St. Luke Lutheran Church Building Task Force Presentation
Congregational Survey Needs/Recommendations for church building improvements Bathroom(s) Accessibility (To bathrooms/Fellowship Area/ Basement) Worship Space (size/layout) Fellowship Space (Size/Location) Class Rooms (Quantity/Size)
Our Current Building Specifications 4,451 sq/ft- main level 3,740 sq/ft -lower level. Seating Capacity- 160 Limited permanent parking + street parking Multiple levels with only stair access
SMSQ Presentation
Church Planning & Liturgical Architecture Celebrating 65 Years of Architectural Excellence St. Luke Lutheran Church - Townhall Presentation
E x i s t i n g P l a n s M A I N L E V E L B A S E M E N T 2016.02.06 St. Luke Lutheran Church - Townhall Presentation 2017.04.23
E x i s t i n g B u i l d i n g M A I N L E V E L B A S E M E N T 2016.02.06 M A I N L E V E L B A S E M E N T St. Luke Lutheran Church - Townhall Presentation 2017.04.23
E x i s t i n g B u i l d i n g V I R T U A L M O D E L 2016.02.06 V I R T U A L M O D E L view from northwest view from southeast view from southwest St. Luke Lutheran Church - Townhall Presentation 2017.04.23
preferred option S c h e m e ‘ D . 2 ’ M A I N L E V E L 2017.02.20 preferred option M A I N L E V E L B A S E M E N T St. Luke Lutheran Church - Townhall Presentation 2017.04.23
preferred option S c h e m e ‘ D . 2 ’ Addition Remodel Addition 2017.02.20 Addition Remodel M A I N L E V E L St. Luke Lutheran Church - Townhall Presentation 2017.04.23
preferred option Schemes ‘D.1’ & ‘D.2’ Addition Remodel Remodel 2017.02.20 Addition B A S E M E N T St. Luke Lutheran Church - Townhall Presentation 2017.04.23
COST PROJECTIONS (by SMSQ) ________ Scheme ‘D.2’ ________ 2017.02.20 COST PROJECTIONS (by SMSQ) ________ Scheme ‘D.2’ ________ 1. Link addition (2 floors) $192,280 2. North Wing addition $796,600 3. Restrooms @ Gathering $70,000 4. Worship space remodeling $234,040 5. East entry addition $36,120 6. Basement remodeling $107,650 7. Contingency (15%) $215,500 8. Kitchen equipment allowance $75,000 Projected Cost (Scheme ‘D.2’): $1,727,190 St. Luke Lutheran Church - Townhall Presentation 2017.04.23
explored options S c h e m e ‘ D . 1 ’ Addition Remodel 2017.02.20 M A I N L E V E L Addition Remodel St. Luke Lutheran Church - Townhall Presentation 2017.04.23
V I R T U A L M O D E L ( a d d i t i o n i n y e l l o w ) S c h e m e ‘ D . 1 ’ 2017.02.20 V I R T U A L M O D E L ( a d d i t i o n i n y e l l o w ) view from southwest view from northwest view from northeast view from southeast St. Luke Lutheran Church - Townhall Presentation 2017.04.23
for this opportunity to present our Work! THANK YOU for this opportunity to present our Work! St. Luke Lutheran Church - Townhall Presentation 2017.04.23
Task Force Presentation Back to Task Force Presentation
Riverwood Community Church Located in Cannon Falls on 15 acres Steel butler building with modern style front 12,000sq.ft. (103ft x 128ft) Seating for 250 in main sanctuary. Est $110 to 120 per sq/ft to build (land and parking excluded)(Est $1.5M)
Parking Lot Cost example 2 acre lot (87,120 square feet)(140 car capacity) 6’ of 3” screened as a base and 2” of Cl 5 road rock over that for an initial total of 8” = $21,888 initial approximate cost for rock Other costs: Purchase of Land Land Preparation Asphalt
How will we be the people of God in this place? How does this building hinder ministry? How will changes to the building allow ministry to grow? Are we a place that has room for anyone and everyone? Or are we a place that wants to stay just as we are?