Operations Update 16 August 2012

Slides:



Advertisements
Similar presentations
General Services Division / Special Research & Investigation Section SUBCONTRACTING LAWS and CITY REQUIREMENTS “Okay, so there are rules. But it seems.
Advertisements

Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Risk Sanibel Island Bridges &Toll Plaza Case Study Doug Cox, PE.
Long Range Facility Planning assisted by Silver Falls School District.
February 9, 2012  Partner with the community  Provide an effective educational experience  Prepare every student to find success in our complex society.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
BUDGET MESSAGE 2009 Salem-Keizer Public Schools. Our Values  Minimize the impact on students.  Provide security for our employees by saving jobs as.
November 5, 2015 Amosene W. Sledge Director Special Education Services Special Education Services.
Special Education Update Report Aaron King. Scope & Magnitude of HCS Special Education HCS ADM for FY12 = 22,811 HCS students attending a Title I school,
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Superintendent Goals SY
Capital Facilities Program Update San Rafael City Schools
Cost Estimating Investment Planning and Project Management
Annual Budget (Amended)
EDENTON-CHOWAN SCHOOLS
Application Outsourcing: Achieving Success & Avoiding Risk
Operations Update Report
English for Speakers of Other Languages (ESOL) in Huntsville City Schools October 1, 2015.
Huntsville City Schools Student Performance Trends
“Ensure the financial integrity of HCS” Huntsville City Schools
WILMINGTON PUBLIC SCHOOLS
Operations Directorate Update
Majority – to – Minority Transfer Application Process
Student Welfare & Social Services
Doing Business with Santa Clara Valley Transportation Authority (VTA)
Pre-K Program Update September 5, 2013.
Behavioral Learning Guide Update
Budget and finance Ryan Kahlden June 12, 2017.
Huntsville City Schools Transfer Student Supervision Plan
Network Update Laquita Nelson July 10, 2012.
Huntsville City Schools iNOW Parent Portal Update
Huntsville City Schools Student Badging Initiative
School Office Assessment Results
Targeted District Review Report
Blackhawk School District
Operations Update 15 November 2012
Enterprise Content Management Owners Representative Contract Approval
Operations Update Dr. Jeffrey S. Wilson Operations Director
HAZLET TOWNSHIP PUBLIC SCHOOLS
Enron Energy Services Energy Management Outsourcing Overview
How does the Branding fit into ECC Excels???
HCS Curriculum Update January 9, 2018.
Director of Operations
Positive Behavioral Interventions and Supports (PBIS)
Huntsville City Schools 2014 Summer Feeding Program
Budget Public Engagement: Wednesday,
Huntsville City Schools
Fall 2015 Playground Update
Technology Update September 4, 2012.
Student Welfare & Social Services
Operations Directorate Update
Westmoreland Intermediate Unit
Student Growth Data by Classroom Teacher and School
Delta Water Supply Project
School Safety Task Force
Strategic Planning Process
Huntsville City Schools Copier Refresh
Summer Feeding Program
Digital Sign Strategy and Status
Superintendent Evaluation
Community Eligibility Provision
EDENTON-CHOWAN SCHOOLS
Growing in Faith, Building Together
College Admissions and Scholarships
FY19-28 Capital Improvement Program Request
Citizens’ Bond Oversight Committee September 21, 2016
Network Update July 26, 2012.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
HCS Child Nutrition Program Update Child Nutrition Program Director
Third Grade Cursive Handwriting Chief Academic Officer
Presentation transcript:

Operations Update 16 August 2012 Dr. Jeffrey S. Wilson Director of Operations Huntsville City Schools

Agenda District-wide inventory Consultant value added Hoar overview TCU overview Capital plan overview

District-wide Inventory Problem: How to obtain a full accounting of non-expendable property across the district during the school year with minimal disruption to our mission? Discussion: Hire a firm that specializes in asset management to design and implement a process that includes bar coding, RFID tagging, and the generation of a data base that is fully compatible with management software already purchased. Conducted a pilot inventory of HHS: successful. Recommendation: Approve the hiring of T and W Operations to conduct a district-wide inventory from August 2012 to August 2013.

Consultant value added Project procurement - bidding, prequalifying (the value of “qualified contractors” as an intangible…that includes quality, experience, financial risk, and performance). Option of utilizing a multi-prime format (multiple prime contractors vs. a single prime contractor) to reduce the single prime’s mark up on subcontracting work. Staff savings for using “as needed” consultants vs. full time employees and the ability to end contractual obligations once the work is complete. Value engineering or ways to reduce the cost of a building and still meet the design intent and programming use of the building. Savings during preconstruction to establish budgets and avoid cost in time and money for rebidding of projects, reviewing documents, and defining complete scopes to reduce the possibility of design and scope gap construction change orders. Savings during construction from schedule push and drive for quicker use of a new facility to produce income.

HOAR Hoar Program Management (HPM) was created in 1998 as a way to offer almost 70 years of comprehensive construction related experience to clients who either lack or don’t have enough professional design and construction management staff. Initial projects were small and primarily focused in the State of Alabama. Over time they have become larger, more diverse, and more complex allowing HPM to develop a broader reputation and expand into national arenas. In addition to our Birmingham office, HPM now has offices in Huntsville and Mobile, Alabama; and Houston, Texas. 

HOAR Chad Wilson, Andy Bernard

Hoar Overview What we have done for HCS: Blossomwood ES (2012) Lee/New Century campus (2012) Chapman renovation (2012) Move management services (Lee HS/NCTHS and Blossomwood) What we are doing now: Lee campus athletics (completed phases 1-2 of 4) (2012-2013) Montview roof/HVAC (2012) Lee HS/NCTHS collaborative learning center (2012-2013) Special Ed Playgrounds (Challenger, AAA, Blossomwood) (2012) Capital planning: Initiating programming for J.O. Johnson (new school) Programming HHS 9th grade academy/center for technology

HOAR (Blossomwood)

HOAR (Lee/New Century Campus)

TCU TCU Consulting Services was started in 2005 by Percy Thomas and Ken Upchurch to provide Owner Representation/Program Management Services and resources to manage the various elements of a capital construction program for its clients. Built on a career spent working together for over 30 years as contractors and as friends, this unique business, a 50/50 partnership between Thomas, a black man and Upchurch, a white man, was formed to serve its clients in the ever changing and complex world of construction project delivery, especially in the public sector.  As one of Huntsville City School’s Owner Representative/Program Managers, TCU will provide pragmatic advice on all phases of design and construction – from programming, budgeting, scheduling, design, bid, award, construction and move-in. Our services are best described as providing the Owner with the experience and expertise that it currently does not have on staff. We serve as an extension of the HCS staff for the capital construction program.

TCU Founders Ken Upchurch, Percy Thomas

TCU Overview What we have done for HCS: Milton Frank Stadium renovations (Phase 1 Aug 2012) Grissom HS I-pod construction (Oct 2012) MLK new school (programmed and in design, delivery 2014) Rolling Hills ES Phase 1 (Aug 2012) 14 summer projects throughout HCS What we are doing now: Rolling Hills Phase 2 (2012-2013) Monte Sano renovations (windows, HVAC) (2012-2013) Whitesburg P-8 programming (August 2015 opening) Capital planning: Milton Frank Stadium Phase 2 (2012-2014) Grissom HS (new school, phased to allow building on current site), projected delivery Aug 2016)

TCU (Milton Frank Stadium)

TCU (MLK Elementary)

Capital Plan Total Dollar figure: $176,400,000 Time span: 2013-2018 (5 years) Prioritization rubric: Jacobs report data Feeder pattern data Previous HCS 5-year plan Projected maintenance expenditures (Brown) Assessment of political and social factors in community

Priorities Priority 1: Capital Plan Projects (2013-2018) Whitesburg P-8 (23.5m) J.O. Johnson (31m) Grissom (58m) MLK (13m) Milton Frank Stadium (6m) HHS 9th Grade Academy (17.5m) University Place (2015) (17.4m) Priority 1 bottom line:

Priority 1 Priority 1 bottom line: Refurbishes 898,000 sq.ft. of old buildings. 23% of the total sq. ft. of HCS system inventory. Serves 5840 students will be in new buildings at the end of 2018.(25% OF HCS enrollment) Further represents a reduction in 462,000 sq. ft., thereby right-sizing the district.

Priorities Priority 2: Capital Plan projects subject to additional funding streams Butler HS (new school, 7-12, incorporates Westlawn MS) (43.3m) Ed White MS (new school, incorporates Highlands ES, becomes P-8) (23.5m) Chapman (new school, becomes P-8, Chapman ES/MS distinction disappears) (17.5m) Apply other funds to improve existing ES’s TTL: 84.3m

10 year Looking at 135m of additional needs, the satisfaction of which is contingent upon the arrival of subsequent funding streams that have been identified.

Questions, Comments