“Description of a PBS dedicated to Km3Net”

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Assurance and Risk Assessment in the KM3NeT Neutrino Telescope Design Study” Technical.
Mission Operations in Small Satellite Projects Making Mission Operations Effective J. Burkert Colorado Space Grant Consortium.
Project Management Session 7
André Weiß, DLR Institute of Space Systems Concurrent Evaluation – An Application for DLR’s Concurrent Engineering Facility SECESA 2010, October,
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
What is Business Analysis Planning & Monitoring?
Chapter : Software Process
Chapter 2 What is software quality ?. Outline What is software? Software errors, faults and failures Classification of the causes of software errors Software.
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
Software Quality Assurance Activities
Planning the project Project Management (lecture).
Software Project Management Lecture # 7. Outline Project Scheduling.
Committee of Sponsoring Organizations of The Treadway Commission Formed in 1985 to sponsor the National Commission on Fraudulent Financial Reporting “Internal.
SQI © T.P. Rout and Griffith University, 1996 A Unified Reference Model for the Processes of Software and System Life Cycles Terry Rout Software Quality.
QUALITY ASSURANCE ACHIEVEMENTS  Development of QA according to ISO 9001 KM3NeT Quality Standard,  To be considered as the starting point to implement.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
IT SOFTWARE PROJECT MANAGEMENT
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
An organizational structure is a mostly hierarchical concept of subordination of entities that collaborate and contribute to serve one common aim... Organizational.
Testing and Validation Kuvvet Atakan and the WP6 and WP7 Teams.
The Project Plan Plan Your Work, then Work Your Plan
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
Large Facilities Manual New Guidance on Cost Estimating and Analysis 2016 NSF Large Facilities Workshop Kevin Porter Large Facilities Advisor, LFO, NSF.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Control Considerations for the KM3NeT Very Large Volume neutrino Telescope” The.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
Creating a Work Breakdown Structure with Microsoft Project.
Towards the TDR KM3NeT-DS WPx Meeting, Paris, Feb , 2009 Uli Katz ECAP / Univ. Erlangen  My private views  Basis for discussion  Decisions taken.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
MENG 446 : Management of Engineering Projects
The Software Lifecycle Stuart Faulk. Definition Software Life Cycle: evolution of a software development effort from concept to retirement Life Cycle.
Chapter 1 Computer Technology: Your Need to Know
Camera PDR/CD1 Planning 19 September 2008
Project Quality Management
Chapter 1 The Systems Development Environment
Module nine PMP® Mastery 2016 APMG Create WBS
Fundamentals of Information Systems, Sixth Edition
Software Verification and Validation
WORK BREAKDOWN STRUCTURE
Software Planning Guidelines
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
IEEE Std 1074: Standard for Software Lifecycle
Information Technology Project Management – Fifth Edition
Chapter 1 The Systems Development Environment
د. حنان الداقيز خريف /28/2016 Software Quality Assurance ضمان جودة البرمجيات ITSE421 5 – The components of the SQA.
Defining the Activities
Software Quality Engineering
Quality Management Systems – Requirements
CLINICAL INFORMATION SYSTEM
Fundamental Test Process
Software engineering -1
Practical Software Engineering
Software Engineering: A Practitioner’s Approach, 6/e Chapter 2 Process: A Generic View copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
The Technology Integration Planning Model
Project Scope Management
An Introduction to Project Management and Software Process Improvements Mike Barker /11/2019.
I Datagrid Workshop- Marseille C.Vistoli
Project Scope Management
PLANNING & SCHEDULING (First Part)
CAD DESK PRIMAVERA PRESENTATION.
Chapter 1 The Systems Development Environment
Defining the Project Tasks, Cost and Schedule
State University of Telecommunications
Chapter 13: Software Project Management
Presentation transcript:

“Description of a PBS dedicated to Km3Net” WP7: Risk Assessment and Quality Assurance “Description of a PBS dedicated to Km3Net” F. Louis, J. Giraud IRFU/SEDI

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009 Contents KM3NeT logic layer structure Definition of a PBS Data needed for QA implementation Data needed for RA implementation F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

PBS What it is: A hierarchical breakdown of the products which depicts the entire system architecture. What it is not: A project schedule or a chronological listing An organizational hierarchy F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

Logic layer structure proposed Chinese box model in which boxes are also connected each other F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009 Each boxes constitute a layer in which components are connected in tree logic Storey 1 Detection Unit 1 SJB 1 Storey n Storey 1 Detection Unit n Storey n SJB n F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

Why do we need to do this: - To ensure all works needed are included - To be sure that every body have the same view of the project To serve as an efficient tool to converge to a consensus and becomes inputs to Define activities Estimate cost Plan risk management Plan resources F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

What it must be: What it must not be: Remark: A list of components associated to requirements with identified and testable performances or characteristics A sufficient (with no over killing) and necessary description of the complete system What it must not be: A list of processes or functions performed in the development of these products. Remark: This decomposition process MUST be iterative It cannot be a one shot effort F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

Define a PBS will be more than “useful” to organize the project Summarize Define a PBS will be more than “useful” to organize the project and it is an essential step in its development plan The list of deliverable products will also help to define The tasks to produce these components and the material And resources associated. F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009 Km3net project F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009 First Level of the hierarchical tree On Shore infrastructure (Telescope and Sea Science Units) Deep sea network Telescope Unit Earth Sea Sciences Sea Operation System Test & Integration Systems Maintenance & Decommissioning Quality Assurance & Risk Analysis General Requirements Project Management System Engineering PBS QA & RA, Procedures manuals WBS / OBS F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009 Generic Storey F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009 3 possible examples of a storey F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

Data needed for the QA implementation (1/2) For each system/component Definition A description of the component/system Functions A definition of the functions to be performed by the component/system within the KM3NeT dector operation life F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

Data needed for the QA implementation (2/2) For each system/component Requirements A definition in measurable terms (including max, min and nominal values) of what must be done by the component/system to be acceptable to the function in the project: Physical requirements Power requirements Structural/mechanics requirements Enviromental requirements, i.e. undersea water depth, and other paramenter Success criteria A definition in measurable terms of what must be done for the component/system to be acceptable to the success of the project F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

Data needed for the RA implementation Layer by layer has to be given: how many and what components constitute that layer (including design/reports and every useful specification) design of the parts and number (including reports and every useful specification) design of the connection and connectors between them (and if is possible a sketch of the system like) the failure rate (if it was evaluated) and the way in which it was evaluated (test report, and FIT rate value related to each part) F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009 Conclusions Using such a tool will be useful to: Have a global view of all proposals Make parallel analysis between “same” object Be sure that all components of the project will be take in account It is recommended to implement the PBS with WP7 representatives F. Louis, J. Giraud IRFU/SEDI Paris, 23-02-2009

WP7: Risk Assessment and Quality Assurance “Description of a PBS dedicated to Km3Net” "Design Study for a Deep Sea Facility in the Mediterranean for Neutrino Astronomy and Associated Sciences” THANK VERY MUCH FOR YOUR KIND ATTENTION