SUSTAINABLE RENOVATION OF SCHOOL BUILDINGS IN CZECH CONDITIONS

Slides:



Advertisements
Similar presentations
1 2 Energy education Energy education: learning to be sustainable 2.
Advertisements

Belgian Building Research Institute – Performance Indicators for Health, Comfort and Safety of the Indoor Environment Some first conclusions.
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
POINT CZ, s.r.o. Expansion of production capacities of POINT CZ for offset printing Speakers: Barbora Hrdinova, Lubor Valek Consulting Agency.
Sofia Workshop 8 June 2007 Modelling the impact of policy and measures with MURE: The Czech Republic Case study.
International Energy Agency Energy Conservation in Buildings and Community Systems Programme - ECBCS IEA Energy Conservation in Buildings & Community Systems.
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
NEED ASSESMENT WITHIN CEMAC Joseph KENFACK. CENTRAL AFRICAN COUNTRIES.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Iterative development and The Unified process
California Solar Initiative Public Forum Hosted by CCSE October 15, 2008.
 For the implementation of the EPBD and the targets optimal design strategy is needed for energy efficient buildings by applying an integrated.
CAPABILITY OF INCREASING ENERGY EFFICIENCY IN EU HOUSING Nataliya Anisimova Czech Technical University in Prague
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
Do not put content in the brand signature area BCCH presentation ING Financial Education program Hungary 2012 Renáta Pásztor Dániel Lackó June 5, 2012.
ReStEP – Project overview Project info: Full project title: ReStEP – Regional Sustainable Energy Policy based on the Interactive Map of Sources Duration:
- FEDARENE - European Federation of Agencies and Regions for Energy and the Environment.
Audit of Public Procurement
Fredrik Indebetou Report on Session B3 - A brief summary.
«Energy Saving Policies in Greece» Dr. Litos Charalampos, Technical Chamber of Greece, Prof. Ioannis Vourdoumpas Chania
ENERGY EFFICIENCY CENTRE GEORGIA  Support to renewable energy and energy efficiency utilization for sustainable development and as a result improve national.
Ministry for Regional Development of the Czech Republic MEETING OF DIRECTORS GENERAL “Territorial Cohesion” The Implementation of Action 1.1a (Urban –
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
ProCure Putting Information & Communication Technologies to Work for the Construction Industry Taylor Woodrow Fortum Engineering DaimlerChrysler Corus.
Frankfurt (Germany), 6-9 June 2011 Steven Inglis – United Kingdom – RIF Session 5 – Paper 0434 Multi-Objective Network Planning tool for the optimal integration.
EMV Results for online Energy Education Study conducted by Lei Wang, PhD October 2011.
Sustainable Energy Plan June 22, 2002 Sustainable Development Council John Auguste (Ministry of Works, Communications, and Public Utilities)
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
Energy Project M&V: Reports that Add Value October 27, 2015.
Mafalu Lotolua PEAG Meeting, SPC, Suva, Fiji 16 th - 18 th November 2015 Tuvalu’s Progress on it’s Energy Master Plan Target
Acceptance of Social Media Marketing in the Sanitary Market Marcus Diedrich 6. November 2015.
Using ICTs To Support Pre- university Education : Performance based Indicators Mohammed A. Ragheb’ PhD Strategic Planning Consultant MOE-Egypt.
6/10/20161 The point of view of the Central European Cluster represented by FFDI Workshop 2, SMEs-NET Project (Contract N° FOOD-CT ) Miroslav.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
Renewable energy support schemes in the Republic of Moldova
Chapter 4 Assessment.
DEVELOPMENT Assessment Planning Design Reading Blueprints Funding
AN OPTIMIZATION OF BUILDING DESIGN USING
The point of view of the Central European Cluster represented by FFDI
Fort Stanwix National Monument Energy Audit Contract
The research on usage parameters of wooden buildings
REFURBISHMENT DYNAMICS FOR SUBSIDY PROGRAMME FINANCING
Quality Systems and Calibration
New EGNRET Concept Notes
THE INCIDENCE OF FLIPPED LEARNING IN THE DEVELOPMENT OF THE WRITING SKILL OF SENIOR ENGLISH LEARNING GROUPS AT JOHANNES KEPLER HIGH SCHOOL, YEAR.
BIM EXECUTION PLANNING PROCESS
Training programs in IngREes project
Webinar – CITyFiED Methodology, December 9, 2015
Enhance customer service access options;
Audit Guideline on Delivering the 2030 Agenda through Environmental Audit WGEA’s Work Plan Goal 1 - Developing guidance materials available.
Cypriot PV Industry Experience
Scope of BIM implementation in the investment phase of a construction project: system of assessment Marie FRANKOVÁ CTU in Prague, Faculty of Civil Engineering,
STATE ENERGY AND WATER REGULATORY COMMISSION
Background SLC is one of three elements of the BER
PV System Quality and Performance
Photovoltaic Systems Engineering Session 26
ChE 473K Plant Design R. Bruce Eldridge.
BEEP Integrated Design Process for Energy Efficient Buildings
Renewable Energy In Egypt
BIM EXECUTION PLANNING PROCESS
Critical Review of the Malawi Community Energy Model
Kevin J Bradley Welsh Infrastructure Conference Structuring a Successful Education Project Structuring a Successful Education Project Kevin Bradley Wednesday.
ANALYSIS AND DESIGN Case Study Work Session 2 From Concept to Reality
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Building Organizational Capacity: An evaluation of
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Photovoltaic Systems Engineering Session 22
« Survey on PRODCOM data collection in other MS
Presentation transcript:

SUSTAINABLE RENOVATION OF SCHOOL BUILDINGS IN CZECH CONDITIONS CASE STUDY IN BUSTEHRAD Stepan MANCIK , Jan RUZICKA, Tomas VACHA, Martina BACUROVA CTU in Prague, University Centre for Energy Efficient Buildings (UCEEB), Bustehrad, Czech Republic, stepan.mancik@cvut.cz

CONTENT Elementary school in Buštěhrad – case study SBToolCZ for educational buildings

Elementary school in Buštěhrad – case study UCEEB

Elementary school in Buštěhrad – case study Design of four new classrooms including supporting facilities form teachers and extension of a capacity of dining-hall and kitchen; Creation of a multipurpose space for meetings with parents and friends of school, presentations, school displays etc.; Emphasis is put on increasing the quality of internal environment – external shading in summer time, system of mechanical ventilation etc.; Effective energy and sources management and utilization of renewable energy resources that might have strong educational potential.

Elementary school in Buštěhrad – case study Concept, methodology Data preparation Participation in pre-design phase Energy concept Design competition Competition evaluation Tender for project Building permit project Tender for contractor Construction Final building approval

Elementary school in Buštěhrad – case study

Elementary school in Buštěhrad – case study

Elementary school in Buštěhrad – case study

Elementary school in Buštěhrad – case study project setup and participatory stage, preparation of architectural competition

Elementary school in Buštěhrad – case study Questionnaires for parents and pupils Online survey Pen and paper form project setup and participatory stage, preparation of architectural competition

Elementary school in Buštěhrad – case study PROJECT

Elementary school in Buštěhrad – case study ENERGY CONCEPT (PV) Total yearly electric energy consumption model (profile used for design of energy system). Energy consumption during summer holiday is minimal which means for example that produced energy from PV system in these months is hard to be consumed. Installed output of PV system [kWp] Yearly production of energy of PV system [kWh] Yearly usage of energy from PV system in the building Coverage of yearly consumption [%] Yearly delivered energy into the distribution network (not used for own consumption) Yearly take-off from the distribution network [kWh] Investment costs of PV system [CZK]* 1 986 937 66 953 80 000,- CZK 2 1 972 1 873 3 66 016 125 000,- CZK 10 9 861 8 180 12 1 189 59 710 440 000,- CZK 30 29 585 19 166 28 8 940 48 724 1 260 000,- CZK Simulation of PV system performances - results and estimated investment costs

Elementary school in Buštěhrad – case study March 17th, 2016

Elementary school in Buštěhrad – case study June 23rd, 2016

SBToolCZ for educational buildings

SBToolCZ for educational buildings S.01 Compliance with specificities of educational buildings Brand new criterion Assessment in terms of needs of: Teachers Pupils, students Employees Parents and interaction of the school and family Public and interested hobby groups using the school facilities

SBToolCZ for educational buildings S.01 Compliance with specificities of educational buildings Interaction between school and family Multipurpose use of the building Educational potential in terms of sustainability C.02 Project management Project preparation guidelines Participatory stage Architectural design Design and realization process management

SBToolCZ for educational buildings

CONLUSION School refurbishments overreach with their social aspect the scope of building engineering and architecture Investigation of users‘ needs is essential Participation and involvement of all stakeholders are important for successful completion Subsidy system setup can negatively influence the whole refurbishment process SBToolCZ serves as a quality assessment tool for school buildings and a guidline for thier renovations

CONCLUSION Thank you stepan.mancik@cvut.cz