To the Instructor The set of files here are designed to help you prepare lectures for your own course using the text Introduction to Petroleum Engineering, J.R. Fanchi and R.L. Christiansen (Wiley, 2017) File format is kept simple so that you can customize the files with relative ease using your own style. You will need to supplement the files to complete the presentation topics.
DRILLING PROCESS © 2017, John R. Fanchi All rights reserved. No part of this manual may be reproduced in any form without the express written permission of the author. © 2004 John R. Fanchi All rights reserved. Do not copy or distribute.
Outline Drilling Process Well Types Well Spacing
DRILLING PROCESS © 2004 John R. Fanchi All rights reserved. Do not copy or distribute.
Geologists/Engineers Propose Well Assemble geologic maps & reservoir engineering data Gather offset (nearby) well data Mud records, bit records, casing programs, directional info, well logs, etc. Identify well site and target formations Evaluate economics Identify market Prepare Authorization for Expenditure (AFE)
Typical Cost of U.S. Onshore Wells vs. depth Average costs of oil and gas onshore wells drilled in the United States in 2004, from JAS (Joint Association Survey) data for listed depth intervals. Drilling Interval Avg Depth Avg Cost (ft) (ft) (Year 2004 US$ Million) 1,250–2,499 1,801 0.304 2,500–3,749 3,165 0.364 3,750–4,999 4,367 0.416 5,000–7,499 6,275 0.868 7,500–9,999 8,649 1.975 10,000–12,499 11,074 3.412 12,500–14,999 13,463 5.527 15,000–17,499 15,886 7.570 17,500–19,999 18,468 9.414 http://www1.eere.energy.gov/geothermal/pdfs/egs_chapter_6.pdf
Seek AFE Approval Management reviews AFE Well authorized and funds allocated Must match budget – amount and timing
Seek Stakeholder Approvals Secure leases (if not secured already) Main leases purchased with terms Protection leases purchased Deals made for farmouts (transfer of lease), trades, purchases Identify partners Partners sign Joint Operating Agreement (JOA) Obtain permits Work with government regulatory agencies
Select Vendors Bids taken on major costs Well site equipment (e.g. bulldozer) Drilling equipment (e.g. drilling rig, pipe, mud, cement, bits) Completion equipment (e.g. casing, cement) Other (e.g. logging, tool rentals)
Drilling Contractor Find Drilling Contractor Drilling Contracts Vary by Risk Turnkey Fixed price for a specifically drilled & equipped well All risk on drilling contractor Footage $/foot contract to TD Risk shared by operator and contractor Day rate $/day to finish Risk all on operator Sign contract
Drilling Operations Personnel Company Drilling Foreman (company or contract) Company Drilling Engineer Contractor Crew Tool Pusher Driller Roughnecks (floorhands, derrick hand) Service personnel (mud, bits, cement, casing, fishing, downhole tools, location/bulldozer, etc.)
Spud Meeting All parties involved with drilling meet Review drilling plan, timing & costs Discuss hazards & contingencies Specify spud date Date to start drilling
Clear Location and Move in Rig Lease & surface owner obligations must be met Logistics Clear location Have equipment ready when needed Rig moves in and rigs up (MIRU)
Drill Well Adjust drilling plan from original plan if needed Daily drilling report from field Daily cost records maintained Routine inventory of mud, bits, pipe, etc. Evaluate well at target depth Collect data for decisions – Logs, tests, etc. Decisions: plug, deepen or complete
Wellbore
Well Completion Rig down and move out (RDMO) Complete well Typically use different rig for completion operations Complete well Finalize wellhead Move in service unit Clean out well Perforate and stimulate Test and submit completion reports
Begin Production Build facilities (tank battery, separators, etc.) Select equipment based on expected Pressure Rates of oil, gas, and water Begin production Commence well flow Monitor for optimum production rate
WELL TYPES
Exploration Wildcat (aka controlled exploratory well) Rank wildcat Test a trap that has never produced (new field wildcat) Test a new reservoir in a known field Extend known limits of producing reservoir Rank wildcat Well drilled at least 2 miles (3 kms) from known production Discovery well The wildcat discovers new field
Development Wells Wells for estimating field size Development well Appraisal well Delineation well Step out well Development well Well drilled in known extent of field Infill well Well drilled between producing wells in established field
WELL SPACING
Rule of Capture Rule of Capture applies prior to 1930 Based on Old English Game Law (hunting) Establishes ownership of captured natural resources e.g. groundwater, oil, gas, and game animals In general, ownership of resource goes to the first person to "capture" the resource
Spacing Spacing helps determine how fast we can produce oil and gas How close can we space wells?
Spacing 640 ac 160 ac 40 ac 5280 ft 5280 ft 1 sq mi = 640 ac 2640 ft
QUESTIONS? © 2004 John R. Fanchi All rights reserved. Do not copy or distribute.