LUCASZ Plant Design File

Slides:



Advertisements
Similar presentations
SI-K / PHO Seage Plant Val de Ruz Sewage Treatment Plant Val de Ruz / Switzerland General informations about the plant : Setting - up in Nov.
Advertisements

The development of the head box automated control system of the educational- experimental plant at pulp and paper production Vitalii Rezatdinov.
2G BBULBE PASS Instructions-4 Replacement of bubble generator.
Piping and Instrument Diagrams
HEIS INSTALLATION PROCESS 1. DEMARCATION IN FIELD 2.
Read the numbers out loud and draw a line to join them
MEHRAS Consulting Co. Shipbuilding Department Address: No: 1201 to 1204, 12th Floor B-Tower, Payetakht Computer Complex, Mirdamad Boulevard, Valiasr St,
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
The Quiet Revolution in Building Design and Construction: BIM.
Bulk flow—Pressure difference Plant Physiology UNI 2009.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Assembly Reports.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
Given a P&ID, demonstrate an understanding of naming conventions by deciphering drawing numbers with 90% accuracy – Given a list of drawing numbers, identify.
AP210: Electrical/Electronics PCA Design Information Physical Component Placement Bare Board Geometry Layout items Layers non-planar, conductive & non-conductive.
JLAB CLAS12 Torus Structure The cold mass is composed of 6 coils, each inside a coil case, joined together at the inner radius by a hub and at the outer.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Инвестиционный паспорт Муниципального образования «Целинский район»
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Assembly Features.
CB200 Conventional Control Panels
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
2G BBULBE PASS Instructions-5 Replacement of Heater.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
CB200 e Cabinet Extinguishant Control Panels Designed for cabinet extinguishant systems 2 zone extinguishant co-incidence operation Selectable discharge.
1 July 13, 2011 Some morning photos Tank Valve Box.
Compressor Replacement – ODU
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
Kapton module ass. Spacers for pins 3.6 m m 1.25 mm.
INSTALLATION DETAILS. Installation Details for Code Compliance Must be installed per manufacturer’s instructions Architects can provide construction details.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
Date of download: 6/22/2016 Copyright © ASME. All rights reserved. From: Investigation of Heat Transfer in Evaporator of Microchannel Loop Heat Pipe J.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Internship final report Joanna Staniszewska Cracow University of Technology –
Date of download: 10/3/2017 Copyright © ASME. All rights reserved.
Feedback on transfer line sizing and flow calculations for UT
Test beam straw prototype production status
TRACI V3 Sheffield & Milano Commissioning Status
IT-4189 Supply and installation of a cryogenic distribution system
PANDA Yoke of the Magnet
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Pixel upgrade CO2 cooling plants – 3D modelling
Flexible lines assembly
DT & RPC Grounding STATUS
(vertical cryostat, Gersemi)
VELO Thermal Control System
Update on Junction Box Design
Update on Junction Box Design
'. \s\s I. '.. '... · \ \ \,, I.
THERMAL MANAGEMENT (COOLING) OF THE CBM SILICON TRACKING SYSTEM
GLAST Large Area Telescope:
Test #3; Symbology; Process Diagrams – Part 1 - Agenda
پروفیل طولی یا نیمرخ طولی (Longitudinal Profile)
KEK injector cryomodule
VELO Thermal Control System
!'!!. = pt >pt > \ ___,..___,..
' '· \ ·' ,,,,

Valve stem “gag” mechanism
Incoming inspection of the cavities at saclay
How to Copy and Share a Document.
EXP file structure.
Understanding the community – Tree Map
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

LUCASZ Plant Design File Assembly Structure and drawing references for Master Local Box D. Giakoumi 19.07.2016 Doc location G:\Departments\PH\Groups\DT\PO\Cooling activities\PROJECTS\LUCASZ\DRAWINGS\Design documents

Naming convention MLB= Master Local Box SLB= Slave Local Box MFB= Master Foam Box (same as SFB= Master Foam Box (same as MFB, not used) MPA= Master Piping Assembly SPA= Slave piping Assembly MFA= Master Frame Assembly SFA= Slave Frame Assembly (same as MFA, not used)

LUCASZ Master Local Box Assembly tree LUCASZ_VIX_MFA [ST0761935_01] LUCASZ_VIX_MFB [ST0764479_01] LUCASZ_VIX_MPA [ST0780535_02] CMSTKCOX0413

Piping assembly LUCASZ_VIX_MPA [ST0780535_02] CMSTKCOX0413 SS-4-VCR-9 LUCASZ_VIX_LS04 [ST0770298_02] CMSTKCOX0421 LUCASZ_VIX_MPA Exp liq sup [ST0782053_02] CMSTKCOX0420 LUCASZ_VIX_MPA_carel valve ass [ST0723786_02] CMSTKCOX0421 LUCASZ_VIX_MPA_HE ass [ST0770208_02] CMSTKCOX0417 LUCASZ_VIX_VR01 [ST0761408_02] CMSTKCOX0423 LUCASZ_VIX_MPA_Exp vap ret [ST0782106_02] CMSTKCOX0424 LUCASZ_VIX_LS01 [ST0761406_03] CMSTKCOX0425 LUCASZ_VIX_LS05 [ST0765703_02] CMSTKCOX0426 LUCASZ_VIX_VR03 [ST0766031_02] CMSTKCOX0427 LUCASZ_VIX_MPA_Vacuum conn [ST0782120_02] CMSTKCOX0428 LUCASZ_VIX_MPA_Vacuum pipe ass [ST0782117_02] CMSTKCOX0429 RHM03-TA-P1-PM0 [ST0774824_01] LUCASZ_VIX_MPA_LS02 ass [ST0781935_02] CMSTKCOX0430 PT TT LUCASZ_VIX_VR02 [ST0761403_02] CMSTKCOX0431 Rotarex LUCASZ_VIX_VC01 [ST0765944_01] CMSTKCOX0433 LUCASZ_VIX_VC02 [ST0761407_02] CMSTKCOX0432 VC Accumulator ass [ST0761640_02] No plant yet TT 6LV-4-WVCR-T-FFF [ST0765533_01] PPTX5072-TC-A2-CA-H0-RF VCR1/4 [ST0774692_01] LUCASZ_VIX_LS02 [ST0761402_02] CMSTKCOX0434 LUCASZ_VIX_LS03 [ST0761400_02] CMSTKCOX0435 Carel Valve ASS [ST0723786_02] CMSTKCOX0422 SS-4-VCR-9 [ST0762450_01]

Frame Assembly 3x 3x 6x LUCASZ_VIX_MFA [ST0761935_01] LUCASZ_VIX_MFA_Backplate ass [ST0783386_01] LUCASZ_VIX_MFA_Frontplate [ST0762203_02] CMSTKCOX0437 LUCASZ_VIX_MFA_Terminal ass [ST0762320_02] CMSTKCOX439 LUCASZ_VIX_MFA_VacuumTerminal ass [ST0762938_02] CMSTKCOX440 LUCASZ_VIX_MFA_Frame [ST0782044_02] CMSTKCOX438 3x 6x LUCASZ_VIX_MFA_Backplate [ST0761934_02] CMSTKCOX436 MLB Accumulator support [ST0765419_02] CMSTKCOX442 MLB Valve support [ST0762911_02] CMSTKCOX444 3x BOSCH PROFILE 20X20X165 [ST0765064_01] 6 x BOSCH PROFILE Joining plate [ST0783357_01] CMSTKCOX445 Terminal plate Out for construction Vacuum Terminal Mounting Plate [ST0762946_02] CMSTKCOX440 SS-4-VCR-61 [ST0726505_01] SS-602-61F [ST0759917_01]

Master Foam Box LUCASZ_VIX_MFB [ST0764449_01] LUCASZ_VIX_MFB_back plate ass [ST0783203_01] LUCASZ_VIX_MFB_front plate ass [ST0782786_01] LUCASZ_WX_MFB_armaflex ass [ST0783206_01] Foambox backplate [ST0783203_01]