What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.

Slides:



Advertisements
Similar presentations
Presenters Scott Gaudineer, Program Executive Caldwell Flores Winters
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Organization of Primary Entities
Contract CloseOut.
LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Design/Build Solutions to your construction projects, large and small.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Your Deliver Method... …Pick it Early
CTC-470 Construction Administration Project Management Concepts.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Different Procurement Methods
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
CIVL202 Construction Engineering I Tutorial 6 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
TEAM 1 Share All Project Risks. Implications - DBB ArchitectContractorClient/Owner Risk LevelLowHighMedium BehaviorDelivery and DoneLowest cost and fast.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Agency Construction Management :CM NOT AT-RISK
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
TOPIC-9- PROJECT ORGANIZATION
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
UTILIZING CONSTRUCTION MANAGER AT RISK IN GREENSBORO, NORTH CAROLINA.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1 Chapter two ROAD TO DESIGN BUILD. 2 ROAD MAP  THE COST PLUS GUARANTEED MAXIMUM PRICE CONTRACT (GMP)  CM  PM  DB IS THE LATEST STAGE: NEW PERSPECTIVE.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Construction Management At Risk Process
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
BONDING & ACCESS TO CAPITAL SMALL CONTRACTORS INITIATIVE.
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
What to Expect Series Your First Meeting with a Professional Surety Bond Producer © Copyright 2016 NASBP.
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
Professional Relationships Important to Construction Firms The Value of Professional Surety Bond Producers © Copyright 2017 NASBP.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
Class #1 Contract Delivery Systems
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
Professional Relationships Important to Construction Firms The Value of Small Business Bankers © Copyright 2016 NASBP.
PROJECT DELIVERY METHODS
What Small and Emerging Contractors Need to Know Understanding Funds Administration © Copyright 2017 NASBP.
CHANGING PROJECT DELIVERY SYSTEMS
Project Delivery and Contract Strategies
Understanding Bonding Requirements
Alternative Project Delivery: Lessons Learned and Yet to be Learned
ENGINEERING MANAGEMENT (GE 404)
ENGINEERING MANAGEMENT (GE 404)
Project Delivery Systems
Nepal administrative staff college
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Farming Joint Ventures
MULTISPORTS CENTRE PRESENTATION
Construction Project Delivery Methods
Tips For Working With A General Contracting Company
Building Construction Delivery Systems
Presentation transcript:

What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP

Project Delivery Methods A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in various ways, one of which is the contractual arrangement(s) of the main project participants. This presentation focuses on an overview of the four common project delivery methods, with typical characteristics of each one. The contractual arrangement for each delivery method is illustrated. 2

Common Project Delivery Methods Design-Bid-Build (DBB) Design-Build (D-B) Construction Management at Risk (CMAR) Integrated Project Delivery (IPD) While these four are the most common, there are other project delivery methods and hybrids of these delivery methods, with characteristics of more than one method. There is no one “best” delivery method; there are advantages and disadvantages in using each method. Experience and expertise allows selection of the right delivery method for a particular project. 3

Design-Bid-Build Design-bid-build (DBB), known as the traditional method, is a project delivery method in which the owner contracts with separate entities for the design and the construction of a project. Two contracts are used to accomplish design and construction: (1) the owner-designer contract ,and (2) the owner-contractor contract. There are three sequential project phases to the design-bid-build method: Design phase Bid phase Construction phase 4

Design-Bid-Build (cont.) The owner hires a design professional to prepare the design and contract documents (plans and specifications). Then these documents are used for competitive bidding or negotiation with contractors. The owner executes a contract with the winning contractor, who is in charge of delivery of the completed contract. The contractor may subcontract some of the work to subcontractors. The contractor is responsible for the execution of the work under the contract. 5

Design-Bid-Build Owner Designer Contractor Subcontractor 6

Design-Build Design-build (D-B) is a project delivery method in which the agency or owner contracts with a single entity, known as the design-build entity, to complete both the design and construction services. A single contract, between the owner and the design-build entity, is used to accomplish design and construction. Design-build relies on a single point of responsibility and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and the construction phase of a project. 7

Design-Build (cont.) The firm will often be a design-build firm or a joint venture of a design firm and a construction firm for a specific project. The design–build firm hires the subcontractors. The Design-Build method enables fast-track delivery, in which construction can begin before design is completed. Owners often like the D-B method, as there is a single point of responsibility for both design and construction. 8

Design-Build Owner Design-Build Entity Subcontractor 9

Construction Management At-Risk Construction management at risk (CMAR) is a project delivery method in which the construction manager (CM at Risk) agrees to deliver the project within a defined schedule and price, either fixed or a guaranteed maximum price (GMP). The CM at Risk acts as consultant to the owner in the development and design phases and as a general contractor during the construction phase. The CM at Risk assumes all liability as the contractor. In addition to acting in the owner’s interest, the CM at Risk must manage and control construction costs to not exceed the GMP, which would be financially detrimental to the CMAR company. 10

CMAR (cont.) The construction management at risk method should be differentiated from the construction management-agency (CMa) method of project delivery. CMAR and CMa are often confused, but they are distinct delivery methods. CMa is characterized by a construction manager who is a true agent of the owner and acts on the owner’s behalf in the administration of the project. The construction manager-agent has no responsibility for the construction outcome of the project, as does the CM at Risk. 11

Construction Manager at Risk Construction Management at Risk Owner Designer Construction Manager at Risk Subcontractor 12

Integrated Project Delivery Integrated project delivery (IPD) is a project delivery method that fully integrates the project participants into a collaborative process that takes advantage of the knowledge and skills of all the participants to maximize the project results. A multi-party contract is signed by, at a minimum, the owner, the design professional, and the contractor. The key participants are involved from an early stage of design, with collaborative decision-making, to facilitate communication and increase profits. The project is jointly managed by the project team. IPD involves an alignment of interests of all the principle parties; risks and rewards are shared based on the project outcome. This delivery method is less common than the others and is most often used by experienced and sophisticated parties in the design and construction processes. 13

Integrated Project Delivery Owner Designer Contractor Consultants 14

suretylearn.org provides valuable resources and information on growing your small construction business and on positioning your business to qualify for surety credit.