Asphalt Pavement Training Conference “HMA Mix Designs on the QPL”

Slides:



Advertisements
Similar presentations
August 26, No door-to-door recruitment per DESE Ensure you are in compliance with the DESE marketing practices No posting of Provider information.
Advertisements

MATERIALS ACCEPTANCE. LPA Construction chapter -2 paragraphs on -Materials Quality Control -Materials Finalization -andAppendix J -LPA materials acceptance.
Paving Potpourri 2015 Spec Changes and More! Bob Dyer Assistant State Construction Engineer WAPA Joint Training March 2015 Lynn Peterson Secretary of Transportation.
DIVISION 5 SUBCOMMITTEE OCT 2014 Update. The Washington Chapter is one of 67 local chapters in the US and Canada which make up the American Public Works.
2014 Washington Asphalt Conference “Specification Update & Initiatives” Joe DeVol Assistant State Materials Engineer State Materials Laboratory.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
Asphalt Quality Assurance Program
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 1 QMP Specifications QMP base aggregate QMP base aggregate Review and comment.
Allen Hughes State Materials Office
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
Complete Ordering System for Promotional Literature and Samples Quick Reference and Training Guide.
Disadvantaged Business Enterprise (DBE) Each Submitter’s Responsibility for Outreach Efforts.
Welcome to Greenville County’s Introduction of the new online Permitting System!
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Welcome to the Testing Information Management System (TIMS)
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Contract Compliance Training
Procurement & Strategic Sourcing
Spanish internet ordering system – Slide 1
Volunteer Management Information System (VMIS) Training
DSQR Training Reliance System
PD2 Multiple Deliveries
Procurement & Strategic Sourcing Commercial Print Services
Procurement & Strategic Sourcing
Purchase order management process
Conference Funding Information Session
Correcting Ministerial & Clerical Errors
Conference Funding Information Session
Office of Student Life Human Resources:
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2013 /00009
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
Procurement & Strategic Sourcing Charter Bus Transportation Services
Correcting Ministerial & Clerical Errors
ACEA Annual Conference
SmartLaborII Supplier Training Overview October, 2016.
Contract Compliance Training
Procurement & Strategic Sourcing
Overview of Stakeholders and Key Roles
c.net5 Online Management
Supplier Training Overview February 2018
Welcome to the Cox Machine VIP Portal! cmivendorportal.com
Overview of the FEPAC Accreditation Process
OSD Verification of Certification
Receiving Transmittals from Contractors
Need Help? Contact csshelp
Welcome Time and Attendance
Outreach Trainer Portal
ETS Submission Process for New Project Applications
Business Office Manager Training The ACH Process in 7 Steps
Business Office Manager Training
Carrier Qualifications & On-Boarding
Advice to Industry Panel – Contract Management Perspective
Procurement.
Need Help? Contact csshelp
How It Works? Online loans same day. Online loans same day helps you find loans, online loans, installment loans and credit lines for those who need emergency.
Volunteer Management Information System (VMIS) Training
Contractor Sourcing Application (CSA) Training
To the ETS - Offset Notice Response Training Course
Procurement Updates Lynn Rodgers, USDA, FNS
ENTERGY SERVICES, INC. February 23, 2006
PROCEDURES FOR GRANTING OF A PETROLEUM EXPLORATION LICENCE
Updated July 10, 2015 for July Training
Care Provider Background Screening Clearinghouse
CMS PDR 101 ICE Presentation 2014.
A Presentation to: Wisconsin Government Finance Officers Association
Diversity management system (DMS)
Business & Finance Policies & Procedures Training
Presentation transcript:

Asphalt Pavement Training Conference “HMA Mix Designs on the QPL” 2015 27th Annual WAPA/WSDOT Asphalt Pavement Training Conference “HMA Mix Designs on the QPL” Steve Davis Bituminous Materials Engineer State Materials Laboratory

QPL Mix Designs Background Getting away from cost recovery Looking at ways for contractors to have WSDOT approved designs for non WSDOT purposes Contractor will now pay for testing Unused mix designs Secondary Supplier designs Meetings with WAPA, Standard Practice QC-8 was developed Included in April 2015 amendment package

QPL Mix Designs What this means for the Regions All communication regarding entire design process will now be between the Contractor and HQ Materials Laboratory All HMA Mix Designs will be referenced from the QPL to the contract. Same as previous process Production history must be in compliance with Standard Specification 5-04.3(11)D

QPL Mix Designs What this means for the Contractor All communication regarding entire design process will now be between the Contractor and HQ Materials Laboratory Initial contact will be the QPL Engineer to start the process Designs will be allowed for use outside of WSDOT contracts

QPL Mix Designs What this means for the Contractor SUBMISSION TO THE WSDOT QUALIFIED PRODUCTS LIST Once the HMA mix design has been developed, the Contractor/Producer shall contact the QPL Engineer (www.wsdot.wa.gov/Business/MaterialsLab/QPL.htm) or (360) 709-5442 to initiate the HMA mix design submittal process. To initiate the mix design submittal process the Contractor/Producer shall provide the following: Company contact and billing information A completed copy of WSDOT Form 350-042EF and test reports in accordance with Section 5-04.3(7)A1 of the Standard Specifications A completed QPL Application ASA Report for the aggregate source(s) QPL Contractor/Producer Product Information page(s) for the PGAB and the anti-stripping additive

QPL Mix Designs What this means for the Materials Laboratory The QPL Engineer will provide the following to the Contractor/Producer: QPL evaluation tracking number Initial letter detailing mix design evaluation Cost sheet for mix design evaluation detailing submittal requirements and associated charges After payment is received for the mix design evaluation the QPL Engineer shall provide: Assigned delivery date of materials and documentation to State Materials Laboratory Estimated date of completion Final letter indicating QPL status

QPL Mix Designs What this means for the Materials Laboratory Preference will be given to mix designs submitted for WSDOT contracts. HMA mix design evaluation for WSDOT contracts shall be completed within 25 calendar days of acceptance by the State Materials Laboratory. Acceptance will be determined when all required documentation, materials and payment have been received at the State Materials Laboratory. HMA mix design evaluations submitted that are not for WSDOT contracts will be completed within approximately 40 calendar days of acceptance by the State Materials Laboratory. The State Materials Laboratory reserves the right to limit the number of HMA mix design evaluations accepted that are not for WSDOT contracts at any given time. Workload and staffing will dictate the number of HMA mix designs accepted at one time.

QPL Mix Designs Mix Design Evaluation The HMA mix design submitted by the Contractor/Producer will be evaluated by the State Materials Laboratory in accordance with Section 9-03.8(2) and 9-03.8(6) of the Standard Specifications. HMA mix designs will be placed on the QPL provided they meet the requirements of Section 9-03.8(2) and 9-03.8(6) of the Standard Specifications. Voids in Mineral Aggregate (VMA) must be within 1.5% of the minimum specification in accordance with Section 9-03.8(2) of the Standard Specifications for the class of HMA evaluated. % Gmm at N design must be within 1.5% of the specification in Section 9-03.8(2) of the Standard Specifications for the class of HMA evaluated. Voids Filled with Asphalt (VFA) in Section 9-03.8(2) will not be part of the mix design evaluation. A mix design that fails to meet the requirements listed in Section 7.2, 7.2.1, and 7.2.2 will not be accepted or placed on the QPL

QPL Mix Designs QPL Listing Page The Contractor/Producer will be issued a QPL mix design record providing the mix design is in compliance with Section 9 of this Standard Practice. The QPL listing for HMA mix designs will show the following information: Company name HMA Class Aggregate Source(s) PGAB Grade PGAB Supplier Anti-stripping additive brand and quantity (if applicable)

QPL Mix Designs Referencing Mix Designs from QPL to Contracts Requests for reference HMA mix designs for non WSDOT projects will be completed on WSDOT Form 350-041EF and emailed to BituminousMaterials@wsdot.wa.gov. Reference HMA mix design reports will be issued for new mix designs on active and awarded WSDOT contracts once accepted and placed on the QPL. Reference HMA mix design reports will be issued for current mix designs on active and awarded WSDOT contracts provided the HMA production history is in compliance with Standard Specifications Section 5-04.3(11)D.

QPL Mix Designs Removal From the QPL HMA mix designs will be automatically removed from the QPL in accordance with Standard Specifications Section 5-04.3(7)A. HMA mix designs may be removed from the QPL if found in nonconformance with the Standard Specifications or this Standard Practice. Causes for removal from the QPL may include, but are not limited to the following: Failure to comply with requirements of Standard Practice QC 8. HMA mix designs that are out of compliance in accordance with Section 5-04.3(11)D of the Standard Specifications. Failure to notify WSDOT of changes in HMA production. Removal at the request of the Contractor/Producer

QPL Mix Designs Designs “Grandfathered “onto the QPL HMA mix designs that have been completed in the past 24 months (April 2013 to present), will be placed on the QPL provided: The original design meets the requirements of Section 9-03.8(2) and 9-03.8(6) of the Standard Specifications. Voids in Mineral Aggregate (VMA) must be within 1.5% of the minimum specification in accordance with Section 9-03.8(2) of the Standard Specifications for the class of HMA evaluated. % Gmm at N design must be within 1.5% of the specification in Section 9-03.8(2) of the Standard Specifications for the class of HMA evaluated. HMA production history is in compliance with Standard Specifications Section 5-04.3(11)D.

QPL Mix Designs Contractor Costs QPL Application & Admin Fee $550 General Mix Design Charge (with one set of Hamburg and one set of IDT specimens) $7,500 Estimated Average Cost – Typical Mix Design $8050 Additional Cost Estimate Information General Mix Design Charge with Lottman testing in lieu of Hamburg and IDT Add $450 per mix design Secondary Supplier Design* $6,150* High RAP Add $800 RAS * $1350 savings if more than one mix design is submitted at the same time.  Same source, JMF, etc.  

Questions? davissj@wsdot.wa.gov (360)709-5424