Click here for the LIVE WEBCAM

Slides:



Advertisements
Similar presentations
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Advertisements

CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
Hospital of the Future Construction Update as of Dec. 3, 2010.
WELCOME. Eco Pine Homes-I (Dharampur Project)
CON 4003 Construction Estimating Prof R. V. Locurcio.
Space Reallocation Update October, Summary “Almost” on time “Almost” on time Definitely under budget Definitely under budget Thanks to all for their.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
2 Existing building 1 story metal 1972 Water Street CFA TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes.
CNBC Global Headquarters Lighting Design by: Christine Cajilig Lighting/Electrical Advisor: Dr. Mistrick.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
DGET 1360 Nielson Homes Shady Meadows Design Competition Finished Sq. Ft. Rambler.
Chapter 23 Interior Walls & Partitions. Interior Partitions Performance Criteria  Strength  Fire Resistance  Durability  Acoustical Isolation Materials.
Community Update James Simons School – October 2,
3a. Pursue funding for the program plan to effect a transformation that is almost complete…Information Commons.
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Elevations.
Launch DateJan 09, 2014 LocationCorner of 38 th Street and 6 th Avenue, The Big Apple at Veritown Fort, Global City No. of floors43 flrs (mktg) 42.
Choosing a building system 1. Physical limitations: Size of the land How heavy a building can the soil support How long a structural span is feasible What.
University of Toronto Mississauga Campus Capital Projects University of Toronto Mississauga Campus: Capital Projects Erindale College Council | March 9,
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
1 Levine Hall (Upenn) Photo Analysis. 2 Very nice stairwell.
Chapter 24 Millwork and Cabinet Technology, Cabinet Elevations, and Layout.
Winchester Medical Center Campus Expansion June 21, 2011.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
Wall and Ceiling Construction
Elevations McMillan Villas May 30th 2015.
FLOOR PLANS WHERE IT ALL BEGINS. FLOOR PLANS 1.Column Grids Backbone of all the documents, especially the floor plans Alpha characters horizontal Numeric.
YWCA GSA Classification System for Historic Buildings Level 1 – Primary space and features Level 2 – Secondary space and features Level 3 –
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
North Augusta High School Design Development Presentation.
Bioscience Research Laboratories University of Arizona + DPR Construction Date: 2015 – Construction Work Starting Today for the BSRL Project !! Expansion.
Smrha-Monroe Family Pictures of the House August 2005.
Design Development Drawings 1. Code analysis: examine needed changes 2. Draw accurate existing plans/model 3. Indicate demolition 4. Indicate new wall.
Symbols and Room Finishes
Chicago Public Library Board of Directors Meeting January 13, 2015 Projects in Planning Schedule/Activity Phase 1 – Under construction. Refer to YOUmedia.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
Children’s Section of the Library Entrance lobby from Main Street looking east.
TOBY ZACK DESIGNS LA MER
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Aerial of the full site facing northeast taken on March 1, 2016.
Click here for the LIVE WEBCAM
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Upcoming Activities Fun Fact Click here to view the live WEBCAM
September 30th 2017 Click here for the LIVE WEBCAM
Maidsincali info
Contractor Open House and Diversity Networking Event
INTD 503- Materials Topic: Partition Walls
Carleton College Summer 2018 Science and Campus Construction Plan
WHERE IT ALL BEGINS.
Improvements for 2016 & 2017 Todd Harris Maintenance Manager
New York City Master Plan Update
Minuteman Vocational Technical Regional High School Progress
Project Name – ID # 7/1/2009 Current Project Status Project Issues
KOMPLEX Investors Report – Q
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Landmark Medical Center
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
North Augusta High School – Phase 2A and 2B
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Presentation transcript:

Click here for the LIVE WEBCAM September 22nd 2017 Bioscience Research Laboratories University of Arizona + DPR Construction CURRENT Activities FUN FACT The Center for Gamma-Ray Imaging Group, who will occupy space in the basement of the BSRL building, aims to develop advanced gamma-ray detectors and imaging systems, to push the limits of spatial and temporal resolution in SPECT and PET imaging, and to make state-of-the-art technology available to collaborators and the biomedical research community. Courtyard hardscape, West elevation metal panels, South masonry and loading dock brick wash down are ongoing. Gamma Ray Imaging Suite drywall taping is ongoing and Keating wall framing is near completion. 1st floor Café flooring has started, lobby ceiling trim began and final cleaning underway in OMICS Lab. 2nd floor marker board lights, tack panels and stretched fabric wall panels are ongoing. 3rd floor south labs nearing final cleaning, flooring and mobile casework ongoing at north. 4th floor wood millwork installation is ongoing and final prep for flooring. Click here for the LIVE WEBCAM

Corten Planter Walls at Breezeway 1st Floor OMICS Lab Mobile Benches Bioscience Research Laboratories University of Arizona + DPR Construction Corten Planter Walls at Breezeway 1st Floor OMICS Lab Mobile Benches 7T MRI Areaway West of Building Bathroom Accessories and Fixtures

Conference Room Stretched Fabric Panel Elevator Lobby Tile Level 4 Bioscience Research Laboratories University of Arizona + DPR Construction Conference Room Stretched Fabric Panel Elevator Lobby Tile Level 4 1st Floor Wood Ceiling Border Bathroom Partitions 3rd Level Bathrooms