Status of BESSY II and bERLinPro

Slides:



Advertisements
Similar presentations
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Advertisements

Wolfgang Anders, Helmholtz-Zentrum Berlin for materials and energy (HZB) ESLS-RF Meeting ESRF Status of RF at HZB and SRF at BERLinPro.
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
Progress and Plan for Superconducting RF Cavity RF Group.
KAGEYAMA, T. Open Meeting for Proto-Collaboration March 19, 2008.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Low Emittance RF Gun Developments for PAL-XFEL
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
BERLinPro An ERL Demonstration facility at the HELMHOLTZ ZENTRUM BERLIN.
3.9 GHz Cryomodule Shipment to DESY E.Harms on behalf of the Third Harmonic Effort Team (AD & TD, with help from PPD, FESS, BS)
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Operational experience of high-power RF at Diamond Light Source
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
ESLS-RF Trieste, September 29-30, Åke Andersson RF systems for the MAX IV rings Åke Andersson On behalf of the MAX-lab RF team.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
ALBA RF Systems Francis Perez.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
PETRA III, Status and Upgrade
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
Degradation and Recovery of Cavity Performance
Status and New Developments of RF Systems of ALBA
WG3 Summary High current and CW accelerators
Status and prospects of VEPP-5 Injection Complex
Joint Accelerator Research JGU & HZB
BriXS – MariX WG 8,9 LASA December 13, 2017.
World Wide Fundamental Power Coupler meeting #3
Wolfgang Anders, BESSY, Berlin
Recent high-gradient testing results from the CLIC XBoxes
Operational Experience with the Cornell ERL Injector SRF Cavities
CEPC RF Power Sources System
ERL Main-Linac Cryomodule
Status of RF Group HZB (former BESSY) Wolfgang Anders.
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Status of the ASTRID2 RF systems
Status of the JLEIC Injector Linac Design
Status and New Developments of ALBA RF Systems
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Presentation transcript:

Status of BESSY II and bERLinPro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI

Outline BESSY II Problems with circulators Landau cavity leakage HOM cavity vacuum problems SSA – experience after one year of operation BERLinPro Status of the building Klystron problems Gun module production BESSY VSR Status SSA dreams

BESSY II problems with AFT circulators We bought new temperature compensation units (TCU) because of aging problems All circulators are sent to AFT for adaption New TCU units do not work. TCUs switch off transmitters at a temperature slightly too low Potentiometers on maximum setting No support by AFT, but they offered a software for a high price to get better settings.  We decided not to buy and run with lower performance AFT circulator with RF shielding We detected RF radiation from circulators  adapted a shielding

BESSY II Landau Cavity Leakage I Due to fail of the control system landau cavity 2 has been on 18 kW power for half an hour (water return temperature 48 deg.) Typical operation 2 kW! Interlock 20 kW In the beamline of the straight section of the landau cavities and a sc wave length shifter magnet high radiation levels were detected since this event. Radiation officer says it is radiation by bad vacuum Vacuum gauges few meters away show good vacuum, leak detection negative In shutdown we opened landau cavities and looked into the cavities Landau cavities with waveguide HOM dampers Landau cavities in BESSY II Ring

BESSY II Landau Cavity Leakage II In the cavities we saw broken ferrite (C48) tiles Some small ferrite pieces from upper waveguide have been fallen into the cavity body Carefully performed search for leakages detected a vacuum leak between body and lit of landau cavity #2 impossible to repair broken ferrite tiles in HOM dampers History: Starts at production by SDMS Pot and lit have been brazed at 780 °C Was leaky, second brazing at 600 °C. Solder contains cadmium making the copper brittle. Still not leak tight. More brazing by hand. Due to the high power load it opened a vacuum leakage

Landau cavity leakage counter measures Counter measures in preparation: Bended upper HOM waveguides to prevent ferrite pieces to fall into the cavity body Smaller ferrite tiles with rounded edges, same as the 500 MHz HOM cavity Ports for vacuum pumping and vacuum measurement Ports for in situ optical / infrared inspection One waveguide with vacuum valve planned as a test station for different absorbers sizes and material (SiC) for bERLinPro and Bessy VSR New HOM absorber with rounded edges HOM absorber of 500 MHz cavity New setup for landau cavities

HOM Cavity vacuum problem 2013 two HOM cavities were installed at BESSY II No in situ bake out Poor vacuum in section (10-8 mbar) 2015 next two cavities installed Bake out Vacuum stays bad for the “old” cavities New installed cavities 10-9 mbar Vacuum reading in cavity section 10-8 mbar range 2016 section opened. Look with endoscope and intensive leak detection  nothing detected Spare cavity still in production at RI Now spare cavity is delivered 2017 still open, if we exchange cavity #2 and section between cavities Four HOM Cavities in BESSY II storage ring

Sumerrizing SSA operation first year In the shutdown 2015 all modules were resoldered with high temperature solder 11 months of operation: 12 modules failed out of 630 modules (all burned output section in the module) No other failures No beam loss due to the SSA Best support by Cryoelectra Few beam losses by circulator and water Few beam losses by work on our PLC 500 MHz 80 kW SSA (Cryoelectra) Modules for resoldering Burned output in a module

bERLinPro: high-current, low-emittance technology demonstrator Basic Parameter max. beam energy 50MeV max. current 100mA (77pC/bunch) normalized emittance < 1 p mm mrad bunch length (straight) 2 ps or smaller rep. rate 1.3GHz losses < 10-5

Status bERLinPro Shell of building is close to finalization Interior construction is ongoing Expected start of accelerator installation: February 2017 Technic hall Klystron gallery Accelerator hall

Status bERLinPro sc gun module Now: sc photo injector gun module mounting Hope to pump vacuum by the end of the year Try to have first electrons from gun module in testing hall in spring 2017 cryogenic feed box module cold string

bERLinPro RF system RF Transmitters bERLinPro: three 1.3 GHz 270 kWcw klystron based transmitters for the injector four 15 kW SSA for recovery linac (and one for booster) Prototype transmitter in the testing hall klystron magnet power supply klystron Klystron transmitters: Two power supplies (FUG) 65 kV 9A are delivered, third will be delivered in December First transmitter is installed in a testing hall All klystrons (CPI) are produced All klystrons factory acceptance test o.k.

Klystron problems bERLinPro First klystron was delivered, vacuum o.k. There is a large Swagelock water connector at the collector CPI fastened the connector  vacuum leakage Klystron problems bERLinPro Second klystron was delivered Difficult to install in the magnet, because there was a little angle between collector and tube CPI assisted to install  high body current at different voltage levels Now waiting for the third klystron

Status BESSY VSR BESSY VSR is a project to install high gradient sc cavities at 1.5 GHz and 1.75 GHz in the BESSY II storage ring to produce long and short bunches simultaneously Project is still not approved Directors give 15 positions and 3 Mio€ for prototypes and calculations Try to acquire third party money Two cryo-modules with each: 1 x 5 cell @ 1.5 GHz & 1 x 5 cell @ 1.75 GHz operating at 1.8 K LHe temperature active length: 0.93 m with 20 MV/m gradient: 30 MVGHz total gradient: 60 MVGHz ( x 80 )

SSA 1.3 GHz, 1.5 GHz and 1.75 GHz There is hope for third party money next year to buy some cryo stuff and the solid state transmitters In this case we would buy SSA for BESSY VSR and bERLinPro in parallel to have all transmitters from same company to reduce spare part costs Our shopping list: 3 x 15 kW 1.5 GHz (BESSY VSR) 3 x 15 kW 1.75 GHz (BESSY VSR) 4 x 15 kW 1.3 GHz (bERLinPro) Need some luck

Thank you !!! Summary Some problems solved or to be solved Much work on new projects using superconducting cavities Thank you !!! Arc of light between BESSY II (left, present age) and bERLinPro (right, future)