Tactile Barriers and StreetWorks App

Slides:



Advertisements
Similar presentations
Managing Your Organisation’s Portal Team Account Tutorial 7.
Advertisements

Officiating Management Software.
7 Day Self Assessment Tool (7 Day SAT) User Guide v7 (June 2015)
XP New Perspectives on Microsoft Office Word 2003 Tutorial 1 1 Microsoft Office Word 2003 Tutorial 1 – Creating a Document.
XP 1 Microsoft Office Word 2003 Tutorial 1 – Creating a Document.
Quick Start Guide. This 22 page introduction to the Financial Assessment Subsystem provides the user with a visual overview of the components of the system.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
NobleHour Setup Instructions for Students in Courses Requiring Community Site Verification of Service or of Work Spring 2015 For follow-up questions or.
USSF North Carolina Arbiter Referee Assignment Site An Introduction & Guide for Use by Referees © Copyright June 2005 by Paul James, all rights reserved.
Overview Trackaparcel booking system is very easy to use which sends up to minute information directly to the logistic company whilst building the manifest.
Blackboard Connect 5 Training Session Presented by: Rebecca Castañeda, Director for Federal Programs August 13, 2015.
XP 1 Microsoft Word 2002 Tutorial 1 – Creating a Document.
HOW TO USE for Audio Diaries click for teacher instructions click for student instructions for smartphone instructions.
Employee Site Web Address: User ID: First initial of first name and complete last name with last four digits of SSN (JDoe-Smith5626)
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
Silent Dismissal Classroom Quick Start Guide. Sign In Enter your site address in the browser, e.g., yourschool.sdcs99.com Enter your User ID, Password.
How Your Customers Will Pay Online & by Phone
Officiating Management Software Presentation for OHSAA Officials.
X2VOL Student Login October Access x2VOL through Family Connection 1.Sign into Family Connection. Login to Blackboard and look for the Family Connection.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
BuzzLah iOS Installation/User Guide
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
Using an Android device open the Android Play Store. Using an Apple device (iPhone or iPad) open the iTunes Store Search for “Collector for ArcGIS” and.
Adding Students in EbD-BUZZ
First step: Research Colleges and Programs
Advantage16 Getting Started
Downloading and Installing
VirtualDoxx Training Guide for USDA NRCS
Blackboard Connect 5 Training Session
Paytm App is your one-stop destination for all your needs
Standard Operating Procedure
Always Connected introduces Tigo SMART 3.0 This guide is interactive!
Sharepoint Call Log Job Tool
Mobile Trip Log.
HOW TO CREATE YOUR LISTING
Standard Operating Procedure
TScore Trampoline Scoring and Competition Organiser
– Officiating Management Software
PO INVOICE ENTRY Creating a PO Invoice Let’s Get Started
Data-Basics Training & Support
How to register and use ODMAP for Fire/EMS and other partners
Transition from Classic Interface Phoenix Interface to
MyGaDOE Portal Provisioning for Security Officers
Google 2 Step Verification Backup Codes Google 2 Steps Verification Backup Codes is very important to get access Gmail account. Backup codes is usually.
Active Orders Supplier Administrator Training Getting Started Activities This training presentation describes the Getting Started activities that will.
Archdiocese of Baltimore archbalt.powerschool.com/public
Recommended Budget Reductions
How to Download the RRC App to Your Phone
This presentation (5-10 min) offers instructions for the players
Creating a Parent Portal Account in PowerSchool 2016
CTAERN/DOE System Level Counselor Coordinator Profile Entry Initiative
Quality Checking your Personnel Folders
Always Connected introduces Tigo SMART 3.1 This guide is interactive!
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
An audio and visual tutorial
La Crosse Interstate Fair – Online Entry Process
Unemployment Insurance Agency Michigan Web Account Manager
CTAERN/DOE System Level Counselor Coordinator Profile Entry Initiative
Clemson For Android Devices and Wi-Fi Setup
Clemson For iOS Devices and Wi-Fi Setup
SCHOOL OF ART + ART HISTORY SELF REGISTRATION
It’s KOBO time!.
The Canvas Parent App Install the Canvas Parent App on Android Devices
Welcome to London.
How to Login to English Central
Downloading & Registering
MyLion Registration Website | Mobile device
Building a healthy nation is what we do. Sidra Supplier Bid Submission.
Mobile Registration App Training Guide for OPO Staffers
Presentation transcript:

Tactile Barriers and StreetWorks App Tactile Barriers and StreetWorks App. for the blind and partially sighted Ashley Whitfield

For the system to provide accurate Street Works Info a system for signing and guarding street works sites that communicates extra information to pedestrians who are affected by them. It provides blind and partially sighted people with useful navigational information whilst providing members of the general public with up to date details about what is happening on site. The system has two major components: 1) Physical changes to the barriers and additional tactile direction signs which provide tactile and visual navigation information. 2) A digital system with an app to register a site description which is then delivered to pedestrians when they approach the site. For the system to provide accurate information to users, both physical and digital elements must be configured correctly. This manual is a compliment to not a replacement for ‘Safety at Street Works and Road Works: A Code of Practice’; known as “The Red Book”.

Barriers should always be deployed with the yellow and black triangles (and tactile dots) where pedestrians would be expected and the red and white rectangles on the side vehicles would be expected, or on the side of the works.

Each sign should be attached to the barrier with cable ties as shown:

Logging the site with the app Search for: StreetWorks.info Log on IOS or Android Once the site has been set up it must be logged in the ‘StreetWorks.Info Log’ app which is available in the iOS App Store and Android Google Play Store.

Log into the app using your e-mail address and password.

You will be presented with a list of sites owned by your account. If you have not set up any sites this will be blank. To To add a new site, or move an existing one, press ‘+ ADD SITE +’

You will be asked to select the layout of the site from four options. Select the option that most closely describes the site you have just set up. Press ‘NEXT’ when you have selected the appropriate layout.

If you have selected a layout other than ‘Footway Closed’ you will be asked to ‘Scan Right Code’. This is the QR code on the yellow barrier-top sign with the right pointing arrow.

The app will check to ensure that it can detect the beacon in the sign before proceeding to the next step. If the app can not detect the beacon first make sure that Bluetooth is switched on, on the phone. Next check that the beacon is still present in the sign and that it has battery and is switched on. Once the right arrow has successfully been logged you will be asked to scan the left arrow.

You will be asked to select the length of the site from four options. Select the option that most closely describes the site you have just set up. Press ‘NEXT’ when you have selected the appropriate length.

You will be asked to select end date for the works. This should be the date you expect the site to be clear of TM and back to normal. You can open the app and amend this date whenever you need to. Press ‘NEXT’ when you have selected the appropriate end date.

You will be asked to select the type of work being undertaken. Depending on how your organisation has set up the system there may be only one or several types. Selecting a type will reveal the information sign options associated with that type.

Select the appropriate information sign. You can open the app and switch over this sign whenever you need to. Press ‘NEXT’ when you have selected the appropriate information sign.

A screen will appear with space for Works Reference and Notes. You may leave both of these blank. You can use Works Reference to keep track of the permit associated with the job. Use ‘Notes’ to mention any additional impacts the site may make on disabled people, other than the layout. This would include actions like moving bus stops, closing or moving controlled crossings, moving the main entrances of major buildings, etc. From this screen you can also log any entrances within the site (to maintain access to properties for example).

The names of each entrance can be logged in order from the right arrow sign to the left. Additional entrances can be added by pressing ‘+ADD ENTRANCE+’ and existing ones can be removed by pressing the red cross to their right. Sight Line will read out each entrance in the order the user will approach them in based on the side they have approached from.

After pressing ‘NEXT’ on the ‘Other Info’ screen a screen will appear with a summary of the information you have entered. Check it is correct and if so press ‘SAVE’. This will create the record of the site and make site information to users of both StreetWorks. info and Sight Line.

Once the site has been created the app will show a preview of the information sign that will be served to users of StreetWorks.info.