Works Contract Commencement Date: 20th May 2005

Slides:



Advertisements
Similar presentations
Central Office for Development Strategy and Coordination of EU Funds ABSORPTION CAPACITY FOR IPA COMPONENTS III AND IV IN CROATIA 19 October 2009 Zvonimir.
Advertisements

Enable Procurement Agencies to Fulfill their Roles Push Smooth Implementation of Project Procurement Foreign Debts Management Center, Hebei Provincial.
2006/BG/16/P/PA/001 “Technical Assistance for Preparation of Cohesion /Structural Fund projects in Water and Solid Waste Sectors in Bulgaria” 2003/ BG.
Bulgaria’s strategic road infrastructure challenges.
ISPA Measure 2000 BG 16 P PE 001 Integrated water project – City of Sofia Performance 100%
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
Priority Environmental Investment Programme (PEIP) 28 November, 2008 Brussels, Belgium Murat İlbars Deputy Director, IPA Coordination and Implementation.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
Bank aus Verantwortung Nexus Water – Energy – Climate: Experiences of KfW-financed projects in the MENA-region Dr. Stefan Gramel / Technical Advisor -
PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted /
Progress on developing, preparing and financing environmental investment projects REPUBLIC OF MACEDONIA.
„Extension and modernization of water and wastewater infrastructure in Arad County”
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
WATER AND WASTEWATER Ltd. Rijeka REPUBLIC OF CROATIA Andrej Marochini, B.Sc.C.E.
   EBRD - Water Project Identification, Financing Approach and Donor Coordination in Central and Eastern Europe European Bank for Reconstruction and.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
JASPERS – Supporting Urban Transport Projects Ministry of Regional Development, Czech Republic JASPERS Seminar, Prague - 28th November 2007 Dr. Joachim.
EVN - Energy and Environment Services
GRONTMIJ TURKEY Projects In The Water Sector
Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 004 FGD Plants at Units 5&6 of TPP Maritsa East 2.
Ministry of Regional Development and Public Works _____________________________________________________________________________ PRIORITIES
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Tenth Cohesion Fund (Regulation 1164/94) Monitoring.
WATERCYCLE planning and managing water resources Adriatic New Neighbourhood Programme INTERREG/CARDS-PHARE Sisak-Moslavina County Koprivnica, 16 th January.
Forum for Sustainable Mobility and Metropolitan Development Oradea, November 2013 JASPERS Teo Falato, Transport Sector Specialist.
National financing tools for local environmental infrastructure Emil Savov Deputy Executive Director National Association of Municipalities in Bulgaria.
Member of: Austrian Showcase Sarajevo
MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
A National Prioritized Project Pipeline and Environmental Operational Program Republic of Turkey Ministry of Environment and Forestry.
Environmental Investment Centre (EIC) ISPA Unit Rävala pst 8, TALLINN Tel: Fax:
Road infrastructure in Bulgaria 1 Slovene – Bulgarian Business Forum, 12 th May 2010 Vasilka Kostadinova Director of Directorate “Implementation of EU.
Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
1 Cities for a Strong America Summit 2005 National City Water Survey Executive Summary Water and Wastewater Infrastructure Investment and Finance Albuquerque,
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
Progress Report: Bulk Infrastructure Task Team Premier’s Co-ordinating Forum November 2009.
The Priority Environmental Investment Programme for South Eastern Europe – PEIP National Workshop Developing Environmental Infrastructure Projects in the.
The Cohesion Fund in Poland and the Selection System for Environmental Investments Andrzej Guła Institute of Environmental Economics – Poland CEE Bankwatch.
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
ISPA Measure 2002 BG 16 P PE 016 Varna Integrated Water Project Transformationof Transformation of WWTP Asparuhovo Reconstruction of WWTP Varna ReconstructionofWS&
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
11-14 April 2011 A P A V I T A L (Iai – Romania) general overview U.S. Civil Water and Wastewater Industry Program in Romania & Moldova - BUCHAREST.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Eight Cohesion Fund (Regulation 1164/94) Monitoring.
Priority Environmental Investment Programme National Workshop Montenegro Priority Water Projects on the PEIP List Budva, 13 th May 2008 Ruslan Zhechkov,
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
Open Days 2008 Presentation on JASPERS Dr. Norbert Hahn, Head of JASPERS Operations Management Division 8 th October 2008.
Ing. Alena Bujnová, Head of Water Policy Department Ministry of Environment of the Slovak Republic.
TAIEX – REGIO Multi Country Workshop on management practices for environmental investments 8-9 December 2015, Vilnius Presentation by BULGARIA Ministry.
Ministry of Regional Development and Public Works Vienna May 2016 Water and Sewerage Sector in Bulgaria Challenges and Vision.
Citizen participation on water supply and sanitation in
Integrated Water Project for the town of Sliven
Water projects under The Cohesion Fund.
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
January 2016 December 2017 July 2015 June October 2014 Commencement of first contracts and site construction December 2017 Grand openning.
Financing Public WSS Infrastructure: Reflections on competing investment drivers and other factors to be considered 3 Challenges & 3 Recommendations from.
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
EBRD Support for Water Sector Projects Arthur Schankler Senior Banker Priority Environmental Investment Programme (PEIP) National Workshop Belgrade,
ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors
ISPA Measure 2002 BG 16 P PE 014 WWTP SEVLIEVO
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS
River Basin Management Flood protection
ISPA Measure 2002 BG 16 P PE 009 WWTP Bourgas – Meden Rudnik
ISPA Measure 2002 BG 16 P PE 010 Targovishte Wastewater Collection and Treatment, Republic of Bulgaria.
ISPA Measure 2002 BG 16 P PE 011 WWTP LOVECH
Sewerage systems: Types and comparison. Pipes
Shoumen Water Cycle Improvements
PUBLIC PROCUREMENTS IN THE REPUBLIC OF SERBIA
Presentation transcript:

ISPA Measure 2001 BG 16 P PE 008 Wastewater Treatment located in Blagoevgrad Republic of Bulgaria

Works Contract Commencement Date: 20th May 2005 Completion Date: 26th January 2009 Physical Execution: 100 % Financial Execution: 100 % 1 year DNP finished on 26th January 2010

WWTP Blagoevgrad 2010

WWTP Blagoevgrad 2010

WWTP Blagoevgrad 2010

Supervision Contract Commencement Date: 25th April 2005 Completion Date: 26th January 2010 Time elapsed: 100 % Financial Execution: 97 % (the contract is closed)

Commencement Date: 19th August 2008 Technical Assistance for Preparation of investment projects for Water supply and Sewerage network improvements Commencement Date: 19th August 2008 Completion Date: 19th August 2010 Time elapsed: 100 % Financial Execution: 100 % Activities: all activities are completed, i.e. Master plan, Feasibility Study incl. CBA, Application Form for OPE funding, Designs, Tender dossiers for Works and Supervision

Compliance with Article 8 of the Financing Memorandum All conditions under Article 8.3, Article 8.4 and Article 8.5 of the FM are considered fulfilled.