Security WG: Status Briefing

Slides:



Advertisements
Similar presentations
1 CCSDS Security Working Group Fall 2008 Meeting October 2008 Berlin Germany.
Advertisements

7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > www.DLR.de/rb Slide 1.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
1 Network Layer Security: Run over non-IP Protocol? Howie Weiss (NASA/JPL/Parsons) San Antonio, TX October 2013.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Fall 2005 Meeting Atlanta GA September 16, 2004 Howard Weiss NASA/JPL/SPARTA.
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
1 CCSDS Security Working Group Fall 2010 Meeting October 2010 British Standards Institute London, UK Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
1 CCSDS Threat Document Discussion CCSDS Security Working Group Fall 2004 Meeting CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Security WG: Status Briefing Noordwijkerhout, The Netherlands) 31 March 2014 Howard Weiss NASA/JPL/PARSONS
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
1 Information Security Planning Guide CCSDS Security WG Spring 2005 Athens, GR Howard Weiss NASA/JPL/SPARTA April 2005.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Panel P1J: Navigation Data October 2002 CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code.
1 CCSDS Security Working Group Spring 2014 Meeting 31 March – 1 April 2014 Noordwijkerhout, The Netherlands Howard Weiss NASA/JPL/PARSONS* Identity crisis:
1 Document Status CCSDS Security Working Group March 2008.
SM&C WG Plenary CCSDS Spacecraft Monitoring & Control WG (SM&C) Workshop #17, Darmstadt (D), Apr 2012 Mario Merri, ESA/ESOC, Chairman.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS
Security WG: Status Briefing BSI, London UK 10 November 2014 Howard Weiss NASA/JPL/PARSONS
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
Security WG: Report of the Spring 2006 Meeting Rome, Italy June 16, 2006 Howard Weiss NASA/JPL/SPARTA
10-Dec-2012-cesg-1 IOAG-17d telecon 19th Nov 2013 CCSDS Engineering Steering Group (CESG) Report to the IOAG.
19-May-2015-cesg-1 CESG Spring 2015: Project Schedule & Resources.
Security WG: Status Briefing Cleveland, Ohio USA 15 October, 2012 Howard Weiss NASA/JPL/SPARTA skype: hsweiss.
Wireless WG Monthly Teleconference
KM SDLS Extended Procedures YB
CCSDS Security Credentials Blue Book
The CCSDS Security WG is chartered to:
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
Security WG: Report of the Fall 2005 Meeting
Network Layer Security Update
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
CCSDS Systems Engineering Area: Security Working Group
Security WG: Report of the Spring 2016 Meeting
SPACE INTERNETWORKING SERVICES (SIS) AREA
Space Communication Cross Support Architecture WG
Wireless WG Monthly Teleconference
Wireless WG Monthly Teleconference
Security WG: Report of the Fall 2013 Meeting
Delta-DOR WG: Report of the Fall 2010 Meeting
CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code Oct 2002 ******************************************************
Atlanta, Georgia, USA, 16 September 2005
SPACECRAFT ONBOARD INTERFACES SERVICES
The Hague, Netherlands 06Nov17 Brigitte Behal, CNES Mario Merri, ESA
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
Presentation transcript:

Security WG: Status Briefing San Antonio, Texas USA 28 October, 2013 Howard Weiss NASA/JPL/PARSONS howard.weiss@parsons.com +1-443-430-8089

Bordeaux (Spring 2013) Meeting Agenda 15 April 2013 08:30 – 09:30: CCSDS Plenary 09:30 – 12:30: Systems Engineering Area (SEA) Plenary 13:30 – 18:30: Security WG Welcome, introductions, logistics, agenda review Review results of Fall 2012 (Cleveland) meeting Status of documents, action items Charter review (updated per Cleveland mtg) Algorithm Yellow Book Status and Testing DLR testing complete & documented (Richter) Any other testing plans? Algorithm Green Book Review (Weiss) Coding performance (Aguilar-Sanchez)

Meeting Agenda (cont) 16 April 2013 (08:30 – 18:30) Key Management Blue Book (Fischer/Aguilar-Sanchez) KM for SDLS extended procedures Threat book re-write (Black/Weiss/Biggerstaff) Network Layer Security Discussion (Weiss) Adaptation profile outline Testing agencies Link Layer Security Update (Biggerstaff/Weiss/Aguilar-Sanchez) Physical Layer Security (Aguilar-Sanchez) Advanced Coding research Joint security meeting with DTN Working Group Other areas of discussion Proposed new areas of work 17 April 2013 08:30-18:30: Space Data Link Security WG 18 April 2013 08:30-12:30: Space Data Link Security WG 13:30-18:00: SEA Wrap-up Plenary

Bordeaux Attendance Name Organization Email Address Howard Weiss (Chair) NASA/JPL/PARSONS howard.weiss@parsons.com Gordon Black UK Space Agency/Logica gordon.black@logica.com Daniel Fischer ESA/ESOC daniel.fischer@esa.int Martin Pilgram DLR martin.pilgram@dlr.de Julio Vivero GMV jvivero@gmv.com Ignacio Aguilar-Sanchez ESA/ESTEC ignacio.Aguilar.Sanchez@esa.int Lei Zhang BITTT zhanglei@bittt.cn Dorothea Richter dorothea.richter@dlr.de Julian Airaud CNES Julien.airaud@cnes.fr Roberto Garello Politecnico di Torino garello@polito.it

Meeting Summary Attendees from UK Space Agency, ESA/ESTEC, ESA/ESOC, DLR, CNES, GMC, BITTT, and NASA/JPL. Due to sequestration budget issues NASA Johnson, Goddard, and Glenn representatives were unable to travel. Reviewed charter updates approved by CESG after Cleveland meeting. Also reviewed projects framework and updated the Algorithms Green Book and Key Management Blue Book schedules. Reviewed action items – all except for three were completed. Reviewed “management remarks on Security WG” with Martin Pilgram. Provided updated language regarding Security WG strategic plan. Algorithm Yellow Book: No other Agencies have any plans for additional Algorithms testing. Reviewed draft of Algorithm Green Book. Very few changes. Reviewed status of Network Layer Security: adaption profile discussions with Tom Gannett. Request for additional testing to GRC. Reviewed the KM Blue Book progress and the integration with the SDLS extended procedures directions. Discussed ESA-sponsored advanced coding research program: AJ. Discussed directions for Threat Green Book revision. Held joint meeting with DTN WG to discuss DTN security. SDLS: revisions to Red-3, extended procedures, SLP.

Action Items Item Number Action Item: Assigned to: Date Due: SecWG0413:1 Update Algorithm GB Howard Weiss 05/31/13 SecWG0413:2 Update project framework dates & information 04/22/13 SecWG0413:3 Investigate if IPsec can be run over non-IP protocols. 06/01/13 SecWG0413:4 Discuss changing Key Management BB to Key Management MB with Area Director. SecWG0413:5 Review existing list of Threat GB threats for additions, deletions, expansion, etc. All 08/30/13 SecWG0413:6 Set up an interim telecon 06/15/13