Status of RF operation and RF upgrade

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
SESAME Storage Ring RF-System
13 th ESLS RF meeting, DESY, 30/09 – 01/10/2009J. Jacob: Status of the RF Upgrade at the ESRF1 13 th ESLS RF Meeting 2009 DESY, 30 th September – 1 st.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
ANNEX. WP 1.04, Michael Ebert2MAC PETRA-III Review Meeting, DESY,29th November 2006 Sandblasted Center Conductor of a Cavity Input Coupler R a =
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
SESAME STORAGE RING RF-SYSTEM SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Anders Sunesson RF Group ESS Accelerator Division
CWRF 2012 – High Power RF - May 7 th -11 th Brookhaven National Laboratory - USA 1 Status of the RF Activity at ESRF G.Gautier J.Jacob M.Langlois V.Serrière.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
STATUS OF THE SOLEIL RF SYSTEM
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
J. Jacob: RF Operation, Cav's and SSA's at ESRF
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
ALBA RF Systems Francis Perez.
TIARA Workshop on RF Power Generation Uppsala, June 2013
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
ELENA installation progress F. Butin / ELENA collaboration.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Operation Status of the RF Systems and Taiwan Photon Source
Status of the ELETTRA RF Plants
Report Technical Director Storage-Ring-Installation Completed
J. Jacob: RF developments at ESRF: HOM free Cu Cav. & SSA
Report Technical Director Storage-Ring-Installation Completed
Status of BESSY II and bERLinPro
RF acceleration and transverse damper systems
PETRA III at DESY Hamburg/Germany
PETRA III, Status and Upgrade
RF cell Anders Sunesson RF group leader
Solid State Amplifier Development at PSI
Status of High Power Solid State Amplifiers
SOLEIL EXPERIENCE WITH HIGH POWER SOLID STATE AMPLIFIERS
Status and New Developments of RF Systems of ALBA
Complementary ISTC Projects #3888, 3889p
RF interlocks for higher intensities (LMC 15 June)
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
352MHz Klystron Control for the 3MeV Linac test stand
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
CEPC RF Power Sources System
PEP-II RF System Status and Upgrades
Operation Progress and Upgrade in SSRF
Status of CTC activities for the Damping rings
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Harmonic RF systems for ESRF-EBS - Preliminary considerations -
Status of the ASTRID2 RF systems
RF introduction Anders Sunesson RF group leader
Status and New Developments of ALBA RF Systems
ESRF Experience with Solid State Amplifiers and Combiners
Presentation transcript:

Status of RF operation and RF upgrade 20th ESLS RF Meeting - PSI Villigen, 16 – 17 November 2016 Status of RF operation and RF upgrade for the future Extremely Brilliant Source (EBS) at the ESRF Jörn Jacob On behalf of the ESRF RF Group

Storage Ring RF operation statistics OUTLOOK Linac upgrade Booster RF upgrade Storage Ring RF operation statistics MTBF / Downtime Tentative comparison Klystron / SSA RF upgrade for future ESRF-EBS RF design and main parameters (Reminder from ESLS RF 2015) HOM Damped Cavities – procurement / RF conditioning Waveguide run Transmitter control upgrade 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

S-band LINAC upgrade: almost completed DONE: New gun New 3 GHz pre-buncher New buncher (old one = spare) Various refurbishments (PS’s, …) 3rd modulator built in house (hot spare for top-up operation) Spare for Mod 1 or Mod 2 (Control and Waveguide switching) Currently in operation in place of Mod 2 Replacement of Mod 1: still to be validated STARTED: Control upgrade: replacement of obsolete VME [Eric Rabeuf] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Booster RF upgrade: accomplished Initially since 1991: 1 klystron powered 2 five-cell cavities via 2 couplers/cavity 600 kW in total Total Vacc up to 8 MV April 2012 upgrade: 4 x 150 kW SSAs feeding 2 cavities January 2016 upgrade: 4 x 150 kW SSAs feeding 4 cavities (1 SSA/cavity via 1 coupler/cavity) Total Vacc up to 11 MV 8 MV with only 300 kW Redundancy: 8 MV operation with 3 systems (i.e. if 1 cavity or SSA fails) Frequent top up in 16 bunch since April 2016 [J.-M. Mercier, A. D’Elia, G. Gautier, B. Ogier (TID)] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

5-cell cavities: strong HOM ! 352.2 MHz RF system today 5-cell cavities: strong HOM ! Cell 5 Cell 7 Storage Ring Klys1 Klys2 Teststand 4 x 150 kW SSA from ELTA in operation since April 2012 150 kW 150 kW pulsed SY Cav 1 & 2 150 kW 3 x 150 kW SSA from ELTA in operation since 2013 150 kW Booster 3 prototype HOM damped cavities In operation since 2013 One cavity removed due to a micro leak (now closed) 150 kW Klys3 150 kW 150 kW [Vincent Serrière] ID ID Cell 25 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob Cell 23

Operation statistics 2015 New LHC type Arc detectors (slightly modified) will be installed at the ESRF to minimize spurious detections [ Daniel Valuch / CERN] [Jean-Maurice Mercier] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Tentative COMPARISON KLYSTRON / ssa Power Amplifier RF 352MHz Lo Low Level RF Load AC/DC Converter 460kVA / 280VDC Solid State Amplifier (stack of transistors) KLYSTRON HVPS 100kV 95kV/18A Filament 25V/25A Modulating Anode 60kV/2mA Driver RF 100W 2 Focusing Power Supplies 2 X 130V/8A IP Power Supply 5kV Power OUT Power IN CIRCULATOR [Jean-Maurice Mercier] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Tentative tRIP COMPARISON Average 1.5 KLYSTRONS in operation: 3 trips / year for 8 MV (4 to 5 five-cell cavities) 2 SSA in operation: 1 trip / year for 1 MV (2 mono-cell cavities) Note: Arc detections not taken into account HOWEVER: no arc detection with SSAs ! Explained by lower power in the waveguides? In average: arc events close to the RF transmitters represent 32% of the beam failures due to RF [Jean-Maurice Mercier] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

ESRF-EBS parameters (reminder from ESLS RF 2015) ESRF upgrade in 2019 / restart in 2020: EBS = Extremely Brilliant Source Energy [GeV] 6 Circumference [m] 843.978 Natural emittance [pm] 134 Damping time (H/V/L) [ms] 8.5/13/8.6 Eloss/turn [MeV] 2.61 Momentum compaction 0.84 10-4 Tunes (H/V) 76.21/27.34 Natural chromaticity (H/V) -109/-82 Operation chromaticity (H/V) 6/4 Oper. Emittance (H/V) [pm] 110/5 Lifetime multibunch at 200 mA [h] 19 Lifetime 16 bunch at 90 mA [h] 1.8 Lifetime 4bunch at 4 x 10 mA [h] 1.2 for vert = 5 pm 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

MAIN RF parameters for ESRF-EBS upgrade (reminder / ESLS RF 2015) Total energy loss: 3.1 MeV/turn Energy loss from dipole radiation: 2.6 MeV/turn Energy loss from ID radiation: 0.5 MeV/turn Maximum RF Voltage: 6.6 MV RF transmission losses: 15 % including RF losses, spurious mismatches Stored current with operational margin: 220 mA HOM damped cavity prototypes: validated for 0.6 MV / 150 kW 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

RF layout (reminder / ESLS RF 2015) Storage Ring Teststand KLYS 2 Cell 7 KLYS 1 Cell 5 75 kW tower 3x existing 150 kW SSAs Compact 85 kW SSA with cavity combiner See Michel Langlois’ talk 3rd harmonic cavities Still under study: passive or active SC or active NC In house SSA Cell 25 -7 dB 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Power requirements (reminder / ESLS RF 2015) Even with 5 cavities in fault (1 complete cell)  operation at 4.5 MV / 200 mA still possible Also room left for performance upgrade 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

STATUS: Fabrication of 12 cavities for ESRF-EBS December 2013: contract with RI - Research Instruments GmbH Fabrication of 12 HOM damped cavities without HOM absorbers No electron beam welding: only vacuum brazing Process optimization  some delay June to November 2016: delivery of 4 cavities, now about 1/month Base pressure < 10-10 mbar Conditioning to 750 kV within 2 weeks! Difficulties with delivery of HOM absorbers HOM absorbers only in about 1 year from now RF conditioning without HOM absorbers Installation of HOM absorbers in 2018, prior to installation of cavities on new ring in 2019 HOM absorber power < 100 W at frf  no problem expected for re- conditioning [Cavity designed by Vincent Serrière] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

1st cavity: RI-1 Cavity fabrication fres (vented) Parameter specified measured unit fres (vented) - 352.329 MHz fres (converted to vacuum and operating temp.) 352.372 352.379 Q0 35700 Tuning range -357 / +925 kHz 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob [Alessandro D’Elia]

Cavity Assembling Zone (ID8) All the girders in house Conditioned cavities, fully equipped and cabled: ready for installation (except HOM absorbers) Clean room conditions for cavity assembly: excellent base pressure short RF conditioning time [Alessandro D’Elia] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Cavity Assembling Zone - Details RI-4 In preparation Bake-out zone RI-1 and RI-2 already conditioned [Alessandro D’Elia] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

RF conditioning – Example of RI-2 < 14 days for RF conditioning ! Yesterday morning RI-3 was running at 650 kV with 1.10-8 mbar pressure after only 7 days of conditioning ! Latest news: Short conditioning thanks to: Only brazing process during manufacturing (?) Careful assembling in clean room conditions (!) [Alessandro D’Elia] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Sufficient RF power couplers in house, mostly already pre-conditioned Auxiliary components Sufficient RF power couplers in house, mostly already pre-conditioned Movable piston tuners: For RI-1 to RI-4: existing spare tuners from five-cell cavities + one new fabrication prototype by CECOM Series fabrication: delivery delayed, now expected by December 2016 / January 2017 ( cavity RI-5 expected beginning of December: preparation delayed) If too long delay: still 2 tuners available from hot spare five-cell cavity Field probes in house: Without Ti-coating: during RF conditioning, around 600 kV every 2nd ceramic developed a leak in the bulk (not on brazing joint) No more leak experienced, up to 750 kV after Ti-coating (charge evacuation and anti- multipactor effect) Ceramic cap:  50 nm Titanium coating on vacuum side [H. Pedroso-Marques, ESRF vacuum Group] [Vincent Serrière, Alessandro D’Elia] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

RF sections on EBS machine Layout of RF sections complete Detailed design of connecting vacuum chambers: almost complete 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Waveguide Distribution: example of cells 5 and 7 Schematic view 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Waveguide Distribution: example of cells 5 and 7 Waveguide distribution designed 3D drawings including cable trays and piping in progress Spring 2017: procurement of missing waveguide elements [Jean-Maurice Mercier] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Coaxial feed-through for SRTU rooF beams (reminder / ESLS RF 2015) RF source Coaxial feed–through: Prototype will be installed and tested in cell 23 – at next Christmas shut down Different cooling options will be checked See M. Langlois’ talk Cavity 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Transmitter control upgrade Existing VME controllers of klystron transmitters: obsolete need to be replaced, especially also in view of future operation on EBS New control architecture: As already implemented on SSAs / new cavities in cell 23 Analog and slow digital signals through WAGO Modbus/Ethernet couplers WAGO’s <-> PCI dialog via Ethernet Device servers on PCI Fast digital signals (fast interlocks): still old HIS (Hardware Interlock System) (new generation HIS of SSA-type will be retrofitted later) Former VME loops and higher level control: PCI KLYSTRON transmitter 2 upgrade completed in 2016: Required rebuilding and re-cabling transmitter signal interface (many signals) Graceful upgrade: only little interference with heavy test program on RF power teststand, not available for SR operation from August to October 2016 Back to operation on storage ring cavities in October 2016 KLYSTRON transmitter 1 upgrade planned in December 2017 shut down [Georges Gautier] 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Good Operation performance of existing RF system conclusion Good Operation performance of existing RF system Linac upgrade almost complete Booster RF system upgrade complete Storage Ring RF upgrade for EBS is progressing well New cavity production now in full swing Cavities show excellent vacuum behavior RF conditioning to 750 kV in 2 weeks: much faster than anticipated 3 months Lowers the impact from delays in the delivery of HOM absorbers and tuners Waveguide system well defined  procurement in 2017 Klystron transmitter control upgrade Successfully implemented on klystron transmitter 2 Simple repetition foreseen end 2017 on klystron transmitter 1 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob

Thank you !!! 20th ESLS RF Meeting - PSI, Villigen, 16-17 Nov 2016 - RF Operation and Upgrade at the ESRF / Jörn Jacob