Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
1 Solicitations/Advertisements Solicitations/Advertisements
Organization of Primary Entities
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Lessons Learned: CM at Risk & Design Build
Building Success Stories: A Survey of Construction Delivery Methods PRESENTED BY: BLAKE G. POWELL.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
Your Deliver Method... …Pick it Early
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Construction Engineering 221 Drawings and Specifications.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
THE ECONOMICS OF RE-CREATING EDUCATIONAL ENVIRONMENTS HOW TO ACHIEVE HIGH PERFORMANCE SCHOOLS.
Chief Legal Counsel, OSFC
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Contractor Alternate Design Serving the Public’s Best Interest.
You passed the Bond or secured some funds What do we do now? 2014.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Construction Management At Risk Process
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
CHANGING PROJECT DELIVERY SYSTEMS
Presented by NAVSEA, NSWC, for NAVSUP
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Lease-Leaseback Project Delivery Method
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Light Rail Transit Project
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
CM at Risk v. Design-Bid-Build
PROJECT DELIVERY METHODS
TRAVEL SERVICES Request for Proposal
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
CHANGING PROJECT DELIVERY SYSTEMS
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
CAPITAL PROGRAM OVERVIEW
How to Build a Great Team
Project Delivery Systems
The Best Decision by Design: Professional Services Selection
Design-Build Process Utilizing Negotiated Selection
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Procurement.
Design-Build Acquisition and Contract Incentives July 19, 2018
OCPS CCNA SELECTION COMMITTEE TRAINING
Design-Build Acquisition and Contract Incentives May 9, 2019
Presentation transcript:

What’s New in School Construction? Presented by: Jay Harris, John Brown, Luke Deets, Brian Johanning, Rob Pitkin Saturday, October 7th 3:40PM - 4:30PM

Brian Johanning, MBA, DBIA Jay Harris Rob Pitkin John Brown, AIA, DBIA Hollis + Miller Architects Luke Deets McCownGordon Construction Brian Johanning, MBA, DBIA Shafer, Kline & Warren Jay Harris Platte County School District Rob Pitkin Horn, Aylward and Bandy, LLC

4 approved methods of construction Design - Bid - Build (General Contractor (GC)) Construction Management “Agency” Construction Management “At Risk” Design-Build

Missouri Legislative Update 2017 2016 HB 2376 / Phase I Evaluation Points assigned in phase I of the evaluation process shall not carry forward to phase II of the process. All qualified design-builders shall be ranked on points given in phases II and III only.

Missouri Legislative Update 2017 2016 HB 2376 / Phase II Evaluation Up to twenty percent of the points awarded to each design-builder in phase II may be based on each design-builder's qualifications and ability to design, contract, and deliver the project on time and within the budget of the political subdivision; The submitted designs shall be evaluated and assigned points in accordance with the requirements of the request for proposal. Phase II shall account for not less than forty percent of the total point score as specified in the request for proposal.

Missouri Legislative Update 2017 2016 HB 2376 / Phase III Evaluation Phase III shall account for not less than forty percent of the total point score as specified in the request for proposal Cost proposals shall be evaluated in accordance with the requirements of the request for proposal. In evaluating the cost proposals, the lowest responsive bidder shall be awarded the total number of points assigned to be awarded in phase III. For all other bidders, cost points shall be calculated by reducing the maximum points available in phase III by one percent or more for each percentage point by which the bidder exceeds the lowest bid and the points assigned shall be added to the points assigned for phase II for each design-builder;

Missouri Legislative Update 2017 2016 HB 2376 / Threshold Definitions Civil works projects, such as roads, streets, bridges, utilities, water supply projects, water plants, wastewater plants, water distribution and wastewater conveyance facilities, airport runways and taxiways, storm drainage and flood control projects, or transit projects (b) Non-civil works projects, such as buildings, site improvements, and other structures, habitable or not, commonly designed by architects in excess of seven million dollars;

Missouri Legislative Update 2017 2016 HB 2376 3. A design criteria consultant shall be employed or retained by the political subdivision to assist in preparation of the request for proposal, perform periodic site visits, prepare progress reports, review and approve progress and final pay applications of the design-builder, review shop drawings and submissions, provide input in disputes, help interpret the construction documents, perform inspections upon substantial and final completion, assist in warranty inspections, and provide any other professional service assisting with the project administration. The design criteria consultant may also evaluate construction as to the adherence of the design criteria. The consultant shall be selected and its contract negotiated in compliance with sections 8.285 to 8.291 unless the consultant is a direct employee of the political subdivision.

Missouri Legislative Update 2017 2016 HB2376 / Stipend 15. As an inducement to qualified design-builders, the political subdivision shall pay a reasonable stipend, the amount of which shall be established in the request for proposal, to each prequalified design-builder whose proposal is responsive but not accepted. Such stipend shall be no less than one-half of one percent of the total project budget. Upon payment of the stipend to any unsuccessful design-builder, the political subdivision shall acquire a nonexclusive right to use the design submitted by the design-builder, and the design-builder shall have no further liability for the use of the design by the political subdivision in any manner. If the design-builder desires to retain all rights and interest in the design proposed, the design-builder shall forfeit the stipend.

Missouri Legislative Update 2017 2016 HB 2376 / Sunset 20. The authority to use design-build and design-build contracts provided under this section shall expire September 1, 2025

Missouri Legislative Update 2017 CM@Risk in HB 2376 Two step selection process: Step1: qualifications Step 2: additional information plus fees and general conditions Best Value selection Maximum 60% on price (no minimum), Public ‘Rip/Read’ Minimum 40% Quals Shall interview 2

Missouri Legislative Update 2017 CM@Risk in HB 2376 (Cont.) Threshold for use: $2m for civil works; $3m for all other projects CM@R may self-perform if it submits bids in same sealed proposal as other trades Sealed trade bids publicly opened

4 approved methods of Construction Design - Bid - Build CMa CMr Design-Build

1 General Contractor A system of contracting by which an architect prepares drawings, competitive bids are received and a construction contract is awarded. School District General Contractor Sub Design Team

ADVANTAGES: General Contractor 1 ADVANTAGES: General Contractor ✔ Generally a lower cost per square foot Most recognized delivery method Single point construction responsibility Allows more local GC’s to submit a bid Less monthly paperwork for the District

DISADVANTAGES: General Contractor 1 DISADVANTAGES: General Contractor ✗ No contractor design phase input Difficult to control who bids the work Subcontractors can be difficult More site observation required Could be more change orders

Construction Management “Agency” 3 Construction Management “Agency” A system involving the contractor (CM – Agency) during the program planning stage, under a separate contract from the architect, allowing for significant input on the project. School District Design Team Construction Manager Sub

ADVANTAGES: CM – Agency 3 ADVANTAGES: CM – Agency ✔ Qualification based selection CM is a member of the School District Team Bid packages allow for more local participation Generally better on follow-up issues

DISADVANTAGES: CM – Agency 3 DISADVANTAGES: CM – Agency ✗ Possible higher construction costs Large number of construction contracts (CM cannot self perform work) Potential “Scope Gaps” CM may not really be a Construction Manager

Construction Management “At Risk” 2 Construction Management “At Risk” School District Construction Manager Sub A system involving the contractor (CM – At Risk) during the program planning stage, under a separate contract from the architect, allowing for significant input on the project. Design Team

ADVANTAGES: CM – At Risk 2 ADVANTAGES: CM – At Risk ✔ Qualification based selection Early and frequent cost input from CM CM is a member of the School District Team Normally fewer change orders Fewer design/construction issues Value engineering early in the process

DISADVANTAGES: CM – At Risk 2 DISADVANTAGES: CM – At Risk ✗ Possible higher construction costs CM / AE roles must be well defined early in the project

Integrated Design-Build Team 4 Design-Build Owner Integrated Design-Build Team Design-Build drives the integration of design, engineering and construction processes. There is one contract for design and construction.

ADVANTAGES: Design-Build 4 ADVANTAGES: Design-Build ✔ Single point of responsibility Potential Cost Savings Earlier Project Completion Owner involvement Earlier Cost Visibility

DISADVANTAGES: Design-Build 4 DISADVANTAGES: Design-Build ✗ Need for earlier requirement definition Subcontractor Compliancy

Overall delivery comparison GC CMa CMr DB Qualifications based selection ✗ ✔ Provides preconstruction services Owner holds one construction contract Single source responsibility Allows for phased “Fast Tracking” Checks + Balances project approach Earliest known project pricing GC CMa CMr DB Qualifications based selection ✗ ✔ Provides preconstruction services Owner holds one construction contract Single source responsibility Allows for phased “Fast Tracking” Checks + Balances project approach Earliest known project pricing Subcontractor review process GC CMa CMr DB Qualifications based selection ✗ ✔ Provides preconstruction services Owner holds one construction contract Single source responsibility Allows for phased “Fast Tracking” Checks + Balances project approach Earliest known project pricing Subcontractor review process Single source for project bonding Stretches District dollars ✔✔ ✔✔✔ GC CMa CMr DB Qualifications based selection ✗ ✔ Provides preconstruction services Owner holds one construction contract Single source responsibility Allows for phased “Fast Tracking” Checks + Balances project approach GC CMa CMr DB Qualifications based selection ✗ ✔ Provides preconstruction services Owner holds one construction contract Single source responsibility Allows for phased “Fast Tracking” Checks + Balances project approach Earliest known project pricing Subcontractor review process Single source for project bonding GC CMa CMr DB Qualifications based selection ✗ ✔ Provides preconstruction services Owner holds one construction contract Single source responsibility GC CMa CMr DB Qualifications based selection ✗ ✔ GC CMa CMr DB Qualifications based selection ✗ ✔ Provides preconstruction services GC CMa CMr DB Qualifications based selection ✗ ✔ Provides preconstruction services Owner holds one construction contract GC CMa CMr DB GC CMa CMr DB Qualifications based selection ✗ ✔ Provides preconstruction services Owner holds one construction contract Single source responsibility Allows for phased “Fast Tracking”

Design-Build for Schools 250,000 SF High School 10 buildings Stadium seating, and other site developments Owner: Catholic Diocese of San Diego in Carmel Valley

Design-Build for Schools T. C. Williams High School Alexandria, VA LEED Gold: 3-Story 462,000 SF school + 143,000 SF garage DBIA National Winner 2009

Design-Build for Schools Episcopal High School Jacksonville, Florida 31,500 SF Design-Build Facility 650-Seat performing arts auditorium Offices, rehearsal rooms, set shop and professional stage

Design-Build for Schools Pleasant City Elementary School West Palm Beach, Florida 70,000 SF Design-Build 490-student elementary school Designed and constructed in 12 months

Panel Discussion

Thank You! Platte County R-3 School District 816.858.5420 www.plattecountyschooldistrict.com Horn, Alyward and Bandy, LLC 816. 421. 0700 www.hab-law.com Hollis + Miller Architects 816.442.7700 www.hollisandmiller.com McCownGordon Construction 816.960.1111 www.mccowngordon.com Shafer, Kline & Warren 816.756.0444 www.skw-inc.com