Modeled Load Levels in the Valley

Slides:



Advertisements
Similar presentations
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Advertisements

TPTF Presentation Registration of PUN Facilities December 19, 2007.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to WMS Austin, TX August 10, 2011 Kenneth A. Donohoo, P.E.
NERC LTRA Update / CDR Capacity Counting Issues
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Transmission Planning Process Discussion Joint PLWG / CMWG Meeting Presented by: Luminant Energy June 14, 2011.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
Compliance Monitoring and Enforcement Audit Program Background Information.
Load Data for Vermont Docket 7081 workshop 9/30/05.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
West to North CSC Location Scenario 3b WMS August 20, 2008.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Operations Report Kent Saathoff System Operations ERCOT.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Atcllc.com Using CEMS Data to Estimate Coal-Fired Plant FORs and Scheduled Maintenance Chris Hagman
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
Generation Adequacy Task Force Meeting April 10, 2014.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Sep 16, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to ROS Austin, TX August 11, 2011 Kenneth A. Donohoo, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Reliability and Operations Subcommittee Report on Reliable Fuel Operations in ERCOT Presentation to the ERCOT Technical Advisory Committee February 3,
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Transmission Planning in ERCOT- Overview
Barrilla Junction Area Transmission Improvements Project
PLWG Review 6.9 and the Interconnection process
Southern Cross Directives Planning Items
Risk Assessment and Probabilistic Transmission Planning Methods
Reliability and Operations Subcommittee Report
Solar Eclipse Overview August 2017
DEC System Voltage Planning - June 2018
Mid-Continent Area Power Pool
Cold Snap Task Force Update
Capacity Analysis in the Sixth Plan
Planning Reserve Margin
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Progress on Resource Adequacy Assessment for 2017
Presentation transcript:

4/15/2018 Reliability Planning Review Rio Grande Valley Event Produced by Luminant Energy March 25, 2011

Modeled Load Levels in the Valley 4/15/2018 Modeled Load Levels in the Valley Generation Capacity plus import capacity Planning: 3,181 MW Operations: 2,881 MW Generation Capacity with Largest generator off-line (750 MW ), plus Import Capacity: Planning: 2,431 MW Operations: 2,131 MW Annual load growth runs about 50 MW, however, there is an additional 250 MW load at Loma Alta comes in 2014. Also, graph does not show transmission line losses of ~2%, or ~50 MW. Models show adequate generation and import capacity to serve Valley peak load conditions only when Magic Valley, and other generation is available, along with the planning level of import capability.

Application of Nodal Operating Guide 4/15/2018 Application of Nodal Operating Guide Nodal Operating Guide Section 5.3.2 (actual language): The contingency studies will be performed for reasonable variations of Load level, generation schedules, planned transmission line Maintenance Outages, and anticipated power transfers. At a minimum, this should include projected Loads for the upcoming summer and winter seasons and a five-year planning horizon. The TSPs involved should plan to resolve any unacceptable study results through the provision of Transmission Facilities, the temporary alteration of operating procedures (i.e., RAPs), temporary Special Protection Systems (SPSs), or other means as appropriate. Nodal Operating Guide Section 1.4: Credible Single Contingency (abbreviated language): A single facility. This includes multiple equipment Outaged or interrupted during a single fault (SFME). The Forced Outage of a DCKT in excess of 0.5 miles in length. Any Generation Resource: Combined cycle is a single unit, unless registered as being able to operate combustion turbine and steam turbine seperately. With any single Generation Resource unavailable, and with any other generation preemptively redispatched, the contingency loss of a single Transmission Facility. All normal and contingency conditions outlined in North American Electric Reliability Corporation (NERC) Reliability Standards and any subsequent revisions.

Application of Nodal Operating Guide 4/15/2018 Application of Nodal Operating Guide Questions: What is a “reasonable variation” as it applies to transmission planning studies? How are TO’s applying reasonable variations to transmission planning studies? To what level of prescriptiveness should these reasonable variations be defined to enable affirmative demonstration of NERC/TRE compliance? Prescriptive language (e.g. 1 in 10 yr, or 1 in 20 yr weather) and show completion checkmarks? Leave vague, but describe methods for each project? Other? What variations should be considered? 1 in 10 year peak load levels, 1 in 20 year peak load levels? Historically typical generator de-rates, planned outages, forced outages (State of the Market Report)? Dynamic line ratings correlated to high temperature / high load conditions? How should power transfers be applied? How should operating practices be applied to transmission planning studies, such as the 1400 MW import capacity into the Rio Grande Valley for planning, while operators limit import to 1100 MW? What other planning methods should be considered to meet the “reaonable variations” requirement?

Summer Peak & Temperature correlation Source: March 11, 2011 RPG Meeting presentation on LRGV Import

LRGV Winter Peak & Temperature correlation Source: March 11, 2011 RPG Meeting presentation on LRGV Import

Feb 3, 2011 Load Levels in the Valley 4/15/2018 Feb 3, 2011 Load Levels in the Valley State Estimator Actual 867 MW 49% higher SSWG 11Win1 The February 3, 2011 weather event resulted in a peak load 49% higher than currently modeled in the SSWG 11Win1 Base Case

Next Steps Items to develop recommendations: Load levels : 4/15/2018 Next Steps Items to develop recommendations: Load levels : Weather variability Load growth variability Generation schedules / Power transfersTransmission Derates, Forced Outages, Planned Outages Temperature and Wind driven transfers Transmission: Dynamic ratings associated with weather variability Long-term outages such as autotransformers.