Project Overview and Introduction

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

27 September, 2004 GEO Special Session on Governance Analysis of Comments on Governance of GEOSS International Cooperation Subgroup Co-Chairs Patricio.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
SADC HPC Workshop, 2 Dec 2013, Cape Town
FOUNDATION TRUST STATUS. What is a Foundation Trust? It is an NHS organisation, first established in April 2004 Foundation Trusts operate according to.
Sustainable Energy Systems Int’l H 2 Safety Conf, Pisa, Italy, 8-10 Sep IPHE projects focus on pre-competitive collaborative research, development.
Enterprise and Industry A better functioning food supply chain in the EU? The interplay between the food industry and the primary production. Can the right.
The Lean Sourcing Process
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working Vale of Glamorgan Council Final Report- July 2008.
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Discussion Document By G How. History LeadershipStructureProcessesInformationEnvironment The path of Shared Services is littered with failed attempts.
The Iterative Process of Project Planning 13 Structure the project
Global Leaders World Forum Montreal May 16, 2005.
OECD Review of Russian Statistics Peer Review Mission to Russia April 2012 Tim Davis Head, Global Relations, Statistics Directorate.
Conformity Assessment and Accreditation Mike Peet Chief Executive Officer South African National Accreditation System.
International Comparison Program (ICP) Overview of 2003 Round Workshop Goals and Objectives Fred Vogel, Global Manager.
LOFAR AND AFRICA Daan du Toit DST – South Africa.
Review of Sub-National Economic Development and Regeneration.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
Deputy Assistant Secretary for International Affairs for Fossil Energy Justin “Judd” Swift – U.S. Department of Energy.
Square Kilometre Array 15 Aug Outline Radio astronomy across Africa African VLBI Network SKA countries coordination 2 1 SKA Organisation Timelines.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
Planning for Operations SKA Engineering Meeting 2015 Prof. Gary Davis 10 th November 2015.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
SKA: Update on SKA Governance Simon Berry, Director Policy Development 9 th November 2015.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
Head of Project Update Alistair McPherson November 2015.
The Square Kilometre Array Dr. Minh Huynh (International Centre for Radio Astronomy Research and SKA Program Development Office) Deputy International SKA.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Capacity for Health Impact Assessment Debbie Abrahams Director IMPACT+ West Midlands Public Health Observatory, Birmingham, 25 th June 2008.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Introduction to the OECD. 4 key questions Who are we? What do we do? How do we do it? What happens next?
HIA Capacity Building: comparisons and contrasts Debbie Abrahams, Director, International Health Impact Assessment Consortium, Public Health, 9 th International.
Chief Security Officers List
SKA Status – Tango Collaboration Meeting Lize van den Heever June 2016.
How RDA is growing? Total RDA Community Members: 2668.
Technical Business Consultancy Project
Office 365 Security Assessment Workshop
What is the Belmont Forum?
Improving the Garment Sector in Lao PDR:
Building the Square Kilometer Array – a truly global project
The road to accountable care
Development and Energy in Africa
SKA Regional Centre Coordination Group (SRCCG)
ASTERICS Kick-Off Meeting: SKA links and interaction
International Co-operation Concrete opportunities
PM view of SAFe SAFe Construction Planning Workshop A J Casson
Executive Committee Meeting April 2010
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Standards for success in city IT and construction projects
NE ATLANTIC GEOGRAPHICAL INTERCALIBRATION GROUP (NEA GIG)
Project Roles and Responsibilities
The Lean Sourcing Process
Presentation to the EPREV Lessons Learned Workshop
DRIVER Digital Repository Infrastructure Vision for European Research
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
Changing funding arrangements for physiotherapy education in England
Memorandum of Understanding
ESF IMPLEMENTATION IN MALTA
Employee engagement Delivery guide
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Panel II: Adequate capacity for absorbing financial assistance
A Framework for the Governance of Infrastructure - Getting Infrastructure Right - Jungmin Park, OECD Budgeting & Public Expenditures Division 2019 Annual.
CONVENTION ESTABLISHING THE SQUARE KILOMETRE ARRAY OBSERVATORY
UK Wide Working Mary Cubitt Programme Implementation Manager
Smart Campus Project Update
Strategic Management and
Strategic Management and
Presentation transcript:

Project Overview and Introduction SKA Town Hall Meeting Project Overview and Introduction Alistair McPherson 18th May 2017

Code of Conduct SKAO is committed to ensuring a meeting environment safe from bullying, intimidation, harassment, violence or discrimination. https://indico.skatelescope.org/event/402/page/8

Square Kilometre Array 3 sites; 2 telescopes + HQ 1 Observatory Design Phase: > €170M; 600 scientists+engineers Phase 1 Construction: 2019 – 2024 Construction cost cap: €674.1M (inflation-adjusted) Operations cost: under development (see below) MeerKat integrated Observatory Development Programme (€20M/year planned) SKA Regional centres out of scope of centrally-funded SKAO. Phase 2: start mid-2020s ~2000 dishes across 3500km of Southern Africa Major expansion of SKA1-Low across Western Australia

Technical Progress

SKA-LOW prototype antenna station deployed

MeerKAT

New SKA HQ building: work underway £16.5M investment Completion in June 2018

Future Governance

SKA Organisation: 10 countries, more to join Interested Countries: France Germany Japan Korea Malta Portugal Spain Switzerland USA Contacts: Mexico Brazil Ireland Russia Australia (DoI&S) Canada (NRC-HIA) China (MOST) India (DAE) Italy (INAF) Netherlands (NWO) New Zealand (MED) South Africa (DST) Sweden (Chalmers) UK (STFC)

Eventual scope In Scope Service Level Agreements Memorandum of Understanding

Governance/organisational structure IGO = ‘Convention’ agreed between governments Government commitment: Long-term political stability, funding stability A level of independence in structure Availability of ‘supporting processes’ through Privileges and Immunities from members: functional support for project ‘Freedom to operate’, specifically through procurement process, employment rules and so on

High-level IGO timeline Now to July: Finalising the Convention text and other ‘treaty-level’ documents High-level discussions on procurement principles, access etc Governments preparing to ‘initial’ the documents Discussions about initial phases of funding the IGO (not SKA1 construction…) ~July: Documents ‘initialled’ to mark end of negotiation process; governments prepare to sign the Convention Best guess – September: Signing event for negotiating governments – most sign in one go, others when ready Ratification of Convention by governments begins ‘Proto IGO Council’ starts work preparing for IGO – policies, the transition from the company etc

Cost Control Project

BD-22 Decision “The Board directs the SKA Office to commence a review of the existing telescope design, guided by a sub-committee of the Board, with a view to reducing construction and operational costs. Such a review will provide revised design options against the cost cap (€674m, 2016 €). In providing the options the SKA Office will:   Draw on the papers developing alternative options for SKA Mid (provided by RSA) and SKA Low (to be co-ordinated by Australia); Optimise the use of pre-cursor and pathfinder technology where it provides cost savings and/or reduces risk; Draw on cost reduction options already identified by consortia and the SKA Office; As far as possible, preserve the existing schedule and science goals; Allow for the expansion of the design as additional funding becomes available. The SKA Office will present preliminary recommendations at the March Board meeting.”

Process

Development of Scenarios Scenario 1 – Minimum Science Impact Scenario 2 – Partial Impact on Science Scenario 3 – Sequential saving to cost cap Scenario 4 – SA Paper plus minimum science impact on SKA-Low Scenario 5 – SA Paper plus maximum savings on SKA-Low Scenario 6 – deleted Scenario 7 – Minimum impact on current pre- construction schedule Scenario 8 – SKA-SA Paper and SKA-Low Paper

Minimum impact on scientific capability Recommendation – Further develop Scenarios 3 & 8 design space Minimum impact on scientific capability Moderate technical risk with mitigation Controlled schedule slip Includes ~16% contingency Most options can be re-instated if additional funding is available; exploits inherent scalability of interferometers Minimal changes to the baseline design

Summary of Board discussions Cost Control Project Following CUS and SEAC input, and other discussions, the SKA Office will further investigate a ‘design space’ which incorporates both Scenarios 3 and 8; with the aim of bringing to the Board a plan which would allow the Board to issue a resolution on cost reduction options to deliver SKA1 at the cost cap, with opex at or below target. If additional partners are secured, beyond those currently envisaged as Members of the SKA Observatory, then Council can elect to move back up the scenario, reinstating options and restoring scientific capability to match available funding. SKA Office, in consultation with CUS, will rapidly develop a plan to conduct the technical and scientific assessments identified. The plan to be approved at the Board Executive Committee on April 24th. ExCo has delegated authority to discharge the CUS, or to provide a revised charge if required.

Phase 2 - Design Space Scenario: Design Space: A group of options which, if selected, provides a defined design solution Design Space: A group of options which provides a space from which a scenario can be selected. When a scenario is selected, some options will be chosen and some discarded. Footer text

CCP Further Work SKA-Low Beamforming Resolution Team SSKA-Mid CBF review of improved design by CSP SKA-Low Antenna – evaluate potential alternatives SKA-Mid Frequency Reference and Timing – Review SKA-SA solution Data Capture Engine – Review SKA-SA option and compare with baseline solution SDP Execution Framework- Review SKA-SA execution framework against SKA-Mid requirements Science Assessments: • Impact on EoR/CD of changes to SKA1-Low maximum baseline length • Required timing accuracy to enable successful precision pulsar timing science • Impact of SKA-Low antenna design 8. Programmatic Assessment Footer text

Progress Board has set overall direction of work. Cost control options will be implemented at time of procurement, if no additional funding available Science Assessment Teams investigating specific questions – Robert’s talk – will provide advice RTs looking at specific engineering choices – will provide advice SEAC will see outputs, will provide advice Project (Consortia and/or Office) will generate ECPs as required Will go through standard change control process for decision by CCB D-G will be the final decision-maker on technical issues Board will be kept informed at each Board meeting. Members (or future Council) will be involved in setting final procurement policy.

Summary Overall progress is very positive: Technical progress moving well, dealing with challenges Precursors/pathfinders being delivered; delivering science Route to an IGO now appears firm HQ construction started Real money being spent now by governments, real commitment being made at political level Route to procurement moving ahead: Greater clarity on schedule will emerge soon Policy picture converging: working closely with Members on aligning central project thinking with national strategies SKA only possible through the drive, enthusiasm and support of the science and engineering community.