ADO–PO/TC Meeting Safety Activities

Slides:



Advertisements
Similar presentations
O. Beltramello ATLAS experimental cavern Patrol Procedure LAAWG – October 07 O. Beltramello.
Advertisements

1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Technical Support Activities in PH-ADO-PO
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
PH Department in context Safety Officers in PH Department
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
Section Meeting: TC overview. Outline TCn organization TCn activities – Maintenance and new installations Short term priorities Mid Term priorities Long.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
Territorial Safety Officer (TSO) - Initial The TSO function2.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
Radiation Protection computing tools Gérald Dumont HSE/RP.
1.Definition 2.Examples 3.Hazards 4.Signage 5.Rule and permit 6.The role of the TSO HSE Unit - Olivier Prouteau CONFINED SPACES Updated in January.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Being TSO at CERN Safety at CERN2 Being TSO at CERN – Safety at CERN Safety – what is it ? Safety Policy Safety responsibilities Organisational structure.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
SERIOUS 3D GAME FOR EDUCATION AND TRAINING IN RADIATION PROTECTION Rovinj – 2014 Alain PIN (CEA/INSTN/UECO) – France.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Muon Piquet Training: General Informations March 8-th 2016.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
ATLAS Safety – EYETS 2016/2017 EP-ADO-PO Section Meeting 
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
ADO-PO / TC meeting 1st December 2016
On behalf of the Safety Unit,
ADO-PO / TC meeting NJD/NSW Assembly Raphael Vuillermet.
Being TSO at CERN Safety at CERN Being TSO at CERN Safety at CERN.
Some arrangements for personnel safety 1- Procedures for access
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Safety in the Neutrino Platform Hall
ADO-PO section meeting. ADO : Atlas Detector Operation
TC activities.
SR1 extension follow up Extract and update of “Minutes of the keep-up meeting for SR1” sent on 27/02/ results from the visits and new requirements.
Forecasts for waste and radioactive material storage
Occupational Radiation Protection during High Exposure Operations
Safety in Construction and Upgrade Phases
HSE rules & regulations
ATLAS Safety EP-ADO Meeting EDMS: 11 July 2017.
The TSO function (Territorial Safety Officer)
Technical Support Activities in EP-ADO-PO
East Area Renovation Project team #6 Launch safety agreement
Accelerator and Experiment Interface Session: LS2, LS3
Technical Support Activities in PH-ADO-PO
TYPE IN CENTRE NAME LEVEL 2 FIRE MARSHAL TYPE IN NAME
Helen Boyer OHS group leader
TYPE IN CENTRE NAME LEVEL 2 FIRE MARSHAL TYPE IN NAME
ESHAC 9 Emergency Contingency Plan
Radiation Protection Handbook
Presentation transcript:

ADO–PO/TC Meeting Safety Activities Sigi Wenig – Laetitia Bardo 2 May 2016

Introduction – Laetitia Bardo Health – Safety – Environment Engineer HSE Bachelor at Institute of Technology – University Marseille HSE Engineer & Industrial Risk Prevention – Polytech Grenoble Radioprotection Trainee – Areva – Romans-sur-Isere HSE Trainee – University Hospital Centre - Grenoble ISO 14001/9001 Certification Support Engineer – ESA – Cologne CERN – Project Safety Officer for new Bldg. Project (107) – TE-VSC CERN – CMS Safety Team – PH-CMX Deputy LEXGLIMOS RPE Safety training courses for Slimos, First Aiders Safety drills and emergency preparedness Renew CMS Level 4C course on SIR Incident/accident analysis and follow-up … CERN – ATLAS Safety Team – EP-ADO, since March 2016 ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Sigi Wenig - Laetitia Bardo Outline Safety Team Safety Officers Slimos RPE Technical Support Safety Shifters Patrollers First Aiders Safety – Operation (Run-2, TS, YETS) Access/Activity management Maintenance Safety – Procedures/Documentation Safety – ATLAS Level 4A Course update Safety – Situation at P1 Safety – Evacuation exercise (UX/USA/UX) Safety – Preparation of LS2/LS3 ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

May 2016 ATLAS Safety Team LEXGLIMOS (Large Experiment Group Leader in Matters of Safety) S. Wenig 16-3865 Deputy LEXGLIMOS L. Bardo 16-7415 Radiation Safety Officer (RSO) G. Spigo 16-6675 Electrical Safety Officer (ESO) W. Iwanski 16-0997 Cryogenic Safety Officer (CSO) J. Bremer 16-0553 Flammable Gas Safety Officer (FGSO) G. Sekhiaidze 16-4453 Laser Safety Officer (LSO) C. Santoni 16-5360 Territorial Safety Officer (TSO) UX15 S. Malyukov 16-4960 Deputy TSO M. Raymond 16-3432 TSO USA15 B. Gorini 16-5483 Deputy TSO L. Bardo 16-7415 TSO SDX1 D. Francis 16-0200 Deputy TSO G. Avolio 16-7885 TSO SX1 M. Raymond 16-3432 Deputy TSO D. Bertet 16-2928 Installation Supervisor (IS) US15 S. Wenig 16-3865 Deputy IS L. Bardo 16-7415 Working at Height Trainer D. Bertet 16-2928 Palazzani Nacelle Trainer R. Vuillermet 16-2916 ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Sigi Wenig - Laetitia Bardo ATLAS – Safety Team (2) 17 TSO, DTSO nominations ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Sigi Wenig - Laetitia Bardo ATLAS – Safety Team (3) SLIMOS – Supervisor Laetitia Illona Mariya Natascia (50%) Edward Saha Vitali RPE – Supervisor Giancarlo (RSO) Giancarlo Ariella Sergei SWE Laetitia Carlos Kendall Technical Support Didier (part time) Mito (part time) ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Sigi Wenig - Laetitia Bardo ATLAS – Safety Team (4) Safety Shifters – YETS 2015/16 SLIMOS: Illona, Mariya, Edward, Saha ADO-PO: Alexandre, Augusto, Didier, Julien, Marco, Tomasz, Vit, Wim Patrollers Leaders: Frederik, Julien, Raphael, Michel Laetitia, Alexandre, Armen, Augusto, Cedric, Christian, Didier, Gevorg, Jamie, Joel, Louis, Marco, Philippe, Tomasz, Vit, Wim To be formed: Benedetto On special request: Tatiana, Alain, Giancarlo, Ludo First aiders Solicit to become First Aider ATLAS guides EP-ADO members Sub-system members often in cavern ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Many thanks to all who Accepted a Safety Officer function ATLAS – Safety Team (5) Many thanks to all who Accepted a Safety Officer function Help to fulfill our duties with respect to safety ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Operation (Run-2, TS, YETS) Access management Signed/treated 1607 access requests (since July 2015) Check safety courses up to date Verify/add start and end dates Activity management Signed/treated around 500 IMPACTs No way to check/update PPSPS documents  Please put safety related information IN MORE DETAIL in IMPACT Maintenance Instruments ODH/CO2 Self rescue masks – new ones to be ordered Operational dosimeters RP devices Equipment/Systems Lifelines Sniffer Minimax Radiation gate monitors ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Procedures/Documentation Fiche Reflex – Level-3 Alarms Communication Slimos – FRS ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Procedures/Documentation (2) ATLAS Status Page – Fiche Reflex ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Procedures/Documentation (3) Toroid Area Cleaning ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Procedures/Documentation (4) Patrol ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Procedures/Documentation (5) Short Access during Run ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Procedures/Documentation (6) Information for Safety Shifters Instructions for usage of Operational Dosimeter Reader Update of Manual for ATLAS Guides Update of Document on Cavern opening – Ventilation Much to come … ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – ATLAS Level 4A Course ATLAS Level 4A course needs update Laetitia was/is involved in update of CMS Level 4C course Will profit from this involvement to update ATLAS Level 4A ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Sigi Wenig - Laetitia Bardo Safety – Situation at P1 Installed Operational Dosimeter Reader at PX15 Installed Operational Dosimeter Reader in ACR ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Situation at P1 (2) Improved Gas Point at SGX1 Before After ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Situation at P1 (3) Gas Point behind SR1 – To be improved ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Situation at P1 – Improvements Foreseen Garbage/recycling management Improve lifeline situation Access to cranes On roofs Foam System Maintenance was interrupted Foam lifetime expired (10 years) Doubts that present foam type works with inside air ATLAS joined Foam System upgrade activity initiated by CMS Foam test at specialized site in Spain – With co-organizer Laetitia Follow-up of safety inspections of P1 buildings TSOs please help and take action ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – UX/USA/US Evacuation Exercise Solicited by HSE to perform evacuation exercise of underground areas Beginning of EYETS Need to prepare Formation of emergency guides Discussion with main actors at EYETS start-up Team opening detector … ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Preparation LS2/LS3 Small Wheel (SW) Removal Storage New Small Wheel (nSW) Installation Stepping stone for preparation of LS3 Work preparation Work optimization Main Projects of LS3 ID removal TAS infrastructure nFCAL ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo

Safety – Preparation LS2/3 (2) Estimation of dose to workers for all activities/interventions Create dose maps for various detector configurations Define regions of activities/interventions Estimate time of activities/interventions This will define degree of preparation and specific tools needed Prepare work and train people on mock-up at surface Minimize time of intervention  Radioactive environment & activated material – ALARA Principle Maintain contact to HSE at various stages if projects  New work culture ADO-PO/TC, 2-May-16 Sigi Wenig - Laetitia Bardo