St Johns Primary School

Slides:



Advertisements
Similar presentations
Barhale Procedure for Site Establishment
Advertisements

Clearly visible on entering the building Clearly signposted All visitors should report to Reception On 1 st Floor.
Charging System Tests & Voltage information Checking the charging system with just a volt meter.
Safe use of Tools and Equipment at Height Guidance Richie Adams Egyptian Drilling Company.
1 Smoking is dangerous, it can cause fire in the presence of gas, flammable materials, etc. Smoking is only allowed in the Smoking Designated areas. Any.
ELECTRICAL I LESSON 2 BATTERY SERVICE
CORDLESS DRILL WHAT IS IT ? WHAT IS IT USED FOR ? click here
Arrange the following in the order of current, starting with the lowest. (A) 7 coulombs in 3 seconds. (B) 10 Volts across 5 Ohms (C) 15 Volts across 7.
Equipment and Setup NCCER Unit 7.
Ocimum Systems: –Established in the year 2013 in Bangalore with a team having over a decade of expertise in the networking industry and a vision to provide.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Charging System tests & Voltage information Checking the charging system with just a volt meter.
Static Electricity 1. Matter is made up of particles that have mass & volume. 2. Particles of matter also have a property called an electric charge. 3.
“In order for tomorrow to change, you must do something today” Chapter 5 Real Estate Brokerage.
Automotive Batteries Chapter 29.
Know about working with electricity
NCGS: Positioning NC today and for the future! North Carolina Geodetic Survey Maintenance of a CORS/RTN infrastructure.
Inflating your way to a safer working environment.
Monetary Policy and you: You can do this! AP PHS March 5, 2011.
Paul Schneiderman, Ph.D., Professor of Finance & Economics, Southern New Hampshire University ©2008 South-Western.
Serial vs. Parallel Connections. Serial Connections Serial connections are positive-to-negative in a chain.
Pulleys.
Money Supply & The Fed How the Fed “creates” money.
 % or amount of money charged to borrow WE LIKE LOW INTEREST and LOW PRICES!!
Understanding Your F-1 Student Status.  International Student Advisors –Mark Blanco : Primary Designated School Official  OPT, CPT, Transfers SEVIS.
Ten Common Computer Problems That Can Easily Be Fixed By: Sam Merrifield.
Circuit Rules Electricity Lesson 7. Learning Objectives To know the rules for series and parallel circuits. To know the principle behind these rules.
Benchmarking groups what they can and cannot do for an organisation….. Jo Harris Tracey Tilbry.
Bob Vankirk Galileo Personalized Learning Class 4/4/2013.
Sl. No. ParticularsPercentage of consideration 1On Booking / Signing of Agreement15% 2Upon Commencement of Ground Floor20% 3Upon.
Virtual Guard Stations & Live Video Surveillance Presented by: Pete Ballard, Director of Sales.
Why We Should Expand. Progress  Earned $2,179,090 in the past 2 years  Money was put to bills, new supplies, and campers.
Regional Committee Meeting - Secretary R4 Secretary Bill Gorder 8/18-19/2012.
Actions of the Federal Reserve
Electric Circuit Types Series and Parallel Circuits.
Ohm’s Law Practice A nine volt battery supplies power to a cordless curling iron with a resistance of 18 ohms. How much current is flowing through the.
PHYS 219 Recitation Quiz Kevin Ralphs Week 3. Quiz Question 1 A wire has a diameter of 1.0 mm and a length of 30 m, and is found to have a resistance.
Electrical Circuit Theory. What ever the source of the power A.C / D.C. the electricity flows the circuit due to the movement of electrons. If the circuit.
19-1: Electric Current Objectives: Describe the basic properties of electric current. Solve problems relating current, charge, and time. Differentiate.
Terms Wiring WVAOhm’s Law Misc. FR.
PHYSICAL COLLOCATION APPLICATION DATE SENT / / VERSION_________________________________ I CUSTOMER INFORMATION Issue 1: 7/22/96 1.Company Name Street City/Town/State/Zip.
WASTE BATTERIES AND ACCUMULATORS REGULATIONS 2009.
Apply Personal Loan online. About Us Apply online for best personal loan - Compare Personal Loan interest rates from top banks and apply online for quick.
DBMCI is key of students to make perfect career
Democratise HF Radio Make it available to everyone
Actions of the Federal Reserve
PHYSICAL COLLOCATION APPLICATION
How to Jump Start a Car.
About Us Ocimum Systems:
Pre-Training Quiz Question 1 of 5
Pool-3 Kick-off workshop 2013
Find the Best Concrete Cutting Contractor in Melbourne
Skills Canada - Team Ontario 2018
FOR LEASE OR SALE SEAWAY ROAD OFFICE
WOOD OCCUPATION SKILLS SHOPFITTING
Prioritising the Portfolio
Fed Reading.
Standing Team Deployment: Protocols and Processes
New Primary School Woods Meadow
Workplace Exam Rule CFR 56/ Informational Webcast
Fed Reading.
TxMAG presentation
Pulleys.
Ohm’s law.
Floor outlet boxes British Standard
A Successful Assessed Expedition
Ignition System Test.
CERN Brief Update – April 2019
DISCOVER-Y template This file is supplied, free of charge, by ICONDA Solutions It can be downloaded from Please refer to the above.
Work at Height – Ladders and Step Ladders
STEPS FOR HIRING A STUDENT
Presentation transcript:

St Johns Primary School Cable Free Project

St Johns Primary School - Cable Free Project 1no 16amp & 1no 32 amp T drop supply to Cutting station with battery powered hoover provided Battery bank powered from site supply MEWP Charging point from site supply GROUND FLOOR MAIN BUILDING

St Johns Primary School - Cable Free Project 1no 16amp & 1no 32 amp T drop supply to Cutting station with battery powered hoover provided Battery bank powered from site supply FIRST FLOOR MAIN BUILDING

St Johns Primary School - Cable Free Project WHAT WE NEED TO PROVIDE WDC to provide 2no Cutting stations, 2no battery banks and 2no battery powered hoovers and spare batteries in line with the above plans Battery hoovers to be fixed to cutting stations securely, with spare batteries to be signed out from site office

SUPPLY CHAIN TO PROVIDE St Johns Primary School - Cable Free Project SUPPLY CHAIN TO PROVIDE Supply chain members to provide battery powered tools required to undertake specific works Any high cost tools must be identified during pre start meeting where arrangements can be negotiated e.g. 50/50 split on cost of hire for the period required Any works that cannot be accommodated by a cordless tool will need to be identified during the prestart meeting