project Information. Add start date.
Network Analysis Terminology
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
Find the geometric mean between: 1.4 and and and and 20 Geometric Mean x is the geometric mean between a and b. a x x b = Similarity.
Project Scheduling Class 7.
Project Crashing. c=6 e=9 b=6 a=7 f=8 g=5 d=4 Given the information below, what is the total additional cost to crash the project as much as possible?
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Dependencies and Network Diagrams. Agenda Dependencies Milestones The Network Early/Late Start/End dates Slack/Float Critical Path.
Q1) A precedes C. B precedes D & E. C precedes F & G. D precedes G.
15B Critical path analysis. In a critical path analysis, edges represent activities. Nodes (vertices) represent the end of one activity and the start.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
5-1 Scheduling The Project. Outline: 5-2  Project network diagrams  Identifying critical paths and activities  Determining activity slack times  Gantt.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Time Planning and Control Time-Scaled Network
RESOURCE SCHEDULING references:
Animation of a planning
QUIZ REVIEW.
The Project Schedule and Budget
Activity networks – Example 1
Operations Research Lecture 5.
Problem solving.
Critical Path Analysis (CPA)
RESOURCE SCHEDULING references:
Project Time Management.
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Project Management
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Project Management CPM Method Tutorial-p2
Magister Sistem Infomasi Universitas Komputer Indonesia
Time Planning and Control Time-Scaled Network
Project Management CPM Method Tutorial-p1
תזמון פרויקטים.
Critical Path Analysis 2
Analysing the AoA network
BEST VIEWED IN SLIDE SHOW MODE
Microsoft Project 2007 Demo Part 1
Planning assignment in MS-Project
In-Class Scheduling Exercise
LECTURE 3.
Uncertain activity duration (P14)
Lesson Objective Understand Cascade diagrams and be able to use them to draw resource histograms.
Exercise – A small building.
Analysing the AoA network
Uncertain activity duration (P14)
Operations Research Lecture 9.
Presentation transcript:

Network Diagram Prob 1 Activity Predecessor Duration (days) A None 2 B 3 C 1 D E C,D 4 F G Draw network diagram and apply duration to activities Determine number of paths and list Determine critical path

Network Diagram Prob 2 Activity Predecessor Duration (days) A None 2 B 3 C 1 D E 4 F D,E G Draw network diagram and apply duration to activities Determine number of paths and list Determine critical path

Network Diagram Prob 3 Activity Predecessor Duration (days) A None 2 B 1 D B,C E 4 F G Draw network diagram and apply duration to activities Determine number of paths and list Determine critical path

Network Diagram Prob 4 Activity Predecessor Duration (days) A None 2 B 3 C 1 D 6 E C,D 4 F G Draw network diagram and apply duration to activities Determine number of paths and list Determine critical path

Network Diagram Prob 5 Activity Predecessor Duration (days) A None 2 B 3 C 1 D 5 E F D,E G Draw network diagram and apply duration to activities Determine number of paths and list Determine critical path