1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Department of Public Works Robinson Park Recreation Center Renovation – Revised Selection Process for Design Services November 4, 2013.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
PROCEDURES FOR SELECTING THE CONTRACTOR
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
CITY OF HALLANDALE BEACH PROCUREMENT PROCESS City Commission Workshop February 23, 2015.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Purchasing Overview. Fundamentals of Purchasing Procedures.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
United Nations Procurement Division
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Vera Konstantinova, Procurement Contracting Officer September 8, 2015 REQUEST FOR PROPOSAL (RFP) 7045 INDEPENDENT LIVING ASSOCIATION PROJECT COUNTY OF.
Vera Konstantinova, Procurement Contracting Officer July 16, 2015 REQUEST FOR PROPOSAL (RFP) 6922 IN-HOME OUTREACH TEAMS AND ASSISTED OUTPATIENT TREATMENT.
Vera Konstantinova, Procurement Contracting Officer REQUEST FOR PROPOSALS (RFP) NO ASSERTIVE COMMUNITY TREATMENT FOR PERSONS WITH HIGH SERVICE USE.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
RFP Health Education center furnishings
Sun City Lift Station Odor Control Improvements
Light Rail Transit Project
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
State Lobbyist Services
Winchester Lift Station Odor Control Project
Request for Proposals For Banking Services CMU
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
RFP EMISSIONS SOURCE VALIDATION
PRE-PROPOSAL MEETING, September 19, 2017 Contract No.:
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Joint Parking Task Force Update Procurement & Strategic Sourcing
Request for Proposal - Best Value
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Request for Proposal and Specifications for
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Introduction Sign attendance sheet Owner: Jeff Ray – Project Engineer
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
City of Phoenix Request for Qualifications and Scoring Process Update
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
Request for Proposal - Best Value
San Benito County Local Transportation Authority Request for Proposals # Operation of San Benito County Express and Specialized Transportation.
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
Procurement Planning Mani Ram Gelal
United Nations Procurement Division
PRE-PROPOSAL MEETING LOGAN WWTF
Procurement & Strategic Sourcing
Pre-Submittal Meeting As Needed Environmental Services RFQ
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Request for Qualifications (RFQ) Architectural & Engineering Services for Seattle City Hall Plaza Restoration CDCM # Presubmittal Conference June.
Brieana Reed-Harmel, Broadband Project Manager
Oral Statements Oral statements or discussions during this Pre-Submittal Conference will not be binding, nor will they change or affect the RFQ or the.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016

Introductions

Purpose of Meeting Provide overview of the Sanitary Sewer Lift Station Rehabilitation Design Services RFP Answer questions regarding the project

Agenda Safety Moment Project Background Procurement Process Evaluation Criteria and Submittal Information Scope of Services Questions

Safety Moment Consultant will develop health and safety plans as part of PXP Field safety instructions for site visits and field work (survey, geotechnical, etc.) For consultant and their subconsultants

Project Background

Project Background City is under a Regional Water Quality Control Board Cease and Desist Order to eliminate sanitary sewer overflows and unauthorized discharges Master plan efforts have identified needed collection system improvements The CWP includes a Biennial Pump Station Upgrade Program, identifying high priority sanitary sewer pump stations for upgrade Condition Assessment identified the following lift stations for high priority rehab: Kelly/Kehoe Laurie Meados Los Prados No. 1 Los Prados No. 2 Los Prados No. 3

Project Map

Background Documents Integrated Wastewater Master Plan (Draft), Carollo, October 2014 City of San Mateo Pump Stations and Force Mains Condition Assessment, AECOM, June 2016 The Citywide Sanitary Sewer Pump Station Study, Schaaf & Wheeler, November 2010

Procurement Process

RFP Schedule Milestones What When RFP Available September 11, 2016 Pre-Submission Meeting September 20, 2016 Deadline for inquiries/questions September 30, 2016 SOQs Due at the City October 17, 2016 Consultant Short List October 31, 2016 Consultant Interview November 8 - 9, 2016 Consultant Selection November 11, 2016 Consultant Negotiation – Phase 1 November 14 – December 9, 2016 Council Award January 9, 2017 Notice to Proceed January 30, 2017

RFQ Questions and Addenda Send in writing Include “Sanitary Sewer Lift Station Rehabilitation Design Services” in subject line Deadline for questions: 5:00 PM, September 30, 2016 Direct Inquires to: Robert Wiseman, Contract Manager Responses published to City’s website Addenda: Posted to City website http://www.cityofsanmateo.org/bids.aspx Oral clarifications are non-binding City will not notify respondents of addenda Response must include acknowledgement of addenda

Scoring and Selection SOQ Interview Final Scoring and Selection Scoring based on a maximum of 100 points Scored based on Evaluation Criteria SOQs will be ranked and short-listed Interview Short-listed firms will be interviewed Different evaluation criteria may be used for the interview Respondents will be ranked Failure of Respondent or proposed team members requested by the City to participate in the interview may result in disqualification Final Scoring and Selection Combined SOQ and Interview scores will be used to determine the final ranking Rating forms will not be revealed Written notice of selection will be provided to the selected firm

Negotiation and Award Negotiation Award LOE SOW Schedule Contract terms Negotiations may be discontinued if no terms reached after 3 revisions Award Recommendation to council at conclusion of negotiations Initial contract for Phase 1 only

Submittal Information and Evaluation Criteria

SOQ Format Submittal: Format: 6 original bound SOQs 1 disc or flash drive with ready-for-print PDF of the SOQ Provide submittal in a box or envelope and include Respondent’s name, contact information and SOQ title and job number on the box or envelope SOQ shall remain effective for 90 days beyond the submittal date Format: Maximum of 30 pages, including cover letter and excluding resumes of key personnel Cover letter requirements Front and back cover and dividers not included in page count Project schedule shall be prepared on 11” x 17” paper Maximum of three 11” x 17” figures Resumes shall not exceed 2 pages Any excess pages beyond limit will be removed and not considered in the evaluation

SOQ Evaluation Criteria Prime and Subconsultant Firms’ Project Experience and Past Performance: 30 points Key Project Personnel: 30 points Project Understanding and Approach: 35 points Project Schedule: 5 points

Project Experience and Past Performance Project experience and past performance for prime consultant and subconsultants For Prime Consultant, minimum of five similar projects Sanitary and sewer lift station rehabilitation/design projects Maintaining sanitary sewer lift stations in service during rehab Validation of rehab requirement and analysis of pump station hydraulics and selection of equipment Odor control analysis and design for sanitary sewer lift stations Rehab/replacement of force mains, mechanical valves and piping, electrical equipment and I&C systems associated with sanitary sewer lift stations Proposed prime and subconsultants working together on similar projects

Key Project Personnel Project Manager Design Manager Project Engineer Other Specific Subject Matter Experts

Project Understanding and Approach Project risks Approach to design and wide range of rehab tasks Maintaining operability during rehab Minimizing changes during construction and impacts to work area surroundings Expanding pumping capacities Team qualifications Management Team strengths

Project Schedule Proposed baseline schedule Identify tasks, subtasks, durations, milestones Identify field investigations and exploratory work Single 11x17 inch page

Interviews Interview for short-listed firms, at City’s discretion Elaborate on SOQ and respond to specific questions Questions may be issued prior to the interview 60 minutes, including questions and answers Identified PM will lead presentation City will notify respondent which key personnel are required to be present during interview

Scope of Services

Phased Negotiation Phase 1 Phase 2 Phase 3 Task 1 – General Services Task 2 – Verification of Rehabilitation and Basis of Design Phase 2 Task 3 – 50% Design Task 4 – 90% Design Task 5 – 100% Design and Bid Documents Task 6 – Bid Period Assistance Phase 3 Task 7 – Construction Phase Services

Task 1 – General Services Services performed throughout the project Project Management Risk Management Workshops and Meetings Quality Control Management of Subconsultants Agency Coordination, Public Outreach Support, and City Meeting Support Permitting and Environmental Support Consultant to obtain all permits for the project

Task 2 – Verification of Rehabilitation and Basis of Design Tasks: Gather and review available information and studies Site visits of subject facilities and structures O&M staff coordination and discussions Prepare a Basis of Design Report

Task 3 – 50% Design Survey Field and aerial surveys Complete before proceeding to 90% design Geotechnical Investigation, if determined necessary during Phase 1 Field Exploration and Testing Geotechnical Reports (GDR, Geotechnical Design Memorandum) Utility Potholing, if determined necessary during Phase 1 Locate key buried utilities or other structures Completed before proceeding to 90% design 50% Design Development

Task 4 – 90% Design 90% Design Submittal 90% Design Drawings Major design elements well-established and substantially complete Specs substantially complete and include all sections and divisions AACE Class 2 Estimate with basis of estimate narrative and construction sequencing plan 90% Design Drawings

Task 5 – 100% Design and Bid Documents Final (100%) Design Submittal Final Bid Documents

Bidding and Construction Task 6 – Bid Period Assistance Conducted independently for each identified projects Pre-bid meeting, respond to bidder questions, addenda, bid evaluation, conformed documents Task 7 – Construction Phase Services Pre-construction and progress meetings, submittals, RFIs, change orders, record drawings, etc.

Questions?