WATER CONSERVATION ISO-14000.

Slides:



Advertisements
Similar presentations
Process Of Reverse Osmosis Plant
Advertisements

Filtersorb SP3 & Scale Prevention
Our World is Water Water treatment in container – with guarantee for quality and performance EUROWATER.
Overview AST Clean water technologies was requested to design and construct an Industrial Waste water Treatment Plant with a capacity of 35 m 3 /h in.
WATER CONSERVATION ISO
Anion Performance Chemicals. Scale What is it? How is it costing you money? The Solution - Anion DScale Applications Key Features Major Customers.
The BallTech ® System Energy saving opportunity for water-cooled chillers.
Dialysis Water Treatment Systems
Brad Buecker Process Specialist Kiewit Power Engineers.
Good Steam Engineering means Proper sizing, insulation, routing and trapping High pressure distribution and reduction at the point of use Separating condensate.
What is a Cooling Tower? Building Equipment Using Cold Water Cooling Tower Make-up Water HOT COLD AIR Cooling Tower Water Treatment Going Green! No Chemicals!
Design and Construction of an Induction Furnace (Cooling System)
20,000 Barrel Per Day Produced Water Treatment System
Self-monitoring programme for a Swedish power plant Hans-Roland Lindgren Director Swedish EPA 1.
Drug Delivery & Tissue Engineering Laboratory
© 2004 Venmar CES Inc.© 2006 CES Group - Confidential 1 Mammoth Product Training Evaporative Condensing.
BETHESDA CENTRAL PLANT 6”
Magnetizing Water GMX International.
Mammoth Product Training
POWER CONTROL LIMITED Introducing “PermaFrost” Presented by Ir. K.M. Wong.
Professor: Jeffery Perl Mentor: Dennis O’Brian Team Members: Jinrong Chen, Kei Simmel, Hantao Wang, Marzena Zarycki Scribe: Hantao Wang.
Hydronic Mechanical Controls
Water: Removing dissolved solutes. Precipitation reactions When two solutions are mixed and a solid forms it is called a precipitation reaction The precipitate.
THE BASICS of SFR Spot Free Rinse Systems - working to keep your reputation spotless  Spot Free Rinse water must have less than 40 ppm of TDS. Our preferred.
Sustainable Management Resources Inc Join SMRI as we work on: “Creating a Sustainable New Economy” SMRI, San Diego CA, ~ ~ Steve Kaplan ~
Heat Exchanger Stall.
How to reduce water consumption and reduce costs
CSU Channel Islands Reclaimed Water use in Central Plant Jose Chanes Associate Director of Infrastructure and Energy Facilities Services.
Plan 2 – Dead-end Seal Chamber Optional Jacket
Fields Of Activity Industrial water treatment Waste water treatment – recycling and upgrading Fine Cyclonic separations for cosmetics and oil industries.
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
© 2004 Venmar CES Inc.© 2006 CES Group - Confidential 1 Mammoth Product Training Evaporative Condensing.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Flooded Screw Chiller FWSF Electronic Expansion Valve Condenser Evaporator Control box compressor Flooded Screw Chiller - FWSF.
Water Treatment for the Recycling of Process Rinse Water
Power Plant Construction and QA/QC Section 2.6– Water Treatment
File reference:Author/Dept:Creation date:Classification: D?Keeping:Page: ‹#› / Water Reduction Efforts BF Goodrich Fort Wayne Facility.
Anti – Odour & VOCs Environmental Protection with The Bio-Trickling Filter Technology Daega Powder Systems CO., LTD CHEON-AN.
REDUCING SCALE DEPOSITION BY PHYSICAL TREATMENT Sungmin Youn and Professor X. Si, Calvin College REDUCING SCALE DEPOSITION BY PHYSICAL TREATMENT Sungmin.
Saltwater Aquariums. The essential items for your tank.
Ion-exchange process (softener plant) Water passes through bed of natural zeolite of synthetic resin to remove hardness Calcium (Ca) and magnesium (Mg)
Honda factory, Guangzhou, China Objective: provide drinkable water to 5'000 employees.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
By: Jim Kibby Fouling and ROI Tools (Return On Investment)
Presentation Title Presented by Joe Blow Top Applications.
Presentation Title Presented by Joe Blow Heat Transfer 101 & ROI.
Zeosorb - The Clean Solution. AMAZING REVOLUTION!! LATEST STATE OF THE ART 3 IN 1 SOLUTIONS Zeosorb FOR YOUR WATER FILTERATION UNITS.
GPAEE New Technologies Blitz 960 Brook Road, Unit 3, Conshohocken, PA * Phone: (610) * Fax: (610) * Feb 18, 2016.
A Non Chemical Water Treatment… A Fit & Forget System…
Advanced Chemical Technology, Inc.
RAINMAKER and RAINMAKER Enviro
Cooling Tower Blowdown Recovery using Thermal Desalination
DESALINATION Multi-Stage Flash (MSF) Multi-Effect Distillation (MED)
FilterSorb SP3 Removal of Scales: Part V -by Deepak Chopra.
Hub 4 Water Design, build, installation and servicing of all systems
Energy Savings Projects
Boiler System Make-up Water Primary Secondary Pretreatment
AUTOMATIC ON-LINE BRUSHING FOR HEAT EXCHANGERS AND CONDENSERS
High Quality Ammonia purifier for Refrigeration Plants | Maniks
Cooling technology Main components and equipments
What is Desuperheater?
Energy Conservation Through the Removal of Bio-film
Refrigeration and Air conditioning
Sustainable Water Solutions
Year 7 multiple-choice main test: answers 7H Solutions
Pesticides The use of pesticides for agricultural and non-agricultural purposes is widespread and there are approximately 450 different active ingredients.
Chapter 15 SEction 9 How is Water Purified?
SRAPPA 2014 Moving Forward in the 21st Century 63rd Annual Conference
Chapter 15 SEction 9 How is Water Purified?
Feed Water Treatment for Steam Power plant
Presentation transcript:

WATER CONSERVATION ISO-14000

ESS CHILL WATER SYSTEMS S. A DE C ESS CHILL WATER SYSTEMS S.A DE C.V CLEAR WATER ENVIRO TECHNOLOGIES DE MEXICO S. DE R.L ING. OSCAR VALENZUELA / DIRECTOR

SOME SUCCES CASES IN MEXICALI CATTLE SLAUGTHER HOUSE BOILERS Installation of two SB 200’s in the discharge of the boiler make-up tank. Results were elimination of 100% of the chemical treatment, reduction in the temperature of the chimey fume, and 30% less bleed off. We also installed 1 SB 200 in the make up of the cooling tower and 2 SB 300’s in the recirculation line of the ammonia coil cooling tower. Results were elimination of 100% of the antifouling chemical and reduction of the bleed off of the towers by 30%. Return on investment for the project was 6 months for the boilers and 14 months for the cooling towers. Scale blaster keep the towers and boiler clean and free of fouling , the sb 200 clean the excess of calcium carbonate in 60 days through the bleed off and manual process as you can see in the pictures Installation of two SB 200’s in the discharge of the boiler make-up tank. Results were elimination of 100% of the chemical treatment, reduction in the temperature of the chimney fume, and 30% less bleed off. We also installed 1 SB 200 in the make up of the cooling tower and 2 SB 300’s in the recirculation line of the ammonia coil cooling tower. Results were elimination of 100% of the antifouling chemical and reduction of the bleed off of the towers by 30%. Return on investment for the project was 6 months for the boilers and 14 months for the cooling towers. Scale blaster keep the towers and boiler clean and free of fouling , the sb-200 clean the excess of calcium carbonate in 60 days through the bleed off and manual process as you can see in the pictures

Inspection port of the boilers You can see in the pictures how the scale blaster started to clean the boiler tubes through the inspection ports. You can see in the pictures how the scale blaster started to clean the boiler tubes through the inspection ports.

Here you can see the inspection ports with soft, easy to remove scale Here you can see the inspection ports with soft, easy to remove scale. After only 30 days, the boiler tubes are almost clean. Here you can see the inspection ports with soft, easy to remove scale. After only 30 days, the boiler tubes are almost clean.

CERRO PRIETO (CFE) GEOTHERMAL After almost five years testing in different geothermal steam wells, we obtained the approval of CFE to install several units including SB600, SB1400 and SB2000. Geothermal applications are not easy because of the chemistry of the wells, different temperatures, and different pressures. In every case it is necessary to have the well water chemistry in order to select the correct unit . We obtained very good results in the production orifice, the separator and the condensate lines. After almost five years testing in different geothermal steam wells, we obtained the approval of CFE to install several units including SB600, SB1400 and SB2000. Geothermal applications are not easy because of the chemistry of the wells, different temperatures, and different pressures. In every case it is necessary to have the well water chemistry in order to select the correct unit . We obtained very good results in the production orifice, the separator and the condensate lines.

You can see in the picture the fouling factor of the well You can see in the picture the fouling factor of the well. Depending the pressure and temperature, one inch of thickness for every 15 days. Scale contains calcium carbonate, magnesium and three types of silica. You can see in the picture the fouling factor of the well. Depending the pressure and temperature, one inch of thickness for every 15 days. Scale contains calcium carbonate, magnesium and three types of silica.

Some of the lines contained hard brine with a high level of fouling Some of the lines contained hard brine with a high level of fouling. In every case, specific scale blaster equipment was installed in the geothermal wells with successful results. More than 50 units of different sizes were installed. Some of the lines contained hard brine with a high level of fouling. In every case, specific scale blaster equipment was installed in the geothermal wells with successful results. More than 50 units of different sizes were installed.

PLAZA NUEVO MEXICALI Complete chilled water plant treatment included 3 Carrier screw chillers of 300 tons each, 3 BAC cooling towers, and an ITT pumping system. Installation of 1 SB200 in the make up of the tower, 3 SB600’s one per chiller, one silver copper unit and sand filters. Project cost $45,000 with pay back in 3 years. Chemical treatment was eliminated with a 30% water bleed off reduction. Complete chilled water plant treatment included 3 Carrier screw chillers of 300 tons each, 3 BAC cooling towers, and an ITT pumping system. Installation of 1 SB200 in the make up of the tower, 3 SB600’s one per chiller, one silver copper unit and sand filters. Project cost $45,000 with pay back in 3 years. Chemical treatment was eliminated with a 30% water bleed off reduction.

Keeping the tower fill clean, the combination of scale blaster, silver copper unit ( biological control), sand filter ( suspended solids), and an automatic bleed off system keeping 5000 micro siemens total dissolved solids in the water with a pH of 7.8 to 8.2, maintained the chemistry control of the water. Keeping the tower fill clean, the combination of scale blaster, silver copper unit ( biological control), sand filter ( suspended solids), and an automatic bleed off system keeping 5000 microsiemens total dissolved solids in the water with a pH of 7.8 to 8.2, maintained the chemistry control of the water.

PILKINGTON Installation of 2 SB200’s for boilers, 1 SB200 for reverse osmosis plant, and 6 SB125’s for evaporative coolers. Pilkington is a car windshield glass production plant. Project return on investment 14 months. Reduction of boiler chemicals by 50% due to the company policy they have to use chemicals in the boilers. No fouling in the tubes or sump of the evaporative coolers. Results in the reverse osmosis unit showed less membrane changes per period . Installation of 2 SB200’s for boilers, 1 SB200 for reverse osmosis plant, and 6 SB125’s for evaporative coolers. Pilkington is a car windshield glass production plant. Project return on investment 14 months. Reduction of boiler chemicals by 50% due to the company policy they have to use chemicals in the boilers. No fouling in the tubes or sump of the evaporative coolers. Results in the reverse osmosis unit showed less membrane changes per period .

CHILLERS TRANE CENTRIFUGAL Installation of 1 SB200 for tower make-up, 2 SB600’s 1 per chiller, no silver copper unit as they use chemical control for biological growth, and sand filters for suspended solids. Payback 12 months. Installation of 1 SB200 for tower make-up, 2 SB600’s 1 per chiller, no silver copper unit as they use chemical control for biological growth, and sand filters for suspended solids. Payback 12 months.

BENQ The lay out shows the installation of scale blaster in the main row of the building taking advantage of the benefit of the scale blaster for bathrooms, landscaping and other uses. We also installed monitoring equipment for chemistry control. The lay out shows the installation of scale blaster in the main row of the building taking advantage of the benefit of the scale blaster for bathrooms, landscaping and other uses. We also installed monitoring equipment for chemistry control.