The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
Critical Current Probe Mid-Point Review Amy Eckerle Andrew Whittington Philip Witherspoon Team 16 NHMFL Applied Superconductivity Center 1.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
COMPUTER PARTS.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
CUORE LNGS Review, November 2008Karsten Heeger, Univ. Wisconsin 1 Calibration Slides for the CUORE Review at LNGS.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
PSI - February 3, 20031F. Sergiampietri MEG – PMT cryogenic test: PURPOSES -SYSTEMATIC TEST OF THE PMT’s FOR MEG IN OPERATING CONDITIONS -BUILD AN EVOLUTIVE.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Flange Plates to be Welded to Beam Flanges.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
PANDA, GSI, Electrically Cooled Ge-Detectors development Status Report I. Kojouharov.
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
Mechanical and cryogenic configurations
Control System and Automatic Sequences
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
MQXC Nb-Ti 120mm 120T/m 2m models
Coaxial Cable Copper-BASED SYSTEM Module 6
Design of the Injection Can
HFM Test Station Main Cryostat
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 10th May 2017
Cryostat design Mechanical design: Thermal screens: Specifications:
Teleconference ACS – FREIA 17th October 2017
LARP Vertical Test Facility
Teleconference ACS – FREIA 31st October 2017
(vertical cryostat, Gersemi)
Cryostat design Mechanical design: Thermal screens: Specifications:
Status of the PANDA Solenoid Magnet Production in BINP
Designing Assembly for MET
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Teleconference ACS – FREIA 20th February 2018
Home You can view all Flo Fab rep order that been sold so you can easily get end user feedback Call factory for password.
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Vertical Cryostat Kick-off metting
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
Installation Binder / IRR – an example
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Prototype cryomodule development
PANDA The conceptual design of the control Dewar
Double-Spoke Cavities
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Budker Institute of Nuclear Physics,
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
(vertical cryostat, Gersemi)
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
SNS PPU Cryomodule Instrumentation
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Teleconf ACS – FREIA 13th March 2017 Agenda: - Magnet insert mechanical studies, - Liquid insert manufacturing, - Control and command (electrical equipments, cabling, sequences,  ...), - Simulator for testing the valve box, - Tests for the commissioning at Lery and Uppsala - Planning

Magnet insert Last meeting et Lery, 27th February 2017 The magnetic insert has been modified to add an oval hole in the center of the top plate and the lambda plate. The components on the lambda-plate have been reviewed.  CD started the study of the manufacturing drawings The design of the heat exchanger Lambda HX683 (Copper heat exchanger) has been validated.  CD makes quotation request for the manufacturing A lifting tool is required to move and installed insert in the vertical cryostat.  Responsibility for design and manufacture of this tool must be clarified by UU.

Liquid insert Last meeting et Lery, 27th February 2017 The manufacturing started This week all components will be welded on the top flange. The planning manufacturing of the thermal shields and the date of the end of the manufacturing are not clear.  ACS will ask more explanations at CD

Control and Command ISII-Tech and TechNergie sent us a new version of the of the electrical components implantation in the electrical cabinet. 5 Cernox CABTF (instead of 4) 7 AMI level controller (instead of 4) ISII-Tech and TechNergie must send us a proposition about the cryostat cabling (valve Box, Cryostat and the inserts) including: The description of the equipement (connection box for the inserts), Kinds of cables and connectors Electrical schemes List of the I/O components ACS sent a new version of the control sequences.

Simulator box Cryogenic scheme and mechanical design made by ACS ACS will make the mechanical drawings to save time, CD must send us a quotation for the manufacturing