LHC[OPN/ONE]  IPv6  status

Slides:



Advertisements
Similar presentations
KIT – The cooperation of Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH) LHCOPN issues Responce of MDM monitoring Steinbuch.
Advertisements

KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Steinbuch Centre for Computing (SCC)
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPiX, Oxford 24 Mar 2015.
CERN IT Department CH-1211 Geneva 23 Switzerland t T0 report WLCG operations Workshop Barcelona, 07/07/2014 Maite Barroso, CERN IT.
Site report: Tokyo Tomoaki Nakamura ICEPP, The University of Tokyo 2014/12/10Tomoaki Nakamura1.
SC4 Workshop Outline (Strong overlap with POW!) 1.Get data rates at all Tier1s up to MoU Values Recent re-run shows the way! (More on next slides…) 2.Re-deploy.
HEPiX FSWG Progress Report Andrei Maslennikov Michel Jouvin GDB, May 2 nd, 2007.
A short introduction to the Worldwide LHC Computing Grid Maarten Litmaath (CERN)
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) WLCG GDB, CERN 8 July 2015.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
The production deployment of IPv6 on WLCG David Kelsey (STFC-RAL) CHEP2015, OIST, Okinawa 16 Apr 2015.
HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Steven McDonald TRIUMF Network & Computing Services Canada’s National Laboratory.
WLCG Service Report ~~~ WLCG Management Board, 24 th November
Connect communicate collaborate LHCONE L3VPN Status Update Mian Usman LHCONE Meeting Rome 28 th – 29 th Aprils 2014.
LHCONE & TEIN TEIN*CC Patch Lee 1 Nantou, TW 13 August 2014 TABLE OF CONTENTS 1.TEIN4 Networks 2.Understanding of Data Flow from CERN 3.Benefits for deploying.
John Gordon STFC-RAL Tier1 Status 9 th July, 2008 Grid Deployment Board.
INFN TIER1 (IT-INFN-CNAF) “Concerns from sites” Session LHC OPN/ONE “Networking for WLCG” Workshop CERN, Stefano Zani
Connect. Communicate. Collaborate perfSONAR MDM Service for LHC OPN Loukik Kudarimoti DANTE.
Alberto Aimar CERN – LCG1 Reliability Reports – May 2007
KIT – Universität des Landes Baden-Württemberg und nationales Forschungszentrum in der Helmholtz-Gemeinschaft STEINBUCH CENTRE FOR COMPUTING - SCC
ATLAS Bulk Pre-stageing Tests Graeme Stewart University of Glasgow.
Networks ∙ Services ∙ People Mian Usman LHCOPN/ONE meeting – Amsterdam Status update LHCONE L3VPN 28 th – 29 th Oct 2015.
1 | Bruno Hoeft, KIT / AutoKNF - LHC(OPN/ONE), 06/17/13 | Karlruhe Institute of Technology (KIT) Bruno Hoeft (KIT/SCC) AutoKNF – status June 2013.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
SL5 Site Status GDB, September 2009 John Gordon. LCG SL5 Site Status ASGC T1 - will be finished before mid September. Actually the OS migration process.
INFN-T1 site report Andrea Chierici On behalf of INFN-T1 staff HEPiX Fall 2015.
Connect communicate collaborate LHCONE European design & implementation Roberto Sabatino, DANTE LHCONE Meeting, Washington, June
WLCG and IPv6 David Kelsey (STFC-RAL) LHCOPN/LHCONE, Rome 28 Apr 2014.
Connect. Communicate. Collaborate LHCOPN lambda and fibre routing – Episode 3 Michael Enrico Network Engineering & Planning Manager DANTE LHC Meeting,
Summary of SC4 Disk-Disk Transfers LCG MB, April Jamie Shiers, CERN.
LHC-OPN operations Roberto Sabatino LHC T0/T1 networking meeting Amsterdam, 31 January 2006.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPIX, BNL 13 Oct 2015.
David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 LHCOPN Meeting January 2007 Many thanks to DANTE for hosting the meeting!! Thanks to everyone.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ENOC status LHC-OPN meeting – ,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Alberto Escolano – RedIRIS alberto.escolano.
T0-T1 Networking Meeting 16th June Meeting
Network evolving 2020 and beyond
Network activities update ALICE workshop 4th of May 2017 edoardo
LHCOPN lambda and fibre routing Episode 4 (the path to resilience…)
LHCOPN/LHCONE status report pre-GDB on Networking CERN, Switzerland 10th January 2017
DE-KIT(GridKa) -- LHCONE
Dirk Duellmann CERN IT/PSS and 3D
LHCONE status and future
LHCOPN/ONE meeting BNL 4-5 of April 2017 summary report GDB 12th of April 2017
2nd Asia Tier Centre Forum Summary report 4th April 2017 edoardo
Daniele Cesini – INFN-CNAF - 19/09/2017
LHCOPN update Brookhaven, 4th of April 2017
INFN Computing infrastructure - Workload management at the Tier-1
Plans to support IPv6-only CPU on WLCG
INFN CNAF TIER1 and TIER-X network infrastructure
Project Status Report Computing Resource Review Board Ian Bird
Hsin-Yen Chen LHCONE/LHCOPN 16 Oct 2017 KEK, Japan
LSST - IN2P3 connectivity
Support for IPv6-only CPU – an update from the HEPiX IPv6 WG
Venue and Participants
LHCONE L3VPN Status update Mian Usman LHCOPN-LHCONE meeting
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
Update from the HEPiX IPv6 WG
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
Venue and Participants
Deployment of IPv6-only CPU on WLCG - update from the HEPiX IPv6 WG
LHCONE In Europe Mian Usman DANTE.
KISTI Daejeon, 23rd September 2015
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
Unexpected traffic in LHCONE ?
Tony Cass, Edoardo Martelli
an overlay network with added resources
Network performance issues recently raised at IN2P3-CC
MB Maarten Litmaath CERN v1.0
IPv6 update Duncan Rand Imperial College London
Presentation transcript:

LHC[OPN/ONE]  IPv6  status Bruno Hoeft / DE-KIT

all Tier-1s offer IPv6 peering to LHCOPN proposal of last meeting  accepted with no objections: activities/requests  require IPv6 readiness Request all Tier-1s offer IPv6 peering to LHCOPN provide a dual stack PerfSONAR machine by April 2015. Tier-2s offer IPv6 peering to LHCONE by August 2015. LHC[OPN/ONE] – Cambridge, 28st Oct. 2015 -- Bruno Hoeft

LHCOPN  current IPv6 CIDRs CH-CERN 513 (CERN) 61339 (CERN-WIGNER) - 128.142.0.0/16 188.184.128.0/17 188.185.128.0/17 (AS61339) 2001:1458:301::/48 2001:1458:302::/48 2001:1459:301::/48 DE-KIT 34878 (FZK) 192.16.166.32/30 192.16.166.36/30 192.108.45.0/24 192.108.46.0/23 2001:1458:302:9::/64 2001:1458:302:D::/64 2a00:1398:104::/46 ES-PIC 43115 (PIC) 192.16.166.56/30 192.16.166.60/30 193.109.172.0/24 2001:1458:302:11::/64 2001:67c:1148:200::/64 2001:67c:1148:201::/64 2001:67c:1148:202::/64 FR-CCIN2P3 789 (IN2P3) 192.16.166.40/30 192.16.166.44/30 (not used) 193.48.99.0/24 2001:1458:302:8::/64 2001:660:5009:9::/64 IT-INFN-CNAF 137 (GARR) 192.16.166.16/30 192.16.166.192/29 131.154.128.0/17 ? 2001:1458:302:27::1 ? 2001:760:4205::/48 KR-KISTI 1237 (Kreonet) 192.16.166.164/30 134.75.125.0/24 2001:1458:302:29::/64 NDGF 39590 (NDGF) 192.16.166.48/30 192.16.166.52/30 109.105.124.0/22 2001:1458:302:F::/64 2001:948:40::/42 Tier-1s still missing: NL-T1 BNL ASGC Triumf RAL  Janet no IPv6 peer Russian sites RRC-KI JINR LHC[OPN/ONE] – Cambridge, 28st Oct. 2015 -- Bruno Hoeft

PerfSONAR of Tier-1s Tier-1 LHCOPN IPv6 Peering LHCONE IPv6 Peering   LHCOPN IPv6 Peering LHCONE IPv6 Peering Perfsonar via IPv6 ASGC -- BNL not on their prioroty list CH-CERN  LHC[OPN/ONE] DE-KIT FNAL FR-CCIN2P3 LHCONE IT-INFN-CNAF NGDF ES-PIC LHCOPN KISTI startet but no IPv6 Peering implemented NL-T1 peering and dual-stack Perfsonar in preperation Triumf IPv6 peering planned at end of 2015 RRC-KI-T1 LHC[OPN/ONE] – Cambridge, 28st Oct. 2015 -- Bruno Hoeft

PerfSONAR of Tier-2s LRZ ? GPI – general purpose internet LHC[OPN/ONE] – Cambridge, 28st Oct. 2015 -- Bruno Hoeft

dual stack PerfSONAR (WEB presents) LHC[OPN/ONE] – Cambridge, 28st Oct. 2015 -- Bruno Hoeft

The remaining tier-1 sites  road map ? ToDo GARR Traceroute -s perfsonar-ps.cnaf.infn.it -c perfsonar-bw.cern.ch - OK Traceroute -s perfsonar-ps.cnaf.infn.it -c perfsonar-bw.cern.ch - failed Not possible, does not reach destination  routing issue?  solved – CERN is rejecting traceroute  exception for perfsonar? The remaining tier-1 sites  road map ? IPv6 effort still ongoing  expect that IPv6 production services will be available during this year Automated collection of all IPv6 prefixes of LHCONE  Michael O’Conner ? LHC[OPN/ONE] – Cambridge, 28st Oct. 2015 -- Bruno Hoeft

LHC IPv6 Working Group Questions ? LHC[OPN/ONE] – Cambridge, 28st Oct. 2015 -- Bruno Hoeft