Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
Advertisements

WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Model Validation in Western Interconnection
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
January TSS J. Gronquist, S. Kincic
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
NERC Lessons Learned Summary
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
Review of BPA Voltage Control Conference
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
November 16, 2012 Synchrophasor Meeting Dynamic Model Validation Project Jonathan Rose Engineer, Resource Integration Sidharth Rajagopalan Engineer, Dynamic.
JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Slaven Kincic MVWG March System Model Validation Task Force (SMVTF) System Events for System Model Validation o 21th January event:  Colstrip.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
PS ERC EC Meeting Systems Stem New Research Initiatives.
| Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. EDT / 11:00.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
PowerWorld Case Validation
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
Visibility Ramu Ramanathan 10/1/2007.
Nick Hatton Associate Staff Engineer
The Model Validation Story
Progress Report for the May 26th 17:31 Event
WECC Regional Standards Update
Philip Augustin TSS Chair
Slaven Kincic SMVTF Progress Report
Eleanor Ewry Base Case Coordination Subgroup Chair
Updates to the Path Rating Process for Approval by the PCC
Grid Integration of Intermittent Resources
Long-term Planning and TPL TP Workshop November 2, 2017
Reactive Power and Voltage Control
Phil O’Donnell, Manager Operations and Planning Audits
NERC Update: Current Activities Ryan Quint, Ph.D., P.E.
Merrill Brimhall – Engineer, Staff
Project WECC-0100 Update Load Modeling Task Force
Planning Tools Overview
Proposed Energy Imbalance Market The Basics
Modification of MOD-010 through MOD-015
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Electric Power Group Presents Maximizing Use of Synchrophasor Technology for Everyday Tasks Welcome! The meeting will begin at 2:00 p.m. EDT / 11:00.
Base Case Build Process
CMPLDWG Composite Model with Distributed Generation Approval
Jonathan young ColumbiaGrid
WECC Short Circuit Analysis
Andrew Christensen, SDWG Chair
WECC Short Circuit Analysis
Joe Seabrook Puget Sound Energy, Inc.
2018 State of the Interconnection Overview
System Review Work Group
2017 WECC JSIS Report March 21, 2017.
Base Case Build Process
Planning Tools Overview
Reliability Assurance Initiative (RAI) 101
Scenario Development Subcommittee January 4, 2018
CMPLDWG Composite Model with Distributed Generation Approval
Phil O’Donnell, Manager Operations and Planning Audits
Donald Davies Chief Senior Engineer
Project WECC-0100 Update Load Modeling Task Force
SRWG Meeting 15-2 Power Plant Validation Tools
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
Joe Seabrook Puget Sound Energy, Inc.
2018 CG MOD 33 updates CG Planning Meeting June 7, 2018
Presentation transcript:

Western Electricity Coordinating Council MOD-033 Discussion Kent Bolton Western Electricity Coordinating Council

Western Electricity Coordinating Council MOD-033 Steady-State and Dynamic System Model Validation Building of Planning Models to Analyze the Reliability of the Interconnected Transmission System Western Electricity Coordinating Council

Western Electricity Coordinating Council Model Validation Focus not on Interconnection-wide phenomena but on PCs portion of the existing system. Dynamic local event – produces some measurable transient response Western Electricity Coordinating Council

Standard Requirements Comparison of PCs system to Power Flow model Comparison of PCs system in Planning Dynamic Model to actual system response Western Electricity Coordinating Council

Western Electricity Coordinating Council MVWG Guideline MOD-033 Guideline References NERC MWG “Procedures for Validation of Powerflow and Dynamics Cases” Western Electricity Coordinating Council

Western Electricity Coordinating Council Event Selection Useful disturbances for study produce significant level of MW and MVAr variation. MVWG TF proposed to evaluate disturbances Western Electricity Coordinating Council

Western Electricity Coordinating Council Steady State Data Obtain state estimator (or SCADA and PMU) data – prior to and following event Select WECC Op case that matches actual system conditions as closely as possible Modify w/gen dispatch, topology and load changes Compare parameters: Bus voltages, MW & MVAr on elements and paths, gen dispatch, PS settings Proposal: distribution of updated model to PCs for 3 weeks Western Electricity Coordinating Council

Western Electricity Coordinating Council Dynamics Data Start w/associated dynamics file Adjust governor parameters within reason, add gen models to allow clean dynamic initialization No-disturbance should be flat, ringdown should be damped, etc. Western Electricity Coordinating Council

Western Electricity Coordinating Council Comparison Comprehensive detailed switching sequence necessary (source?????) Run simulation and compare to actual system results. Can include V, MW & MVAr flows, generator behavior, etc. (review MWG document) Western Electricity Coordinating Council