PROJECT COST MODEL 2 – NEW DRIGGS AND VICTOR K-3 SCHOOLS AND RENOVATE EXISTING FACILITIES 1Construction costs based on most recent national and regional.

Slides:



Advertisements
Similar presentations
Madison Elementary School District. Tonight's Topics 1- Energy Usage and Savings 2- Solar Update 3- Recent Projects 4- Spring and Summer Projects.
Advertisements

1 LAX Tom Bradley International Terminal Reconfiguration Project Environmental Impact Report Public Scoping Meeting Flight Path Learning Center January.
Summary of $475 million Bond Issue and Capital Financing Options Practiced By the State System of Higher Education in Oklahoma Practiced By the State System.
Charter School Petition Training: Facilities Cobb County School District.
History of the Greensboro Center 1927-Present. About the Greensboro Center Located at 412 Greensboro Street in the heart of the Greensboro Historic District,
Photo Tours Residence Halls (selected)
October 29, 2013 UNC’s R&R Formula Repairs and Renovations.
Soil Classes default Only one soil type “D” modified District Key EARTHQUAKE LOSS ESTIMATION FOR THE NEW YORK CITY AREA Princeton NYCEM Research Group.
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
02/08/2015Regional Writing Centre2 02/08/2015Regional Writing Centre3.
Wilkes Elementary School – Comparable Schools from Neighboring School Districts Opened: 2012 Gross Square Feet: 70,509 Construction Bid: $21,359,000 Construction.
Department of Facilities Management Maintenance & Operations.
10/9/2003Tuition Policy Advisory Committee1 Tuition Policy Advisory Committee Public Forum.
Ortmann Healthcare Consultants Proforma Scenarios Profitability Equals Success! Success Determined Through Careful Planning Click on Slide to Advance.
Facilities Advisory Committee Preliminary Feasibility and Cost Study April 2012.
CORPORATE SERVICES Empowering Students For A Lifetime Of Success.
Energy Conservation Program Board Update Capital Region BOCES Consortium Galway Board Presentation Tom Schweizer -Energy Education Specialists BOCES Adam.
1 Educational and Facilities Master Plan Update Dr. Richard McCullough President Saddleback College Dr. Glenn Roquemore President Irvine Valley College.
Facility Construction Project Workplan 2012 A Presentation to the Board of Education Prepared by Facilities and Planning May 15, 2012.
Home Buyer and Seller Generational Trends National Association of REALTORS ®
9a. Percent of construction establishments involved in green technologies and practices, 2011.
World-Class Education. World-Class City. Click to Add Title How Institutional Factors are Related to Greenhouse Gas Emissions Cynthia Klein-Banai, Ph.D.
1 Smart Schools Bond Act Completing the Smart Schools Investment Plan
Colstrip Public Schools: Phase II – High School Renovations in order to Absorb Middle School.
Objective Calculate the amount of materials needed for a construction project.
1 Limestone County School District Energy Update Year Eleven Report September 2008 – August 2009.
Tree alleys, nature monuments, parks, forests in our region Eveli Demidas, Elisabeth Sildam.
Correlation and Regression. Section 9.1  Correlation is a relationship between 2 variables.  Data is often represented by ordered pairs (x, y) and.
SPRING INDEPENDENT SCHOOL DISTRICT a winning team.
1 Item Th25c Applicant SeaWorld San Diego Project Description Renovate existing guest entrance area to an existing theme park to include construction.
Regional Policy Common Indicators: Social Infrastructure, URBAN & ETC Definitions and Discussion Brussels, 22 nd November
10/9/2003Tuition Policy Advisory Committee1 Appendix.
Calculating the Economic Impact of Your Housing Project Rachel Bates Governor’s Housing Conference November 19th, 2015.
The Dos and Don’ts of Moving Collections.  The Numbers Game: Space needs analysis  Do we need to weed?  What does the future hold? What will this.
Elementary/Middle School Boundary Presentation.
Strategic Planning and High Performance Design to Reduce Energy and Environmental Impacts at Brown University EPA Brownfields 2006 Kurt Teichert Resource.
San Francisco Fire Department Facilities Update.
Presented to The Raymore Peculiar Schools Board of Education Van McLain Energy Educator/Manager February 26 th, 2007Energy Management Conservation Program.
Zero Net Energy (ZNE) Facilities Design Presentation to California State Lottery Commission November 20, 2014 Director’s Report 7c.
CR1 & CR2 07/08/08 OSFC SMPA Webinar.
Budget Preparation Calendar
Consolidated Central Office Building
Splash Screen.
Project: Facility Name Location: City, State Entry #: Enter Here
Power Plants.
A Forest of Sensors: Tracking
Silver Lake Regional High School
WHAT ARE THE DIFFERENT APPRAISING APPROACHES USED TO CALCULATE COMMERCIAL REAL ESTATE VALUE.
Facilities Management Department
Notes Over 10.3 Multiply binomials by using F O I L.
David Salazar, Chief Facilities Executive
A culture's values are its ideas about what is good, right, fair, and just.
Project: Facility Name Location: City, State Entry #: Enter Here
E D F C G A H B Building Dimensions Square Footage Access Structure
Chino Valley Unified School District
Mao’s China Intentions Outcome.
Puri Amanvilas Independent Plots, Luxuria-Lavender Floors Website :
Puri Amanvilas Independent Plots, Luxuria-Lavender Floors Website :
Lockeford Elementary School Kindergarten Construction
Linear Algebra Lecture 10.
Dan Packer CM Option Introduction Existing Buildings and Systems
Theory The effectiveness of information system rests on the ability to help users better understand the currently accepted conventions and meanings.
The Goal of the Carrollton-Farmers Branch ISD is high achievement for each student Capital Bond Report.

Sandy Grove Middle School
Truckee Meadows Fire Protection District
Factoring Questions that Appear Difficult, but are Actually Slightly Easier If one factor of x2 + 3x – 18 is x + 6, what is the other factor?
Subtracting polynomials
Facility Improvement Program Report
The Fallstead The Fallstead is a shining example of how partnering with nonprofit developers in the revitalization of outmoded county facilities results.
Presentation transcript:

PROJECT COST MODEL 2 – NEW DRIGGS AND VICTOR K-3 SCHOOLS AND RENOVATE EXISTING FACILITIES 1Construction costs based on most recent national and regional information available. 2Square footages for renovations and modernizations based on actual existing buildings. 3Square footages for additions and new construction based on most recent national and regional information available. 4Square footages and costs independently verified by construction manager currently working in neighboring school districts.

PROJECT COST MODEL 5 – NEW DRIGGS AND VICTOR K-5 SCHOOLS AND RENOVATE EXISTING FACILITIES 1Construction costs based on most recent national and regional information available. 2Square footages for renovations and modernizations based on actual existing buildings. 3Square footages for additions and new construction based on most recent national and regional information available. 4Square footages and costs independently verified by construction manager currently working in neighboring school districts.