Transportation Development District Presentation

Slides:



Advertisements
Similar presentations
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Advertisements

1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
The Dyer Partnership Engineers and Planners City of North Bend Pavement Management Plan & Street Utility Fee Analysis February 11, 2014.
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
COUNTY OF SAN DIEGO DEPARTMENT OF PUBLIC WORKS County of Los Angeles Public works 2015 Sustainable Pavement Round Table February 10, 2015.
City of Burien Pavement Condition Index (PCI) Presented to Council March 1, 2010 Ambaum Blvd SW & SW 134 th St. S 181 st btwn 4 th & 5 th Ave S SW 158.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
District Information Session For the American Recovery and Reinvestment Act.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Statewide Transportation Funding At Risk Your Name or Agency Date RTPA RCTF.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
1 6-Year Transportation Improvement Program ( ) Kit Baker, Chair ( Citizen’s Transportation Advisory Committee ) Desiree’ Winkler, P.E. ( Transportation.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force March 29,2007 Pavement Management Report Financing Plan Presenter:
Michigan’s Roads Crisis: Study Findings, Conclusions and Where Do We Go From Here? Best Practices Conference Rick Olson, State Representative, 55 th District.
N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking.
Concrete Pavements The Right Tool for The Right Job.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force May 15,2007 Pavement Management Report Financing Plan Presenter:
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
Incorporating Pavement Management into the LRTP John Kiefer, P.E. Research Engineer Center For Technology and Training Michigan’s Local Technical Assistance.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
NATIONAL ASSOCIATION OF COUNTY ENGINEERS Timothy Hens, PE NACE State Director – New York County Engineer, Genesee County, NY.
We maintain streets with half the materials budget that we in had Due to inflation, today's dollar buys only half the materials it did in Therefore,
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
City of Longview Pavement Preservation Program City Council Workshop February 2, 2012 Jeff Cameron, Public Works Director Josh Johnson, Street/Stormwater.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Pavement Maintenance and Microsurfacing Board of Aldermen Discussion Session January 26, 2010.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Navajo Nation Moving Roads Forward
A Data-Driven Strategy to Improve the Quality
2016 Mill and Overlay Project
Thin Lift Asphalt Overlays
INDOT Roadway Preservation Initiative Update
Village of Woodridge 2011 Pavement Analysis
Pierce County Pavement Preservation Program
City of Abilene Pavement Condition Survey 2017 Results and Discussion
PUBLIC WORKS DEPARTMENT
Multi-Year Programming and Predictive Modelling
Minnesota’s Municipal Transportation System
Boulder Junction Town Road Improvement Project
Boulder Junction Town Road Improvement Project
Infrastructure Investment Needs
Budget Overview Budget Presentation.
Street Improvement Plan
Pavement condition index calculation
Consequences of Delayed Maintenance of Pavement Networks
2018 Pavement Workshop May 23-24, 2018
Pavement Performance Measures In Georgia
Pavement Maintenance and Microsurfacing
Pavement Improvement Plan 2009
Town Council Strategic Planning Session
Pavement Preservation Philosophy utilizing Pavement Management Systems
Sidewalk Maintenance Program
East Troy Community School District Community Survey Results
Presentation transcript:

Transportation Development District Presentation Mark H. Payken, P.E. Payken Consulting, LLC

A Brief Summary of the City’s Pavement Preservation Program 2008 Mayor Tim James identified the need to assess the condition of St. Ann’s streets. All of St. Ann’s streets were evaluated using the MicroPAVER Pavement Management System. The City-wide average condition of St. Ann’s streets was 57.8 out of a possible score of 100.

A Brief Summary of the City’s Pavement Preservation Program 2009 The City implemented its Pavement Preservation Program for all streets whose condition score was higher than 55 (this represents nearly 45% of St. Ann’s streets). Initially, this program involved the use of Microsurfacing on a 5 year cycle. $200,000 was budgeted each year to fund this program.

A Brief Summary of the City’s Pavement Preservation Program 2010 - 2015 The City continues the Pavement Preservation Program. Small reconstruction projects were added into the Capital Improvement Program (CIP) as funds became available, such as: Sue Ct. Townley Dr. Mary Ann Ct. Mary Jane Ct. Millwood Ct. It was during this period that the City began to aggressively pursue Federal funding for St. Ann’s arterial and collector streets, for example; Ashby Rd. Bridge, International Plaza Dr., Breckenridge Ave., Ashby Rd. & Adie Rd.

A Brief Summary of the City’s Pavement Preservation Program Federal Aid Projects Federal Aid projects are eligible for 80/20 cost sharing for qualified projects. The five projects shown on the previous slide represents nearly $5,000,000 in construction, for which the City only paid $1,000,000 (20% of total design & construction cost). The remaining $4,000,000 (80%) was paid for using Federal funds collected through the state of Missouri’s gasoline tax.

A Brief Summary of the City’s Pavement Preservation Program 2016 The City switched over from Microsurfacing to Novachip as the preferred technique for the City’s Pavement Preservation Program. Novachip lasts longer and can be driven on immediately by residents. There are currently 63 streets out of 232 (27%) of St. Ann’s streets that fall below a condition score of 35. These streets will need to be completely rebuilt within the next 5-7 years. A mill & overlay or patching will not be sufficient. The need to identify new funding to rebuild St. Ann’s worse streets is critical to St. Ann’s future.

A Brief Summary of the City’s Pavement Preservation Program 2017 The City is seeking to create (with voter approval) a City-wide TDD to raise funds to do the additional maintenance and reconstruction necessary to maintain St. Ann’s streets at an acceptable level. The 2016 City-wide condition score was 61.4, an increase of 3.6 points over the last 8 years. The average deterioration rate for St. Ann streets (if no maintenance has been performed) is 2.1 points per year. In other words, if the City had not begun the Pavement Preservation Program in 2008, the average condition score in 2016 would have been 41.0! (57.8 – [8 yrs. X 2.1 pts. lost per year] = 41.0).

Benefits of Pavement Preservation Program Pavement maintained at higher level Significant cost savings Entire neighborhoods treated at same time Establishment of maintenance sequence More predictable budget Extends pavement life

St. Ann’s Overall PCI History Year Inspected PCI “Do Nothing” PCI 2008 57.8 57.8 2009 57.8 55.7 2010 54.4 53.6 2011 59.8 51.5 2012 59.1 49.1 2013 57.1 47.3 2014 57.1 45.2 2015 61.1 43.1 2016 60.3 41.0 Please note that St. Ann’s current PCI deterioration rate is 2.1 pts./yr. (50 yr. service life) and that MicroPAVER’s default deterioration rate is 3.0 pts/yr. (33 yr. service life)

Pavement Maintenance Toolbox Crack Sealing $0.50/LF Spot asphalt repair $2.00/SY Slab replacement $70/SY Slurry Seal $3.50/SY Chip Seal $4.50/SY Microsurfacing $5.00/SY Novachip $9.00/SY Asphalt mill & overlay $30.00/SY Heavy asphalt mill & overlay $45.00/SY Reconstruction $100.00/SY