CC LLRF SM18 test plan and BA6 infrastructure

Slides:



Advertisements
Similar presentations
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Advertisements

LINAC 4 – LLRF ELECTRONICS UPDATE BCC-42 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), D. Stellfeld,
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
RF Commissioning Andy Butterworth BE/RF Thanks to: J. Tuckmantel, T. Linnecar, E. Montesinos, J. Molendijk, O. Brunner, P. Baudrenghien, L. Arnaudon, P.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Jan 30, 2008MAC meeting1 Linac4 Low Level RF P. Baudrenghien with help from J. Molendijk CERN AB-RF.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
HIE-ISOLDE Project Status Report
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
ELENA installation progress F. Butin / ELENA collaboration.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
Report Technical Director Storage-Ring-Installation Completed
Cost Optimization Models for SRF Linacs
Crab Cavity Technical Coordination meeting:
RF cell Anders Sunesson RF group leader
SM18 RF M7 Bunker Project Status 14th July 2017
Plans towards CC in the LHC a US – centric perspective
Framework Schedule from EYETS 2016 to LS2
Linac 4 Faraday cage P. Baudrenghien , D. Stellfeld BE/RF
Controls & software Andy Butterworth.
Schedule CM SPS G.Vandoni.
LIU – SPS Low level RF Updates and schedule G. Hagmann,
BA6 – crab cavity activities in EYETS
P. Charrue on behalf of AB/CO/IN
LHC-RF activities in LHC PT 4 TS2 YETS LS2
CV PVSS project architecture
LHC RF Embedded SC Cavity Conditioning System
LLRF systems status update
on behalf of the RF group
SPS cryogenic proximity equipment and SM18 validation
Infrastructure inventory and use
Update on HW commissioning
EN 4946 – Refurbishment of Electrical Substations
The ELENA BPM System. Status and Plans.
Me, FESA classes, Testing
Hollow e- lens, Cryogenic aspects
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
352MHz Klystron Control for the 3MeV Linac test stand
SPS CC: Final plan for interlocking of crab cavities in SPS
Linac4 RF System Operation for the Reliability Run in 2017
SRF Section Cuvée 2014.
HIE-ISOLDE Project Status Report
ACS news Circulator TCU: control tests in progress All cavity racks
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
LLRF and Beam-based Longitudinal Feedback Readiness
Report on HIE-ISOLDE Status
LHC Fast Timing Commissioning
Upgraded Injector Test Facility
Presentation transcript:

CC LLRF SM18 test plan and BA6 infrastructure P. Baudrenghien, J. Bento, B. Kremel, J. Simonin, N. Stapley, BE-RF on behalf of WP 4 Crab Cavity Technical Coordination: meeting XXVI, May 8th, 2017

Outline SPS CC LLRF electronics Lab tests SM18 tests Calendar SPS Infrastructure (Faraday Cage)

SPS CC LLRF electronics (1/2) We use the VME platform first introduced in the LHC LLRF (2007), also used in HIE-Isolde (2015), Linac4 (2016) and some SPS upgrades (2014-2017) We have adapted electronics designed for Linac4 (352.2 MHz RF) for operation at 400.8 MHz The system contains 1 crate with five modules per cavity

SPS CC LLRF electronics (2/2) Hardware (B. Kremel) Clock Gen module ready (2 PCs) Tuner module ready (1 PC) CavLoop modules (field regulation) being adapted for 400.8 MHz Firmware (B. Kremel, J. Simonin) Tuner module ready CavLoop under development Software (N. Stapley) Fesa class for tuner module under development Fesa class for CavLoop not started yet

Lab test A test bench is being prepared in the 864 Lab The tuner is “modeled” by phase-shifter The cavity is modeled in firmware First test is to validate the tuner (software/firmware/hardware) before SM18 test. Now-> mid June.

SM18 tests Our goal is to commission the system as it will be in the machine: FESA, SPS timing, Reference-driven mode, QL=106. Difference is the reduced power (no tetrode) and different cryostat. We will use the vertical cryostat to test the LLRF on the DQW equipped with a mockup tuner. Due to power limitations in SM18, 𝑄𝐿=106 (vs. 5×105 in the machine), with reduced field, using an 100 W amplifier (vs. 50 kW in the machine). Still 10 dBm at Ant. OK First commissioning of the tuning loop, starting mid-June 2017, when cavity returns from Japan. To be finished in 1-2 months (cryo shutdown) Commissioning of the field regulation (including RF feedback), starting Oct after cryo shutdown. The CavLoop module allows for both Self-Excited Loop (SEL) and Reference-Driven mode as intended in the machine.

Tuner test in the lab. Now->Mid June Calendar to-day – Dec 2017 Tuner test in the lab. Now->Mid June SM18 tests (vertical cryostat) Mid June- Mid Aug Setting-up the Tuner Loop Start setting-up the RF feedback SM18 cryo shutdown Mid Aug- End Sept Resume SM18 tests (vertical cryostat) Oct-Dec Complete the setting-up of the RF feedback

Faraday Cage (1/2)

Faraday Cage (2/2)

Technical spec completed (EDMS 00001750664) Technical spec completed (EDMS 00001750664). Waiting for OK from Safety (promised for…today) Commercial documents under preparation. Should be sent by end May 5 bidders selected. We know them…

Calendar for the cage contractor: The “bare” cage should be finished end Oct. 2017 Then rest of installation is done by CERN services Connect cables to patch panel, cabling inside cage Electrical distribution to racks inside Cooling-Ventilation (AC) False floor, installation of racks Networks and Wifi …… Then we install the LLRF VME crates (same as tested in SM18), deploy the software and…test for real….(SPS restart 2018).