(State Initiatives and Unsolicited proposals projects)

Slides:



Advertisements
Similar presentations
A Path breaking Technology for Network Maintenance and Optimization
Advertisements

Sistan & Balouchestan Electric Power Distribution Company
I Situation of water supply and sewerage in Beijing 1. General situation of water supply business Beijing, the driest city in the world: Lack of water.
E LECTRICIDAD A NDINA Carbon Finance Risk Management Workshop Peruvian small hydros 19 th November 2003 Project Presentation Peru Hydros Strictly Private.
Surat Wastewater Recycling Project through PPP Approach SACOSAN IV – Group Discussion on Urban Sanitation Dr. Anand Chiplunkar 07 April, 2011.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
PROJECT PORTFOLIO. PROJECTS IN TRANSPORT INFRASTRUCTURE.
ZPC – Power and Energy Projects
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Lima - Perú. Huanuco Pucallpa Tingo María 3 Huancayo 2 Dv Cerro de Pasco La Oroya Pte Ricardo Palma Ramiro Prialé 1  Section 1:Ramiro Prialé - Bridge.
May 2005 The French Water Services: Main present challenges.
Meeting AECOM, AM SOP-T, CFR, JASPERS
Investment Opportunities in Brazil. Some Highlights of Chinese Investments in Brazil.
“ MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA ”
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
June 2013 Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Infrastructure Russia and Central Asia.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Buenos Aires Subway Expansion Country:Argentina Borrower:Government of the City of Buenos Aires Project: US$ 2.5 billion IDB Loan: US$ 1.5 billion Objective:Expansion.
Ruataniwha Water Scheme HB Today Public Meeting 6 August 2015 HBRIC is a subsidiary (CCO) of Hawke’s Bay Regional Council H AWKE’S B AY R EGIONAL I NVESTMENT.
PPP in Lithuania March, 2011.
SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
INTEGRATED RIVER BASIN MANAGEMENT: FROM THEORY TO PRAXIS B.P.F. Braga Director Agência Nacional de Águas Regional Workshop and Capacity Building Training.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
National Planning Department. Mobilizing private investment for low carbon development October 14 th, 2015.
Priorities in the sector “Transport”
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute.
- DISCOVER THE DIFFERENCE - Florida’s Natural Energy - DISCOVER THE DIFFERENCE -
Annual Meeting 2013 Business Opportunities IDB Financing in Latin America and The Caribbean.
Cost recovery study for the Seine Normandie RBMP.
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
Investment opportunities in public infrastructure
Investment Opportunities in Public infrastructure and Public Service Infrastructure – ProInversion Updated to September 2.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
Investment opportunities in infrastructure and energy Korea and the Pacific Alliance.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
ENDLESS INVESTMENT OPPORTUNITIES IN PUBLIC INFRASTRUCTURE AND SERVICES March 7,2014.
Public Private-Partnerships for Urban Infrastructure: The Potential Benefits and Risks - New York, USA PPPs in São Paulo State: environmental risks and.
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
JEA’s Initiatives and Capital Improvements Program
Progress Briefing - Energy Initiative
Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Transport Team 12 March 2013.
Prof John L Wilson EA Infrastructure Spokesman
Royal HaskoningDHV Enhancing Society Together
Information about the resort recreation area "Kenderli"
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Jean Carlos Pejo - Chairman ALAF Brazil October 23, 2014
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
INTERNATIONAL PUBLIC TENDER:
Energy day July 3th, 2012.
uacn property development company plc
Applications of Optimization
Overcoming Water Scarcity in South America's Largest City
Townsville Water Infrastructure Securing the Foundations of Prosperity
Republic of Kazakhstan Priority Issues in 7 Major River Basins
A People Serving Profession
Prof John L Wilson EA Infrastructure Spokesman
Fox Creek Operators Group
Aleksandar Nikcevic, Principal Banker
Infrastructure Projects Facility and the Western Balkans Infrastructure Initiative Brussels, 25 November 2008 Christos Gofas DG ENLARGEMENT D3.
BRIEFING ON THE INTERCONNECTION LINES OF THE
Bringing Power from the North
Bringing Power from the North
POrt AND TERMINAL Durban port shipping and logistics
Papua New Guinea and Asian Development Bank: “A Growing Partnership”
Presentation transcript:

Investment Opportunities in Public infrastructure and Public Service Infrastructure – ProInversion (State Initiatives and Unsolicited proposals projects) 2016- 2018 Updated on November 28, 2016

LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 4 CALLED Execution of upgrade and rehabilitation works (117 Km), initial periodic maintenance (503 Km); and subsequent maintenance and operation of the 970 Km highway, of this important national highway connecting 12 departments and runs the Andean regions from end to end. Projected Investment(w/o VAT ): US$ 446 million Does not include routine and periodic operation and maintenance Type of concession : Co-financed PPP Concession period: 25 years Estimated award date: Q I 2017 3 3

THE AMAZON WATERWAY CALLED Loreto Ucayali Works and actions to improve navigability on the Amazonas, Marañón, Huallaga and Ucayali rivers: More than 2500 km along this 4 amazon rivers. Projected Investment (w/o VAT ): US$ 70 million Type of concession: Co-financed PPP Concession period: 20 years Estimated award date: Q I 2017 Ucayali

HUANCAYO - HUANCAVELICA RAILWAY CALLED The project comprised the comprehensive rehabilitation of the 128 Km of the existing railway. Railway upgrade Purchase of rolling stock Reinforcement of 15 railway bridges Extension of 38 tunnels Upgrades to signaling and telecommunication systems Draining works Projected Investment (w/o VAT ): : US$ 204 million Type of concession: Co-financed PPP Concession Period: 30 years Estimated award date: Q I 2017 Junín Huancavelica Central Railway Huancayo – Huancavelica Railway South Railway

PANAMERICANA SUR HIGHWAY : ICA- DV. QUILCA SECTION UNDER EVALUATION Unsolicited proposal for the concession of the construction, operation and maintenance of infrastructure works on the South Panamericana Highway, Ica – Detour Quilca section (Department of Arequipa), with an approximate length of 518 Km. Projected Investment : Under evaluation Type of concession: Self-financed Unsolicited proposal. Estimated award date: Q III / IV 2017 Ica Arequipa 6 6

LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 5 TO BE CALLED Initial periodic maintenance, operation and maintenance of 422 Km of the road that links Cusco with Puno. Projected Investment : Under evaluation Type of concession : Co-financed PPP Estimated award date: To be defined 7 7

PORT TERMINALS UNDER EVALUATION Self-financed unsolicited proposals: Salaverry: Upgrading and development of Salaverry multipurpose terminal. Foreseen date for the publication of the declaration of interest: Q I 2017 2. Ilo: Development and operation of Ilo multipurpose terminal. Foreseen date for the publication of the declaration of interest : Q I 2017 Ilo Salaverry

8. ANILLO VIAL PERIFÉRICO DE LIMA METROPOLITANA Y EL CALLAO UNDER EVALUATION Unsolicited proposal for the construction, financing, operation and maintenance of a 33 kilometers ringroad expressway, from northwest to southeast Lima. Type of concession: Co-financed PPP Foreseen date for the publication of the declaration of interest: Q I 2017 Estimated award date: Q IV 2017 Lima y Callao Trazo anillo vial

LINES 3 AND 4 OF THE METRO OF LIMA AND CALLAO TO BE CALLED Line 3 Comprehensive Project Bid (DFBOT) through two independent bids, for Line 3 and 4 of the network of the metro of Lima and Callao for the design, financing, construction, equipment, operation and maintenance, which will serve a 3.5 million of a total of 10 millions of inhabitants. Projected Investment : Under evaluation Type of concession: Co-financed PPP Line 4 Line 3 Next week, the Committee will approve Reference Terms to engage the services of a transaction advisor. Studies are expected to take 2 years. Line 4 Reference Terms to engage the services of a transaction advisor have not been prepared yet. Line 3 Line 4 32 Km 30 Km TO BE DEFINED Approximated length Lima and Callao Estimated award date Line 1: Under Operation Line 2: Under Construction 10 10

QUILLABAMBA THERMAL POWER PLANT CALLED Concession for the design, financing, construction and operation of a 200 Mw thermal power plant (simple cycle) to be located in Quillabamba (department of Cusco) which shall begin operations in 2017 and be connected to The National Electric Power Grid (SEIN) Projected Investment (w/o VAT ): US$ 180 million Type of concession: Self-financed PPP Concession period: 20 years Estimated award date: To be defined Sistema Eléctrico Interconectado (SEIN) National Electric Power Grid (SEIN)

AGUAYTÍA – PUCALLPA 138 KV ELECTRIC TRANSMISSION LINE CALLED Concession to design, finance, build, operate and provide maintenance to an electricity transmission line measuring 132 km long, approximately and with a 80 MVA capacity. The aim is to strengthen supply to the Pucallpa Sub-station, which presently has trouble meeting the rising demand focused on this sub-station. Once this new circuit starts operating in parallel with the current one with the same capacity will provide a greater power transmission capacity and reliability in the power supply from Sub-station Pucallpa. Projected Investment (w/o VAT ): US$ 20.3 million Type of concession: Self-financed PPP Concession period: 30 years plus the construction period (33 months) Estimated award date: Q I 2017

HYDROCARBONS

CALLED MASS USE OF NATURAL GAS FOR THE CENTER AND SOUTH OF PERU Concession for the design, financing, construction, operation and maintenance of the Gas Natural Distribution System by pipelines network in 07 regions of Peru: Junín 5. Apurimac Ucayali 6. Cusco Huancavelica 7. Puno Ayacucho 2 Projected Investment (w/o VAT ):US$ 350 million Type of concession : Self-financed PPP Concession period: 32 years Estimated award date: To be defined 1 6 3 5 4 7

AUCTION OF AGRICULTURAL LANDS - CHAVIMOCHIC PROJECT TO BE CALLED Initial auction of 17,000 hectares of agricultural land of the Chavimochic project, located in the department of La Libertad with an irrigation water to be provided by the project’ concessionaire. Base price : US$ 5000 /ha Modality: Public auction* Foreseen auction: II Semester 2017 *Commitment of subscription of water supply contracts with the concessionaire

ANCÓN INDUSTRIAL PARK (AIP) TO BE CALLED The AIP project consists of developing a modern area for industrial businesses of different sizes in Metropolitan Lima, operating under international standards, promoting efficient and collaborative interaction between different agents related to production but a reference for innovation, trendiness, technology, sustainability, entrepreneurship and development. Projected Investment : USD 500 million aprox Type of concession: Asset Transfer with investment commitment. Concession period: 15 years Estimated award date: Q IV 2017

SANITATION AND HEALTH

MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA Concession for the design, financing, construction, operation and maintenance of the following infrastructure: Re-enlargement of two dams Trans-Andean tunnel (about 10 Km) New drinking water plant Huachipa II (5 m3/s) South branch pipeline (about 40 Km), including seven reservoirs (total storage volume: 49,000 m3) Interconnection lines (90 Km approx) with the current drinking water supply system. The concession also includes the operation and maintenance of the following facilities: Huachipa Intake (12 m3/s) Huachipa I drinking water plant (5 m3/s) North branch pipeline (27.1 Km), including four compensation reservoirs (total storage volume: 23,000 m3 ) Projected Investment (w/o VAT): US$ 600 million Type of concession : Self-financed PPP Concession period: 30 years Estimated award date: Q II 2017 TO BE ANNOUNCED CALLED

THREE NEW HIGH-COMPLEXITY HOSPITALS TO BE CALLED Concession of the design, construction, equipment, operation and maintenance of complementary services in three high-complexity hospitals in the Peruvian Social Security System (ESSALUD) Projected Investment : US$424 million Type of concession: Co-financed PPP Estimated award date: Q III 2017 Piura Ancash Lima

Water Treatment System for Titicaca Lake basin UNDER EVALUATION Unsolicited proposal consisting in the development of a solution for the treatment and final disposal of municipal wastewater in the Titicaca Lake basin in Puno. Type of concession: Co-financed PPP Projected Investment : Under evaluation Foreseen date for the publication of the declaration of interest : Q II 2017 Puno

04 MINING EXPLORATION PROJECTS TO BE CALLED Investment Projects under the modality of transfer contract for a period of 3 to 4 years for the exploration and feasibility study of the following prospects: Apurímac: Colca: Cu, Mo, Ag, Au, Pb Q II 2017 14,100ha Jalaoca: Cu, Mo, Ag, Au, Pb Q III 2017 6,400 ha Antabamba: Cu, Mo, Au, Zn Under evaluation 19,200 ha La Libertad Pampa Grande: Au, Ag Under evaluation 8,700 ha Estimated Award Area Type of concession: Assets transfer Projected Investment : Under Evaluation

www.proinversion.gob.pe