Chapter 6 The Supporting Facility

Slides:



Advertisements
Similar presentations
Physical Evidence and the Servicescape (Chapter 11)
Advertisements

Service Environment, Physical Evidence and the Servicescape
Chapter 10: Crafting the Service Environment.
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
8–1. 8–2 Chapter Eight Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
4 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Process Analysis 4.
MIS 325 PSCJ. 2  Business processes can be quite complex  Process model: any abstract representation of a process  Process-modeling tools provide a.
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Facility Design and Layout
PHYSICAL EVIDENCE AND THE SERVICESCAPE Chapter 10
Chapter 4 Process design Shenval. Alamy.
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management, Forecasting.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Chapter – 8 The Supporting Facility
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin The Supporting Facility.
Supporting Facility and Process Flows
Servicescapes in Facility Management
The Supporting Facility
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
Operations Management Layout Strategy
Physical Evidence and the Servicescape
Chapter 11: Physical Evidence and the Servicescape
Layout Strategy.
Service Facilities and Process Flows MD854 Management of Service Operations Professor Joy Field.
Chapter 9 Supporting Facility: Creating the Right Environment
Supporting Facility and Process Flows Chapter 7
DOM 102 : Principles of Operations management
Operations Management Module 4 : Process Analysis S.Balachandran 2007 December 2007.
SERVICESCAPE SERVICESCAPE & PHYSICAL EVIDENCE Ms.Megha Mody.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
MKT 346: Marketing of Services Dr. Houston Chapter 10: Creating the Service Environment.
The Supporting Facility Creating the Right Environment.
OPSM 405 Service Operations Management
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Chapter 09 The Supporting Facility
Goal  designed so employees can do their job efficiently  designed so customers can enjoy their dining experience without distraction 1. Balance.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
CH. 17 Class Discussion MANAGING OPERATIONS AND STAFFING.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Supporting Facility and Process Flows
Operations Management
Closure. Course Outline For Systematic Layout Planning: Chpt 10 from your textbook and today’s lecture For Warehousing: Prof. Bartholdi’s electronic.
The Supporting Facility Creating the Right Environment.
Physical Evidence. What Are the Options for Delivering Our Service? What physical and electronic channels can we use? Should we offer customers a choice?
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management, Forecasting.
Circulation, Control, Safety, and Security 12 chapter.
Key Learnings: Little’s Law
Physical Evidence and the Servicescape
Facility Layout McGraw-Hill/Irwin.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Service Quality 6 McGraw-Hill/Irwin
Facility Layout Chapter 6A.
© 2000 The McGraw-Hill Companies
Customer Service Strategies
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Chapter 6A Facility Layout 2.
PHYSICAL EVIDENCE AND THE SERVICESCAPE
AB AC AD AE AF 5 ways If you used AB, then, there would be 4 remaining ODD vertices (C, D, E and F) CD CE CF 3 ways If you used CD, then, there.
9 Layout Decisions PowerPoint presentation to accompany
Team Leader name: Date:
WORLD GEOGRAPHY Unit 1 5 Themes of Geography Notes
Presentation transcript:

Chapter 6 The Supporting Facility Creating the Right Environment

Learning Objectives Describe the critical facility design features. Identify the bottleneck operation in a product layout and rebalance for increased capacity. Use operations sequence analysis to minimize flow-distance in a process layout. Prepare a process flowchart. Recommend facility design features to remove anxiety of disorientation. Conduct a walk-through-audit (WtA).

Facility Design Considerations Nature and Objectives of Service Organization Land Availability and Space Requirements Flexibility Aesthetic Factors The Community and Environment

Product Layout Line-balancing Problem Automobile Driver’s License Office Review Payment Violations Eye Test Photograph Issue In Out 1 240 15 2 120 30 3 60 4 90 40 5 180 20 6 120 30 Activity numbers Flow rate per hour Time in seconds

Automobile Driver’s License Office (Improved Layout) 1,4 65 55 3 60 In Out 2 120 30 5 180 20 6 120 30 1,4 65 55 3 60 In

Process Layout Relative Location Problem Ocean World Theme Park Daily Flows A B C D E F A B C D E F A 7 20 5 6 15 30 15 6 B 8 6 10 2 12 40 10 8 Net flow C 10 6 15 7 8 20 8 8 D 30 5 10 3 30 6 E 10 10 1 20 6 10 F 6 3 4 Flow matrix Triangularized matrix Description of attractions: A=killer whale, B=sea lions, C=dolphins, D=water skiing, E=aquarium, F=water rides.

Ocean World Theme Park (Proposed Layout) (a) Initial layout (b) Move C close to A Pair Flow distances Pair Flow distances AC 30 * 2 = 60 CD 20 * 2 =40 AF 6 * 2 = 12 CF 8 * 2 =16 DC 20 * 2 = 40 DF 6 * 2 = 12 DF 6 * 2 = 12 AF 6 * 2 = 12 Total 124 CE 8 * 2 = 16 Total 96 (c ) Exchange A and C (d) Exchange B and E and move F AE 15 * 2 = 30 AB 15 * 2 =30 CF 8 * 2 = 16 AD 0 * 2 = 0 AF 6 * 2 = 12 FB 8 * 2 = 16 AD 0 * 2 = 0 FD 6 * 2 = 12 DF 6 * 2 = 12 Total 58 Total 70 C A B C A B D E F D E F A A F C B C E D E F D B

Process Flow Charting Symbols Category Symbol Description Operation An operation performed by the server off-line or customers self-service. A possible service failure point. Customer An occasion when server and customer interact. An contact opportunity to influence customer service perceptions. Travel The movement of customers, servers, or information between operations. Delay D Delay resulting in a queue and a need for waiting space for customers. Inspection An activity by customer or server to measure service quality.

Credit Card Processing (Before) Distance Time Activity Customer requests check 30 ft. 0.5 min. D Server walks 0.5 min. D Server prepares check 30 ft. 0.5 min. D Server walks 0.25 min. D Server presents check 30 ft. 0.5 min. D Server walks 0.5 min. D Customer inspects, puts card out 30 ft. 0.5 min. D Server returns to table 0.25 min D Server picks up card 30 ft. 0.5 min. D Server walks to process 0.5 min D Server fills out slip 0.5 min. D Server processes slip 1.0 min. D Server obtains preauthorization 30 ft. 0.5 min. D Server walks 0.25 min. D Server presents slip 30 ft. 0.5 min. D Server walks 0.5 min. D Customer signs (leaves) 0.25 min. D Server picks up slip 30 ft. 0.5 min. D (Customer leaves) Server walks Total time: Server:9 min. (270 ft.) Customer: 7.75 min.

Credit Card Processing (After) Distance Time Activity Customer requests check 30 ft. 0.5 min. D Server walks 0.5 min. D Server prepares check 0.5 min. D Server fills out slip 30 ft. 0.5 min. D Server walks 0.25 min. D Server presents check and slip 30 ft. 0.5 min. D Server returns to table 0.5 min D Customer inspects, puts card out, signs slip 0.25 min D Server picks up card and slip 30 ft. 0.5 min. D Server walks 0.5 min. D Server processes slip an card 1.0 min. D Server obtains authorization 30 ft. 0.5 min. D Server walks 0.25 min. D Server presents card and receipt D Customer leaves Total time: Server: 7.5 min. (210 ft.) Customer: 6.75 min.

Servicescapes Designing Physical Surroundings to Affect Employee and Customer Behavior Ambient Conditions: background characteristics such as noise level, music, lighting, temperature, and scent. Spatial Layout and Functionality: reception area, circulation paths of employees and customers, and focal points. Signs, Symbols, and Artifacts: selection, orientation, location, and size of objects.

Environmental Orientation Considerations Need for spatial cues to orient visitors Formula facilities draw on previous experience Entrance atrium allows visitors to gain a quick orientation and observe others for behavioral cues Orientation aids and signage such as “You Are Here” maps reduce anxiety

Walk-Through-Audit Service delivery system should conform to customer expectations. Customer impression of service influenced by use of all senses. Service managers lose sensitivity due to familiarity. Need detailed service audit from a customer’s perspective.