Organization and Goals for the Workshop

Slides:



Advertisements
Similar presentations
1 Terms of Reference for the GEO Executive Committee Note: These Terms of References were approved at GEO-6 Helen Wood, GEO Secretariat Director.
Advertisements

By: MSMZ. Objective After completing this chapter, you will be able to: Explain 2 contract review stage List the objective of each stage of the contract.
Session 321 An Implementation Strategy: Identifies who is responsible for which actions Identifies what funding mechanisms and other resources are available.
ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
G. Cosmo & M.G. Pia. The Training Kit Project Gabriele Cosmo & Maria Grazia Pia Geant4 Workshop Paris, October 2000
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Software Configuration Management
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
Executive Board Meeting Roy Preece 23rd May 2014
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Software Quality Assurance
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Strengthening Partnerships: Shaping the Future Portland, OR June 6 th – 10 th, 2004 Planning for Success Implementing the California EDRS.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
MICE CMPB Alain Blondel 1 Highlights on MICE.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
Predrag Buncic CERN Future of the Offline. Data Preparation Group.
LHCbComputing Personnel status Preparation of discussion at next CB.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
1 May 10, 2007 Detector group organization For the CDR writing we had identified subsystem editors/conveners  This structure has concluded its function.
For discussion… Adachi. Horizontal effort Horizontal effort: one example – All of the proposed barrel PID detector use quartz bar radiator – Possible.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
QCG Report Francesco Forti University and INFN, Pisa.
Workshop Structure-Detector Agenda structure similar to last two meetings –Two subsystem parallel sessions today and tomorrow –ETD, DGWG, Simulation Parallel.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
XV SuperB General Meeting Caltech Dicember , 2010 SuperB Today M.A.Giorgi INFN & Universita’ di Pisa.
Detector Goals and General Syst. System Parallel Joint Parallel DGWG Mechanical Integ. TDR Organization System Summaries WORKSHOP Structure-Detector +
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
JRA1/Job Submission and Monitoring
Agenda items TEB activities at KILC TDR SVN repository roll-out
4th Assessment of Progress Against the GEOSS 2015 Strategic Targets
EGEE Middleware Activities Overview
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Physics Analysis Summaries towards a proposal
WP8 – Improvement and equipment of irradiation beam lines
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
Workshop Goals for the Detector Groups
Proposal of Geant4 Physics Book
Preparations for the SiD Workshop at Fermilab, April 9-11
Summary/Conclusions of the SuperB PID Sessions.
SuperB EMC Computing Foreseen activities and software/computing needs
S4 will be a “big” Collaboration:
Close out M.A.Giorgi INFN & Universita’ di Pisa
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Francesco Forti University and INFN, Pisa
State Aid Construction
Eurostat D2 – Regional Indicators and Geographical Information
Preparations for a Lehman Review
Large International Collaborations
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Mark McKinnon EVLA Project Manager
SVT – SuperB Workshop – Frascati Sept. 2010
Preliminary Project Execution Plan
Perugia SuperB Workshop June 16-19, 2009
State Aid Construction
Detector Proto-Technical board Sep 30, 2010
Marcello A. Giorgi Università di Pisa & INFN Pisa
Presentation transcript:

Organization and Goals for the Workshop Sessions Monday morning: full parallelism among subsystems afternoon: MDI, Electronics/Geometry group Tuesday morning: plenary afternoon: Computing, Physics Wednesday morning: organization, plenary afternoon: Proto Tech Board

TDR planning Intermediate document (Technical Proposal) foreseen end of 2009 Sufficient detail for approval Definition of as many options as possible Preliminary budget and schedule Technical Design Report foreseen in second half of 2010. Full technical detail (blueprint for constrution) Baseline budget and schedule No (or very very few) options open Good for a full technical review

Detector organization NOTE: This is only from now to the TDR, it will change for construction. Construction responsibility will have to be defined when the collaboration is fully formed We have the subsystem conveners and a technical coordinator Need to define chief mechanical and electrical engineer Start to define tasks and structure at a finer level Formal structure in the subsystems Identify institutions/people responsible for certain tasks Identify system engineers Identify explicitly activities that need to be carried through for the TDR preparation Budget Schedule WBS - Project

Project management Need to move into a serious project management structure Plan the work to be performed Define required manpower and M&S (material and services) funds List available manpower (from institution or lab). Try to recruit the missing manpower Enthusiastic support from new institutions / people Hiring Fix a schedule, milestones Setup a reporting structure It doesn’t happen overnight, we need all to collaborate It has to be a useful tool, not a bureaucratic complication Properly account for the work done by institutions/people Allow justification of requests for funding manpower

The carrot The SuperB project has funds For the detector this funds will help mainly through: Technical contracts Specific expertise and specific tasks. Typically engineers at high level. Postdoc program Possibility of funding and/or cofunding postdoc positions at italian institutions if associated with specific tasks recognized by the subsystems Focused R&D co-funding program Possibility of co-funding essential R&D required to arrive at the TDR. It could be R&D happening not in Italy if proper co-funding programs are setup with other agencies Need to prepare a detailed plan. Approximate time scale: end of March.

Workshop goals Clarify and document what is needed to arrive at the TDR Geometry decisions (help from geometry task force): forward PID, backward calorimeter, … Architectural decisions: electronics, trigger, DAQ. Detector technology decisions Make a plan on how to move forward Make a plan on how to involve more institutions and people

Detector Organization II The time is ripe for a Proto Technical Board to start operating Technical coordinator (chair) System conveners Computing coordinator + other computing essential persons, to be defined First meeting on wed afternoon Regular phone meetings in the future (monthly ?) Probably will also define a detector management group

Tools We have/need a number of collaborative tools Web, mailing lists, wiki, document repository, meeting manager, code repository Some are OK, some are less OK Need to bring them rapidly into production mode In collaboration with computing people Important recent manpower addition Phone / video conferences We currently use two systems: Aethra, INFN Mixed experience. Aethra is also very expensive Need to evolve into more flexible and complete system (EVO?) We will also need to adopt modern project managent tools As they become useful / necessary For now MS excel/project are probably adequate