Pre-Bid/Proposal Meeting

Slides:



Advertisements
Similar presentations
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Advertisements

ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032 Date: 15 January 2013 Time: 11:00.
DBE ACHIEVEMENT Met Council PFA funded projects:
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004 Presenter: Anna Mosupyoe and Ravi Moodley Date: 24 January 2012 Time: 10:00.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session 06 August 2013 The Road Accident Fund.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
What Small Method Is It? Presented by Jan Giffin, CPPO, CPPB, VCO eVA Business Manager And Katherine Bosdell, CPPB, VCO Statewide Contract Officer.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
JEOPARDY FINANCIAL MANAGEMENT EDITION Documentation Procurement Mystery Cost Principles Administrative Requirements Q $100 Q $200 Q $300 Q $400 Q $500.
COMPULSORY BRIEFING SESSION Enterprise Wireless Solution (Wi-Fi) RAF /2015/00022 Date: 18 January 2016 Time: 11:00.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Procurement & Strategic Sourcing
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Procurement & Strategic Sourcing
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00034
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00028
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004
Offsite Storage RAF/2013/00023 Compulsory Briefing Session
REQUEST FOR PROPOSALS (“RFP”) CITY OF DANIA BEACH Bid No
After the FCC Form 471 E-rate Program Applicant Training
Award Management Services
Procurement & Strategic Sourcing Charter Bus Transportation Services
Memorandum of Understanding with GE Osmonics, Inc
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing (Law School Media Wall)
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session The Road Accident Fund 06 August 2013.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008
Procurement & Strategic Sourcing
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
CAPITAL PROGRAM OVERVIEW
CSP – Remodel Gate Services Building for USDA at Bayport Terminal
CSB Wharf 11/12 Collision Repair at Turning Basin Terminal – DC 1170
Request for Proposal and Specifications for
Request for Proposal and Specifications for
Drainage Improvements at VW Yard (RFQ-101)
Brenda C Trevino, P.E. PMP | Director, Technical & Business Analytics
Washington Metropolitan Area Transit Authority (WMATA)
CSP # 938 REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Bill Aguirre, P.E. | Project Manager | Project.
ApprenticeshipNC Regional Collaboration and Expansion Project
RFP-311 JDE Managed CNC Services
RFP – 1148 Disparity Study Services
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
How To Do Business With The RCSS
Learn about bidding the Facility Services Targeted Small Business Enterprise Tier 2 Program Welcome Confirm who is doing the speaking for each slide……
Construction Management Services April 16, 2018
PURCHASE OF MISCELLAEOUS PERSONAL SAFETY EQUIPMENT FOR BARBROURS CUT TERMINAL, BAYPORT CONTAINER TERMINAL, AND TURNING BASIN TERMINAL.
Diversity management system (DMS)
Organizer Preparation for on-site Execution
Presentation transcript:

Pre-Bid/Proposal Meeting Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 25, 2016

Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal Introductions Harris County – Wage Rate Compliance Small Business Procurement Selection Criteria Site Parameters – Special Conditions Questions All attendees must sign in

Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal PHA Personnel: Roger H. Hoh, P.E., - Director, Project & Construction Management Brock Lewis, P.E., - Chief Construction Manager Brenda C Trevino, P.E., PMP– Project Manager Pedro Gonzales, P.E., – Small Business Development Yvette Camel-Smith – Director of Procurement Harris County: Robert Rocha - Wage Rate Compliance Designer: Eva M. Gomez – Architect (KCI Technologies, Inc.)

Harris County Wage Rate Compliance and Requirements: Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal Harris County Wage Rate Compliance and Requirements: Attendance at pre-bid meetings and pre-construction meetings Review and approve weekly certified payroll records Monitor wage rate compliance Review claims of non-compliance from the field and recommend appreciate responses as required or permitted under the Wage Scale Act

Small Business Requirement: Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal Small Business Requirement: Small Business Participation for this project is a minimum of 15%. Prime Contractor must meet this hurdle to be considered for the job. Contact the Small Business Office, if you have difficulty in meeting the Small Business requirement. PHOTO OR GRAPHIC

Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal Procurement: Competitive Sealed Bids/Proposals (CSB/CSP) due November 16, 2016 no later than 11:00 A.M. One original and five copies packaged in one sealed envelope All proposals will be opened and ready publicly in the PHA First Floor Conference Room by Procurement Services – Wednesday, November 16th at 11:30 A.M.

Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal Due Wednesday, November 16, 2016 Competitive Sealed Bid / Proposal Response: Page 1 General Information PHOTO OR GRAPHIC

Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal Selection Criteria The Port Commission will award the contract to the responsible bidder submitting the lowest and best bid. Responsible: 1. Meet the applicable Small Business Participation requirements; 2. Have the ability to comply with the required delivery or performance schedule, taking into consideration other business commitments; 3. Have a satisfactory record of performance and integrity; 4. Have a satisfactory safety and environmental record; 5. Have satisfactory references; and 6. Have the necessary facilities, equipment, material, personnel, organization, experience, authorizations, technical skills, and financial resources to fulfill the terms of the contract for the project.

Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal Due Wednesday, November 16, 2016, no later than 11:00 A.M.: Competitive Sealed Bid / Proposal Response: Page 2 Required Attachments PHOTO OR GRAPHIC

HERE

Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal General Scope of Services: Coordination / scheduling with the Port Authority and its tenant is important Secure the workspace and keep it from weather intrusion during construction Remove and dispose of existing windows, framework and entrance doors; and install new Install window treatments Provide O&M / Warranty information and as-built drawings.

Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal General Scope of Services (continued):   Additional security will be provided by the Port Authority while the tenant is located in temporary space; Access to the Credentialing Office must be maintained during regular working hours; The project will be awarded in January 2017 and the work will begin after Super Bowl weekend; Proper PPE will be worn at all times; .

Replacement of Windows, Entrance Doors, and Framework at Credit Union at Executive Office at Turning Basin Terminal No photographs – leave cell phones in your pockets or purses! Stay with group Comply with your company’s safety policy!

QUESTIONS? Thank You & Questions