2016 RTP Update June, 2016 RPG Meeting.

Slides:



Advertisements
Similar presentations
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Regional Planning Group Project
April 16, 2010 Regional Planning Group RMR Exit for Spencer 5 – Remedial Action Plans Chris Ngai Jay Teixeira.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
2015 RTP Update January, 2015.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Outage Coordination Overview D.W. Rickerson ERCOT Outage Supervisor 12/1/2008.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
ERCOT PUBLIC 10/21/ RTP Update October 21, 2014.
ERCOT PUBLIC 10/21/ RTP Scope and Process Review October 21, 2014.
ERCOT PUBLIC 10/21/ LTSA Update October 21, 2014.
ERCOT PUBLIC 5/20/ RTP July 22, ERCOT PUBLIC 5/20/ Outline  Updates to 2014 RTP  RTP Next steps.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Rocky Mountain Power Five Year Study Kick Off Meeting.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
ERCOT PUBLIC 4/22/ RTP Inputs and Assumptions April 22, 2014.
TPIT using Model On Demand Jay Teixeira Manager Model Administration Regional Planning Group 5/21/13.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
CREZ - Voltage Profiles on Series Compensated Lines Prepared by Paul Hassink with AEPSC ERCOT RPG, 11/11/11.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Jeff Billo Manager, Transmission Planning
OPSTF – Issue 7 Long-term unavailability of autotransformers.
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
N-1-1 Contingency Analysis & Relay Protection 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
ERCOT Transmission Planning Overview
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Nodal Planning Go Live Austin, TX February 3, 2011
ERCOT – LP&L Study Status Update
Freeport Area Master Plan Project -
Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2011 Five-Year Transmission Plan Update
RMR Exit for Spencer 5 – Remedial Action Plans
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Local Area Planning Update – TRANSAC
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Student Center A South: Inaccessible Element
Presentation transcript:

2016 RTP Update June, 2016 RPG Meeting

Agenda Status update Preliminary reliability projects of 2016 RTP Next steps

2016 RTP status update Initial start cases posted on MIS Secure on March 8 2016 Single-event (N-1) secure cases with reliability projects posted on MIS Secure on April 11 2016 Currently in progress TSP review of reliability projects P3 (G1+N1) and P6.2 (X1+N1) reliability projects and updated reliability case posting Sensitivity analysis case preparation Short circuit study initial case preparation Economic start case preparation

RTP upgrades summary by voltage level (preliminary findings) 69 kV 138 kV 345 kV Grand Total Line addition 2 6 1 9 Line upgrade 3 19 - 22 Reactor/Capacitor addition 8 Transformer addition 5 Transformer upgrade Other** 4 38 10 56 Equipment upgrades and additions identified in 2016 RTP **Other: Terminal equipment upgrades and substation additions 69 kV 138 kV 345 kV Grand Total Line addition 1 - 2 Line upgrade 6 7 Reactor/Capacitor addition 3 Transformer addition Terminal upgrade 4 10 14 New* upgrades and additions identified in 2016 RTP *Not found in MOD or previous RTPs

List of new 138 kV upgrades identified in 2016 RTP RTP Project ID Project Name County Year needed North Central Terrell North – Terrell Switch upgrade Kaufman 2018* Kaufman Northwest – Rose Hill upgrade 2019 Grape vine ball street – Grape vine junction upgrade Tarrant 2021* Far West New ‘Wicket to Permian Basin’ line Reeves/Ward South Central Wells Branch to Howard tap upgrade Travis 2022 South South McAllen – Bensten terminal upgrade Hidalgo Coast New switched shunt at Jones Creek Brazoria New switched shunt at Velasco Bunker area line upgrades Harris *This table indicates the study year when the reliability needs were identified, it is possible that the need exists in the prior year. TSPs are encouraged to validate the need in the prior years as part of their project study.

Next steps Other Reliability Studies Case conditioning Sensitivity analysis Short circuit study Long-lead time equipment study Initial start cases, and contingency list ready Multiple element outage and cascading analyses 2016 RTP Report Set 1 (P1, P7), Set 2 (P2, P4, P5) contingency analysis for the base cases Economic case preparation and analysis Set 3 (P3: G-1+N-1, part of P6: X-1+N-1) contingency analysis for the base cases Blue box: complete Yellow box: in progress

Question ?