Brooks Expert Support Tool (BEST) Software

Slides:



Advertisements
Similar presentations
Yokogawa Network Solutions Presents:
Advertisements

Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Enhanced Easy-Stop TM Trailer ABS Training. Enhanced Easy-Stop Trailer ABS System configurations to meet any air-braked trailer application 2S / 1M, 2S.
Engineer Training XL1200 Electronics. Engineer Training XL1200 Electronics Confidential 2 XL1200 Electronics The XL Jet Electronic System consists of.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
AC-SSC-1 Installation and operation manual
Datasheet System Conquest 6_ _01 1/9 CONQUEST 6 Electronic control system for whirlpool Product datasheet VALANTIS SARL CH – 2610 ST-IMIER.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
4Identifying Leakage Source (Mech/ Elec) 4Mechanical Air Leak- Down 4Mechanical Air Leak- Up 4Electronic Drift- Up/ Down 4Load Cell Operation 4Understanding.
GNI0003H PP1 Loop Trainer. GNI0003H PP2 Reason for Study Because the Loop Trainer gives instructors the capability to control water flow, pressure and.
HVACR312 - Refrigeration Metering Devices.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
Laboratory 5: Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report / Presentation Closing.
© 2012 Rinnai America Corporation Rinnai Circ-Logic (RCL)
AccuMax Multi-Point Injection Mechanics
ELECTRONIC FUEL INJECTION COMPONENTS
June 2008 R&D Center / BCS HW Team Introduction to iPECS P5 Hardware.
Engineer Training Electronic System Overview. Engineer Training XL1500 Electronics Confidential 2 XLjet Electronics The XL1500 Electronic System consists.
Baseboard Aavikkomursu 7.2. Aavikkomursu Micro- controller Extension port for programming microcontroller and sensor input Resistor RS485 interface chip.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
BOOT MODE 1 BOOT MODE 2 BIOS COMMUNICATION DEFAULT CONTROLLER INVERT RELAY OPERATION ENABLE COMM FAIL RELAY CONTROL RELAY OFF / ON COMM.
Your Connectivity Partner. Locations Main Office: High Tech Products Lallio, Italy USA Office: HTP Connectivity Parsippany, NJ.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Vacuum system.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Model 2537A Training Course Detailed Instrument Description Rev: Nov
Potable Water System General Locations and Operations.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
CUE – Make Any Pump an E-Pump
Direct Hot Water. What Cold Water System is Pictured? What hot Water System is Pictured?
Automotive Heating and Air Conditioning, Fifth Edition By Tom Birch © 2010 Pearson Higher Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ.
PRESENTATION. Parts of the PCOS (3) Operator LCD Screen with Counter (4) Printer Compartment (5) Transmission Port (9) “RETURN” Button (8) “CAST” Button.
Introduction to LabVIEW
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
9/11/14 Objectives: To disassemble and assemble a desktop computer.
T-6B On-Board Oxygen Generation System (OBOGS)
Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report/Presentation Closing.
1 ALARMLINC. 2 OVERVIEW Expanding Situational AwarenessOVERVIEW.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
Preferred Instruments a division of Preferred Utilities Mfg. Corp. Plant Wide Controller (PWC) Overview.
Introduction to LabVIEW
Apparatus Setup Jason Quill Eric Richardson.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Fujitsu Training Documentation Hardware Installation
How SCADA Systems Work?.
Air Distribution Control
RF Matching Network Description
T-6B On-Board Oxygen Generation System (OBOGS)
Product Training Module
Radiation- and Magnet field- Tolerant Power Supply System
Horizontal Installation Overview
NI Data Acquisition (DAQ) Wiring and Connections
Introduction to LabVIEW
Wiring the Light and Relay
Introduction to LabVIEW
Diagnostics Analytical 920 LC Semi-Prep 940 LC
SNS PPU Cryomodule Instrumentation
CECOM LAR Tropo Operation Course
Introduction to LabVIEW
Introduction to LabVIEW
Introduction to LabVIEW
Door Heat Exchanger: Specification
SNS PPU Cryomodule Instrumentation
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

Brooks Expert Support Tool (BEST) Software for VDM300

Agenda VDM300 Installation Review Brooks Expert Support Tool (BEST) Orientation Mechanical Connections Electrical Connections Switches & LED Indicators Brooks Expert Support Tool (BEST) USB Cable & Driver Connecting to VDM VDM Monitor Screen Datalogging Streaming

VDM300 Mechanical Overview and Installation

VDM300 Top & Bottom View

VDM300 Mechanical Overview 4/19/2018 Vapor Outlet Vapor MFC Water Level Reed Switch Vapor Tank Internal View without cover, PCBA and insulation DI Water Drain & Fill Valves Ensure DI water line is connected and a supply of water is being provided during normal operation Inlet Manifold DI Water/N2 Inlet Minimum/Maximum Pressure 10/40 psig DIW Drain Front Elevation Side Elevation

Zero Button, LED Indicators & ECAT Address Switches

Front Panel Indicator & Switches 4/19/2018 See Section 1-9 of the Installation Manual: Page 1-6 in IOM

Electrical Connections & Communications Ports Diag Port Micro USB Analog 15-pin Dsub Digital ECAT RJ-45 Ports Required connector - ±15 Vdc power to PCBA & MFC heater Electrical power for tank heater only. Must be attached and switched on

Pin Configuration for 15 pin sub D-connector 4/19/2018 See section 2-6 of the IOM for complete details

Installation Highlights Mount and secure the VDM300 using 4 mounting screws Vertical, Flow up Connect vapor outlet to process chamber ensuring the vapor line is heated. Temperature of the line heater should be greater than the MFC block heater, > 100 °C Ensure there are no cold spots It is recommended that an shutoff valve be installed downstream of the VDM

Installation

Installation Highlights Connect DI water line Ensure water pressure is between 10-40 psig A constant supply of water during normal operation Connect 15 pin sub d-connection ±15 Vdc to power the printed circuit board and MFC heater Input/Output signals Control signals Alarms Connect 230 Vac to the power entry module Power for the tank heater

Startup Sequence Ensure vapor outlet is connect and pumped down < 200 mTorr Grounding pin 3 on the 15 pin sub d-connector put the VDM into the startup sequence - See Section 3 of IOM Evaluates the tank Starts filling the tank Turns on MFC heater Turns on tank heater once tank is filled

Brooks Expert Support Tool (BEST) Setting & monitoring alarms Changing mode of operation Data logging Streaming Changing specific attributes Tuning valve response Standard USB connection to device – no special cables or adaptors required

What You Will Need BEST Installation file Type-A Male to Micro B Male USB Cable USB Driver Available at BrooksInstrument.com 32 or 64 bit versions

[See video: BEST-Software-VDM300-Sept2017.mp4] BEST Demo [See video: BEST-Software-VDM300-Sept2017.mp4]

Installation Summary POWER- Ensure they have ±15Vdc and 230 volts AC Pin 3, See section 3 of the IOM for complete details Understand the warm-up conditions. Need water 1st Ensure DI Water Inlet Min-Max pressure Pump out downstream of VDM If tank is not to proper level, tank heater will not turn on Ensure downstream gas lines are heated above Block temperature.

BEST Summary Load BEST after you have loaded Multiflo 5.34 and or other programs.  It will override the Flocom’s of the other programs Switch to External control before exiting BEST Dump attributes before making any adjustments or changes, Ensure you indicate where the DUMP files will save.

Questions?