ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.

Slides:



Advertisements
Similar presentations
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Advertisements

Cryostat Assembly 17 September 2008 Martin Nordby, Rafe Schindler, Gary Guiffre, Rick Van Berg.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Integration and Test 14 October 2008 Martin Nordby.
Camera Electronics Systems September 2008 Rick Van Berg.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Control Software Integration German Schumacher T&S Software Lead.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
MCAO Adaptive Optics Module Mechanical Design Eric James.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Telescope Integration and Tests Tuesday Afternoon.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Installation of the T600 at Fermilab CSN2, September 22,
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
LSST SLAC Office of Communications August 8, 2016 Communications Roadmap.
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Status Update & Overview Charles (Chuck) Claver LSST System Scientist SAC Meeting March 5, 2017.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
LSST External Communications Suzanne Jacoby, Andrew Gordon Communications Leads at LSST and SLAC August 17,
Cryoplant Controls Installation
Camera Maintenance and Access
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
ComCam Interfaces Travis Lange ComCam TDR May 10, 2017
GLAST Large Area Telescope:
Mike Anerella December 17, 2013
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning: FY18 Planning
ComCam Utilities Travis Lange Scott Newbry Camera I&T Mar. 6, 2017
Alistair Walker Version 3 December
LSST Commissioning Kevin Reil LSST Commissioning Camera Rep
ComCam Cryostat Justine Haupt Mar. 6, 2017
WP1 Metrology & Alignment
LDF “Highlights,” May-October 2017 (1)
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: DOE Budget Summary Vincent Riot LSST Camera Interim Project Manager LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
LSST Control Software Integration Francisco Delgado OCS Software Manager LSST Commissioning Plan Review January 24-26, 2017.
Software & Hardware for Wavefront Estimation Pipeline Development Te-Wei Tsai Software Engineer Joint Technical Meeting March 6, 2017.
Launch and On-orbit Checkout
FourStar 4K x 4K JHK imager
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Vendor Interactions Paul J. Lotz.
GLAST Large Area Telescope
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
LUSI Controls and Data Systems W.B.S. 1.6
NEH - Status Stefan Moeller.
NSS integrated installation plan workshop Introduction
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Question 1: Contingency for “extra” year
ATST Instrument Interface Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15

Message box example for short highlighted messages. Agenda ComCam Team Brief ComCam Description Review division of responsibilities between Camera and T&S Review Schedule Camera Project T&S Project Interfaces Message box example for short highlighted messages.

ComCam Description The LSST Commissioning Camera (ComCam) is a single raft 9-CCD instrument that will be used during the Project’s 6-month Early Integration and Test period

Message box example for short highlighted messages. ComCam Team Camera Kevin Reil LSST Camera Commissioning lead Travis Lange Lead engineer on the Camera I&T team Scott Newbry Mechanical engineer on the Camera I&T team Justine Haupt Mechanical engineer from BNL Tony Johnson Manager of the Camera Control System subsystem Mike Huffer Manager of the Camera DAQ Margaux Lopez T&S James Howard ComCam CAM, Mechanical engineer Sandrine Thomas T&S Subsystem Scientist Gary Poczulp Optical Shop Supervisor Ming Liang Optical Engineer Paul Lotz Software Engineer Te-Wei Tsai Oliver Wiecha Electrical Engineer Message box example for short highlighted messages.

ComCam Responsibilities Telescope & Site Camera Commissioning ComCam Integrating Structure Utility Box Refrigeration Pathfinder Volume Message box example for short highlighted messages. Corrector Optics, Shutter and Filter Changer Cryostat Stage Assy

ComCam Responsibilities Telescope & Site Camera Commissioning ComCam Integrating Structure Front End Assy L1-L2 Assy Filter Changer Shutter Alignment Fiducials Cryostat Raft Tower Cryotel Coolers Ion Pump Turbo Pump Roughing Pump Vacuum Quality Monitor L3 & Cryostat Front End Flange Utility Box Filter Control HCU Raft Power OTM Power Utility Box Thermal Control Ion Pump Pwr Turbo Pump Controller Refrigeration HCU HCU (FT) AC → DC Control Network Switch (Fiber→ Eth) Dynalene Coolant Distribution MCM Shutter Control & HCU Filter Control & Refrigeration Pathfinder Test Dewar Heat Exchanger (x2) Thermal Load (x2) L3 & Cryostat Front End Flange Message box example for short highlighted messages. Filter Control

ComCam Responsibilities - Software Telescope & Site Camera AOS w/ ComCam WFS Guiding Camera Control System CCS-Shutter CCS-Filter Changer CCS-Raft CCS-Telemetry CCS-MCM-OCS Message box example for short highlighted messages.

Message box example for short highlighted messages. ComCam Schedule Key Dates/Milestones schedules Ship Shutter to SLAC: 6/14/2017 √ Ship Filter Changer and Controller to SLAC: 2/1/2018 Ship L3 cell to SLAC: 7/1/2018 Preship review from SLAC to Tucson Ship Cryostat, Utility Box, support equipment to Tucson: 2/4/2019 (earlier if possible) CCS and DAQ installed in Tucson (?) All software ready: 2/4/2019 (?) Ship Cryostat to Tucson: 2/5/2019 I&T in Tucson 2/5/2019-4/28/2019 Preship review: ComCam to Chile: 4/29/2019 Ship ComCam to Chile: 5/4/2019 ComCam ready for onsite tests: 7/29/2019 Message box example for short highlighted messages.

I&T in Tucson: Planning Develop integration plan Develop test plan Ensure appropriate knowledge transfer between SLAC & Telescope & Site

I&T in Tucson: Preparation Procure Lab Procure space in computer room Procure required utilities (comms, power, glycol) Test utilities Install DAQ in computer room Develop handling plan Develop power and grounding plan Develop safety plan Review safety, handling, power and ground plans Design handling & test fixtures Acquire/build handling & test fixtures Lab readiness review

Integration & Test Set-up SLAC equipment in lab Receive cryostat Unpack and setup cryostat in lab Post-shipment cryostat testing Integrate Cryostat with L1-L2, L3, Filter Changer, and Shutter Integrate filter changer controller with Utility Box Comprehensive test (scope?) Integrate ComCam and Utility Box with ComCam Integrating Structure (possibly in flex rig room)

Packing and Shipping Determine level of disassembly necessary Develop packing plan Develop shipping plan Procure packaging Disassemble Pack Ship

Message box example for short highlighted messages. ComCam Schedule Camera Project ComCam Schedule T&S Project ComCam Schedule Message box example for short highlighted messages.

Interfaces

Interface and Collaboration Diagram ICDs between components are listed: LSE-67: ICD between TCS and CCS LSE-68: Camera Data Acquisition Interface LSE-69: ICD between CCS and DM LSE-71: ICD between OCS and CCS LSE-72: ICD between OCS and DM LSE-73: ICD between TCS and OCS LSE-75: ICD between TCS and DM LSE-73 LSE-71 LSE-75 LSE-72 LSE-67 LSE-75 LSE-68 LSE-69

Backup Slides

Questions Reviews: What reviews do we need? Should we have a dedicated annual ComCam All Hands Meeting? Who is in charge of writing the comprehensive test plan in Tucson? Who will be in Tucson to perform the ComCam tests?

Ownership <-> CCIS and cable wrap

Utilities

What interface details are needed for the DOE Comcam PDR?

Integration and Test in Tucson

Integration and Test in Tucson

Mounted to the Integrating Structure

Section View

Mounted to the Integrating Structure

ComCam Shutter -Received from Bonn Shutter June 2017 -Semi-custom moving slit type with 236 mm aperture -Minimum exposure < 1ms -Programmable blade trajectory

Detector Raft & FOV Field of View Single raft

ComCam Optical Design