ToPO Tools for PS Operation

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

AB / CO Review1 PS Complex Software for 2006 PS Complex Operation Teams & S. Pasinelli.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
ToPOTools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April –
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
Industrial Control Engineering PXI software support and accelerator integration.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Transverse Impedance Localization in SPS Ring using HEADTAIL macroparticle simulations Candidato: Nicolò Biancacci Relatore: Prof. L.Palumbo Correlatore.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
An Introduction To Particle Accelerators A-Level Physics.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
TS, Length of YETS EYETS LIU & CONS Project
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
‘Computer power’ budget for the CERN Space Charge Group Alexander Molodozhentsev for the CERN-ICE ‘space-charge’ group meeting March 16, 2012 LIU project.
JINR-CERN 5-years Partnership Program N.Russakovich 103-rd session of theJINR Scientific Council meeting JINR, Dubna, 21 February 2008.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.
Industrial Controls Engineering Department Results of the PXI survey launched in June 2011 First CERN PXI Users Group meeting - 19 th October H.
CNGS Review 15 July 2003 M. Meddahi1 EVM for CNGS Definitions Pre-requisites Application to CNGS.
Timing Review Evolution of the central and distributed timing How we got where we are and why What are its strengths and weaknesses.
Registered participants participants from outside Cern.
CERN Large Hadron Collider
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
A monitoring system for the beam-based feedbacks in the LHC
ICE SECTION The coolest place to be! Elias Métral
Presented by Li Gang Accelerator Control Group
Performance monitoring framework for the technical infrastructure
Status and Plans for InCA
Radiation monitoring and follow up during LHC commissioning
M.J. Barnes : Canadian Involvement with LHC
Online check lists Half Sector Test
LIU Wire Scanner Milestones June 2017
Using MathCAD, Matlab and PSpice for electronics simulations
Function Generator Remote Control
Evolution and future of the Access safety and control systems
MP3 Review Software tools
Post-mortem of Experience with LEIR Controls
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Introduction SMP = Safe Machine Parameters
the CERN Electrical network protection system
James Ridewood BE-OP-SPS
Managing infrastructure faults to minimize accelerator down time
nuSTORM and the Physics Beyond Colliders workshop
MECHANICAL ENGINEERING OF ACCELERATOR COMPONENTS
Offline Analysis Framework STATUS
Development of built-in diagnostics in the RADE framework (EN2746)
CERN The world’s largest Particle Physics Research Center in Geneva
Particle Detection System for MERIT
Candidato: Nicolò Biancacci
Present and Future test facilities for High-intensity Targetry CERN
SLHC-PP kick-off meeting, CERN 9 April 2008
High Level applications development status
Chemistry 283g Experiment 1.
Particle Detection System for MERIT
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
List of IPAC19 papers with reference to HL-LHC
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

ToPO Tools for PS Operation Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Tools for PS Operation TI LHC SPS TI CPS SPS LHC Labview in BE/OP group, From 1st RADE Workshop - 2009 LabView on Beam Operation before RADE (Snapshot close to 2007 for AB-OP) TI (Technical Infrastructure) LHC (Large Hadron Collider) SPS (Super Proton Synchrotron) Quasi non present Beam analyzing, Visualizations, steering SPS beam tools & Post Mortem Specialists, Experts & Experimental Areas Many dedicated LabView applications TI (Technical Infrastructure) Quasi non present Specialists, Experts & Experimental Areas Many dedicated LabView applications CPS (Proton Synchrotron Complex, LINAC, PSB, PS, AD …) Some beam analyzing SPS (Super Proton Synchrotron) Beam analyzing, Visualizations, steering LHC (Large Hadron Collider) SPS beam tools & Post Mortem Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Tools for PS Operation Spectrum toolkits Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Tools for PS Operation Spectrum toolkits Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Courtesy of C.Charrondiere Tools for PS Operation Spectrum toolkits Courtesy of C.Charrondiere Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Samplers Tools : What is a Sampler ? Tools for PS Operation Samplers Tools : What is a Sampler ? Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Samplers Tools : Sampbox Tools for PS Operation Samplers Tools : Sampbox Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Samplers Tools : Sampler FFT Tools for PS Operation Samplers Tools : Sampler FFT Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Samplers Tools : XSS - Xeneric Sampler Survey Tools for PS Operation Samplers Tools : XSS - Xeneric Sampler Survey Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Prototype application : DODO Tools for PS Operation Prototype application : DODO Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Prototype application : Bump16 Control Tools for PS Operation Prototype application : Bump16 Control Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Prototype application : Bump16 Control Tools for PS Operation Prototype application : Bump16 Control MAD-X calculation Bump simulation Send correction Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Prototype application : Dumper Control Remote Tools for PS Operation Prototype application : Dumper Control Remote Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Prototype application : Dumper Control Remote Tools for PS Operation Prototype application : Dumper Control Remote Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

«Generic» application : Post Mortem Analysis Tools for PS Operation «Generic» application : Post Mortem Analysis Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

National Instruments – Labview Tools for PS Operation Sources and Thanks to : EN/ICE-MTA BE/OP-PS National Instruments – Labview Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Tools for PS Operation QUESTIONS - REMARKS Genoud Hervé Matli Emanuele BE/OP-PS Rade Workshop EN/ICE-MTA CERN April – 1 - 2011

Applications’ base line for Beam Operation : Rade On Beam Operation Applications’ base line for Beam Operation : Safety acces on equipements Status, Settings Quick reaction Easly implemented and maintain Can be deployed on other accelerators Be « Pulse to Pulse Monitoring » (PPM) Rade Workshop EN/ICE-MTA Genoud Hervé BE/OP CERN May – 26 - 2009