Previous Analytical & Experimental Work at Cornell

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
1 William Schulze Department of Applied Economics and Management Cornell University An Introduction to Electricity Auctions Using PowerWeb.
EIUG – Wheeling Methodologies
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
1 Resource Adequacy and Market Power Mitigation via Option Contracts Hung-po Chao and Robert Wilson EPRI and Stanford University Presentation at POWER.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
1 RELIABILITY AND COMPETITIVE ELECTRICITY MARKETS POWER Research Conference UC Berkeley March 19, 2004 Paul Joskow MIT, CEEPR, CMI and Jean Tirole IDEI,
A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005.
Ch 9: General Principles of Bank Management
New Zealand & Australian Wholesale Electricity Markets A Comparative Review Dr Ralph Craven Transpower NZ Ltd.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Pricing and Gaming in a Simple electricity Market Queen’s University Regulatory Economics Class Guest Lecture March 24, 2015.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
POWER MARKET ECONOMICS Deregulation: Socio-economical and Technical Issues Inés Romero Navarro January 2004 Lund University, SWEDEN INDUSTRIAL ELECTRICAL.
RELIABILITY and RENEWABLES: Two Case Studies Using the SuperOPF Tim Mount Department of Applied Economics and Management Cornell University
For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.
Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.
Bulk Power Transmission System
Transmission Reliability Program Review Market Monitoring Tools Bernie Lesieutre and Bob Thomas Lawrence Berkeley National Laboratory Cornell University.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Testing Multi-Dimensional Markets for Electricity and Ancillary Services Using PowerWeb Tim Mount Department of Applied Economics and Management Cornell.
Testing Market Structures for Electricity Using PowerWeb Tim Mount Department of Applied Economics and Management Cornell University Ithaca, NY
Chapter 22: The Competitive Firm Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 13e.
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Lecture 2, Costs and technology
Fuel Cost Components in the Fuel Adder
RENEWABLES AND RELIABILITY
Resource Adequacy and Market Power Mitigation via Option Contracts
Wind Management at MISO
IAAE International Conference Singapore June 18-21, 2017
Fuel Cost Components in the Fuel Adder
FERC Standard Market Design Working Papers
Ensuring Generation Adequacy
Auctions and Competitive Bidding
Fuel Cost Components in the Fuel Adder
Alternative Transactive Electricity Market Models
Benefits of ICAP Reliability Economics
Further Information on MISO FTR Auctions
Economic Operation of Power Systems
Electricity Wholesale Markets: Designs for a low-carbon future
Flexible Forward Contracts for Renewable Energy Generators
OPSI Panel: LMP Pricing Improvements
The Future of Demand Response in New England
Strategies of Reliable Transmission of Energy In A Competitive Market
Supply Unit 2.
Rate-of-Return Regulation
Benefits of New England’s Proposed Capacity Market
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Generation Expansion Daniel Kirschen
Rent, Interest, & Profit Chapter 16 1/2/2019.
Economics of agro-food safety and international market for agro-food products and legislation Antonio Stasi.
Alternative ICAP Proposal
Economic Effects of Export Subsidies in a Small Country
Pricing and Gaming in a Simple Electricity Market
Planning Reserve Margin
Tom Welch October 18, 2002 Boston, Massachusetts
Economics: Principles in Action
The Analysis of Competitive Markets
Market Pricing Initiatives Update September 9th, 2003
Perfect Competition What conditions must exist for perfect competition? What are barriers to entry and how do they affect the marketplace? What are prices.
Deregulated Power, Pollution, and Game Theory
Perfect Competition What conditions must exist for perfect competition? What are barriers to entry and how do they affect the marketplace? What are prices.
Presentation transcript:

Taking Stock: Review of Past Market-Related Research 2005 PSERC Retreat Cambridge, MD

Previous Analytical & Experimental Work at Cornell Preferred Market Clearing (LAO vs PAO) Demonstrate Exercise of Market Power Repeated Markets Load Pockets Self-Regulating Markets (with Active Demand) Forward Contracts -- a temporary fix. Forward Markets prior to construction -- a longer term solution

Previous Analytical & Experimental Work at Cornell (cont.) True Co-optimization (and Markets) Energy & Operating Reserves Energy & VARs (Including Load) Two-part Offers vs Lost Opportunity Cost (or both) The Impact of Transfers on Congestion, Cost, and Market Power Revenue Adequacy of “Efficient” Markets “Public Good” Aspects of Electricity Systems

Two-Sided Electricity Markets: Demand-Side Participation 3 Findings: 1. Markets Perform More Efficiently with Customer Participation, with Less Need for Regulation 2. Real Time Pricing Performs Better that Pre-announced Demand Response Programs in Most Cases 3. Customers Prefer DRP before Trying RTP, but Switch Their Preferences after Experiencing RTP

Capacity and Generator Implications of Two-Sided Markets 3 Findings: Max Line Flow under Markets May be 6-8% Smaller with Demand-Side Participation than under Regulation with FP. Max Generation Capacity May be 7.5% Smaller under Markets with RTP than under Regulation with FP. Line Flows under Markets May be More Predictable with Demand Response, and Approach Performance under Regulation.

Market Test Market Power in a Spot Market can be Transferred into Forward Contracts 4 The widespread belief that market power will automatically be mitigated if generators hold forward contracts is correct if current spot prices do not affect forward prices (unlikely) or if forward contracts are not renewed (unrealistic). Speculation in the spot market may increase when contracts are due for renewal because persistently high spot prices result in higher forward prices. In tests with 1) No contracts, 2) Permanent contracts, and 3) Renewable contracts (10 periods long), students earned the lowest profits with a PERMANENT contract and the highest profits with a RENEWABLE contract. Software agents were able to replicate the speculative behavior of the best students (i.e. with the highest earnings)

Forward Markets, Market Power and Capacity Investment 5 Findings: 1. Forward markets before investment decisions decrease spot market prices and enhance efficiency: Intuition: firms compete to gain “Stackelberg Leader” advantage. 2. Forward markets after investment decisions decrease capacity investments, increase price volatility and might decrease social welfare: Intuition: firms use capacity commitments to counteract price reducing effects of forward markets. 3. Forward (physical) contracts and futures (financial) contracts have the same effects.

Market Test Maintaining Reliability is Expensive 6 Maintaining acceptable levels of reliability requires having additional transmission and generation capacity available to meet load when relatively rare contingencies occur (e.g. some expensive generators are dispatched at the physical minimum levels to provide spinning reserves). In numerous test of markets for energy and reserves, students tended to withhold expensive capacity that was needed to meet reliability standards, particularly if reserves were only paid opportunity costs. Although maintaining reliability is a socially efficient decision, the LRMC of energy in a contingency can be extremely high, and typically, price caps in the USA are too low to cover the capital costs of the expensive generators needed to ensure that the supply system is reliable.

PARTICIPATION BY LOADS IN REACTIVE POWER MARKETS Several approaches have been proposed to allow buyers to participate in reactive power markets or a related voltage market: A) Hogan long ago demonstrated the theoretical need for reactive power markets to provide incentives for reactive power generation and load management by buyers. B) Kim and Outhred have argued that customer participation can be implemented through a market for voltage which takes into account customer values for voltage. We have shown in the paper cited below that voltage is a public good. Public good markets are vastly more difficult to implement than private good markets (but not impossible). We have shown that efficiency requires nodal reactive power pricing and that reactive power is a private good. 6 “Public Goods and Electric Power: A New Look at the Role of Markets” David Toomey, William Schulze, Richard Schuler, Robert Thomas , James Thorp

Market Test Wheeling Affects BOTH the Engineering and Economic Characteristics of the Market 7 Wheeling real energy through a network may increase flows sufficiently to reach voltage and thermal limits on transmission lines. This type of congestion increases market power for some generators (and could be a major impediment for others). Congested systems are easier to exploit because the market is spatially fragmented. Students were able exploit the market power created by transfers and raise spot prices, and the effects of transfers were locationally specific. Even though the quantity of real energy flowing though the network stayed the same for a number of periods in the experiments, the flows on individual lines were quite erratic. Identifying accounting pathways for physical bilateral contracts defies the laws of physics and is highly misleading in a deregulated market.

Market Analysis LICAP Auctions are an Expensive Way to (maybe) ensure Generation Adequacy 8 Current financial incentives in the spot market are insufficient to maintain generation adequacy and higher price spikes are not politically acceptable. Increasing payments to generators in Locational Installed Capacity (LICAP) auctions is more expensive and less reliable than using Power Purchase Agreements (PPA) for new capacity. The eligibility for and treatment of PPA should be an explicit part of the rules for a “deregulated” market. An analytical framework has been developed to determine an optimum portfolio of call options between generators and load serving entities. In this market, generators are paid a high risk premium that is consistent with observed forward prices in New York City.

FINANCIAL INCENTIVES FOR MAINTAINING GENERATION ADEQUACY 8 Three approaches have been proposed to maintain generation adequacy to reliably meet demand: The Vertically Integrated Regulated Utility Uncapped Real-Time Prices in Markets (Australian Approach) Capped Market Prices with a Subsidy for Generators (ICAP) We have shown in the paper cited below that, even in a “perfect market” with generators paid real-time (uncapped) prices for real and reactive power (and these prices fall in the many $1000s of dollar range in failure states), generator’s revenues fail to cover costs. This problem is obviously exacerbated by capping prices. So, there is a major need to find a non-distorting way to subsidize generation. “Public Goods and Electric Power: A New Look at the Role of Markets” David Toomey, William Schulze, Richard Schuler, Robert Thomas , James Thorp

PUBLIC GOODS AND REVENUE ADEQUACY 9 We have shown that uncapped real-time uniform prices for real power, reactive power, and transmission will not collectively generate sufficient revenue to provide for the efficient provision of the public goods in the system (reliability, voltage, and frequency). The missing revenue can only be efficiently obtained by extracting some of the consumer surplus through reliability differentiated service for buyers. The average consumer has values for real power on the order of $10,000 per MW-hr, but the cost is on the order of $100 per MW-hr (this situation is called the diamond-water paradox in economics). It is this difference between value and cost that creates the demand for extremely reliable service. Clearly, some buyers will pay more for more reliable service. “Public Goods and Electric Power: A New Look at the Role of Markets” David Toomey, William Schulze, Richard Schuler, Robert Thomas , James Thorp

Market Analysis Reliability is Dependent on the Design and Capacity of the Transmission System 9 It is inappropriate to use a specified reserve margin as the proxy for reliability in a deregulated market. Although generation adequacy is necessary for reliability, it is not sufficient because there is no longer enough excess transmission capacity. The primary role of transmission in an AC network is to maintain the reliability of supply. Decisions about transmission adequacy cannot be decentralized because reliability is primarily a public good. The pipeline analogy for paying transmission owners is appropriate for a DC intertie but not for an AC network. The AC transmission system should be fully regulated using performance-based rates of return that penalize unscheduled outages. Revenues collected by an ISO from nodal price differences should be pooled and used as a partial payment for system reliability and transmission.