Aerial of the full site facing northeast taken on March 1, 2016.

Slides:



Advertisements
Similar presentations
Facilities Modernization Program Funded by Measure B Project Report December 17, 2012.
Advertisements

DPRI HOSPITAL & CLINIC BRIEF Executive Summary DECEMBER 2007.
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT September 16 th, 2013 – October 25 th, 2013.
Project Overview Mission Introduction of J/V project team Project Overview Location and Site Goals for today AGENDA.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Hospital of the Future Construction Update as of Dec. 3, 2010.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Design Review Planning to date Project scope summary
V West Coast District Health Board New Grey Hospital and Integrated Family Health Centre: Public Briefing Meeting 11 December 2014.
January 6. January 7 January 8 January 9 January 10.
Electric Ductbank Project – Completed January 2010 New Brick Paver Sidewalk and Concrete Curb.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Joint School District of Beloit Beloit City Council Meeting Monday, February 24, 2014.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
Design Features Structure Concrete slab floor (27’x25’x3”, 6.25 cu yards) Walls created with mud bricks (dry season) or concrete blocks (wet season) Aluminum.
Facilities Modernization Program Funded by Measure B Project Report October 20, 2014.
University of Toronto Mississauga Campus Capital Projects University of Toronto Mississauga Campus: Capital Projects Erindale College Council | March 9,
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
The art and act of creating indoor spaces that are FUNCTIONAL & EYE-CATCHING! FORM FOLLOWS FUNCTION.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam F ederal A viation A dministration DEPARTMENT.
Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.
Residential Permit Requirements. When do I Need a Permit A new building, structural change, addition, finishing and unfinished area Deck Covered porch.
Business Operations Semi-Annual Meeting Presentation: West Campus Janet Lindner Associate Vice President for Administration November 15, 2007.
Watch University Grow January 2009 University Hospital’s new Heart & Vascular Institute, a four-story, 199,000-square-foot facility consolidates all state-of-the-art.
Winchester Medical Center Campus Expansion June 21, 2011.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Easter Bush Update December The New Teaching Building 12,500 square meters on three floor providing accommodation for up to 850 students and 200.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
Watch University Grow April 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Freedom Park aka Gordon River Water Quality Park.
SunSatFriThursWedTuesMon January
Fiscal Year Budget Status Update.  City Manager held budget kickoff on 12/18  No additional staffing requests will be accepted. Only requests.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Good Afternoon!. Construction Update Airside Center Roof Construction began in May Scheduled completion March.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Campus-to-Campus Public Workshop Evaluating the Routes April 15, 2010.
Tyler Junior College Critical Infrastructure & Renovation Update Spring 2010.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
Perinatal Palliative Care: A Primary Year in Review Jennifer Jonely, MSN, CPLC, RNC-OB St Luke’s Health System, 190 East Bannock, Boise, Idaho Description.
Replacement Proposal Jason Huitt, ACNS November 15, 2011.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
The New Echuca Hospital October 2011 Update
Building Services Summer 2016 Update
Click here for the LIVE WEBCAM
Horwich Health and Wellbeing Hub
Click here for the LIVE WEBCAM
San Luis Potosi – New plant April 24th 2015
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Facilities Modernization Program
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
Facilities Modernization Program
Comprehensive Program Review April , 2011
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Parkland Outpatient Clinic (OPC2)
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Lafayette Airport Commission New Terminal Program Update
Lafayette Airport Commission New Terminal Program Update
Presentation transcript:

Aerial of the full site facing northeast taken on March 1, 2016. Fact Sheet April 2017 Replacement Medical Center Facility, Eastern Colorado Health Care System Aurora, Colorado Aerial of the full site facing northeast taken on March 1, 2016. 91% Complete. Diagnostic and Treatment MRI magnets have been completed and energized; currently “ramped down” for remainder of construction. Operating room drywall almost complete. Surgical suite equipment delivery expected to begin 3 Apr. SwissLog pneumatic tube system complete. Clinic Buildings Building turnover walks took place 24 and 25 Jan. Furniture installation began 6 February. System commissioning and TAB continue through Spring 17. Concourse Chapel millwork and flooring ongoing. Terrazzo almost complete; polishing ongoing. Food service equipment fully installed. Atrium kiosk installation complete. Ped bridge to PSN almost complete – lights, railing and fascia finished. Inpatient Buildings IBN – Accepted 28 Feb. IBS – Accepted 9 March. System commissioning and TAB continue through Spring 17. Energy Center Building turnover took place on 9 Jan. Exterior finishes complete and punch list started. Oxygen tank installed March 17. Joint occupancy and training took place throughout December and January. Research Building Building final turnover walk took place on 26 Jan. Furniture installation began 6 February. System commissioning and TAB ongoing through Spring 2017. Site Site sidewalk along west side complete. PVA courtyard design complete mid-Feb; construction ongoing with underground utilities almost complete. Completed landscaping and irrigation on 17th place. East side courtyards being rough graded.

Fact Sheet April 2017 Progress Research – Solar Tube Installation Complete Concourse- Terrazzo Finish (Atrium) Concourse - Kiosks Diagnostic and Treatment – Operating Room IBN Level 1 Pool Concourse – Check-In Counter/Entrance