ALCW2015 SRF working Group Hayano.

Slides:



Advertisements
Similar presentations
Support Services Department- Leadership Teams Involving Everyone in the Plan on a Page!
Advertisements

ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Shuichi Noguchi, KEK6-th ILC School, November Beam-Operation Cavity Voltage Control by Feedback & Tuner Dumping of HOM’ s by HOM Dumper  Bunch Induced.
Announcement of Green-ILC WG formation H. Hayano, T. Saeki, KEK D. Perret-gallix, IN2P3/CNRS
4/19(Sun)4/20(Mon)4/21(Tue)4/22(Wed)4/23(Thu)4/24(Fri)4/25(Sat) Morning Registration Acc/Phys/R&D Acc/Concept Reserved Opening Acc/Phys/R&D
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
ILC, FCC and the landscape of future colliders 121 April 2015Interactions meeting Toyama.
Control configulation for S1G module operation H. Hayano version 1.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
ALCW st IOC November 21, 2015: 23:00-24:00 (JST) Agenda 1.Report on preparation done for ALCW2015 up to now by KEK and LOC 2.Discussion and decision.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
ILC Accelerator Status Lyn Evans, CERN, Imperial College London 1A. Yamamoto, LCB ILC Acc. Status.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
E.Kako (KEK) 2009.Dec. 26 1 S1-Global Cryomodule Overview No connection No beam tube No gate-valve Closed by Blind Flange Gate-valve Pumping system Pumping.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
The Third IHEP-KEK 1.3GHz SRF Technology Collaboration Meeting J.Gao IHEP Dec. 7-8, 2010.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
SCRF: Monthly WebEx Meeting Oct., 19, 2011
SCRF WebEx Monthly Meeting Agenda and Reports from PM
S1G Experiment Schedule Plan
ILC10 Beijing Global Design Effort
SRF summary accelerator WG
ILC-SCRF Test Facilities considerations
Mike PAC Charge & Agenda ALCW15 Plenaries CERN SPC – September 2014
Chris Adolphsen Sergei Nagaitsev
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
BAW Prep S1 Global Status Pilot Plant Status
XFEL cavities and cryomodules measurements at AMTF
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
ML-SCRF: Monthly WebEx Meeting Dec., 19, 2012
WG3: Main Linac SCRF(cavity,cryomodule)
IHEP Cryomodule Status
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Update on Dark current generation in ILC Main Linac
FRIB summary of performance degradation - VTA to cryomodule
LERF Cryomodule Testing Facility – Accelerator Systems Deliverable
Introduction WG2 Martina Martinello, Oliver Kugeler TTC Meeting 2019.
Presentation transcript:

ALCW2015 SRF working Group Hayano

ALCW2015 20 April 2015 – 24 April 2015 KEK, Tsukuba 22 March :Early Registaration end

Accelerator Session KEK Tokyo KEK

Development update (cavity, tuner, coupler, mag.shield, SRF Working Group Development update (cavity, tuner, coupler, mag.shield, cryomodule, HLRF, LLRF, etc) SRF Facility/SRF Accelerator update (LCLS-II, KEK-SRF, EP, Clean-room, etc) Green-ILC technologies(high efficient, low loss, Energy managemnt, etc) * Fuze connection available

08:00 - 10:00 22-April Bus to Tokyo 10:30 – 12:15 Report on LCC, ILC-acc LCC-physics, etc (Tokyo Univ.) 12:30 – 14:00 Lunch 14:00 – 17:30 Special Symposium Public event (Tokyo Univ.) 18:30 – 20:30 Food Festa (Hotel New Otani) 21:00 – 22:30 Bus to KEK