Calculating simple Construction

Slides:



Advertisements
Similar presentations
Elevation Skilled & quality craftsmanship of Merlin tradition to make the complex a symbol of class. Foundation Reinforced cement.
Advertisements

New development in the center of Kemer !
Welcome to Our House. The Add On Project The tear down The slab Framing the Walls.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Timber Wall Framing Class Exercise 2.
This is Little Moreton Hall
ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007.
The Lisa San Francisco Assembly Instruction By Laser Dollhouse Designs.
Architectural Drawing
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
Structures Mrs. Bader. Definition Slide Structure - an arrangement of parts.
R.H. ADCOCK / ARCHITECT AND ASSOCIATES, INC. Slide 1 GOSSAMER Redwood City, Ca Presented By: R.H. ADCOCK / ARCHITECT AND ASSOCIATES, INC Camino Del.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
FLOOR Meeting 7 Study Program: S0673 / Building Construction II Period: 2007.
History at Key Stage 2 Unit 2: What were homes like a long time ago?
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
As you walk into the front door: view into dining area and kitchen. This apartment has vinyl plank flooring in the living and dining areas and the kitchen.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
Building the Houses Sri Lanka Tsunami Reconstruction Project in
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING PROGRAM STUDI KEAHLIAN (SKILL DEPARTEMEN PROGRAM) : TEKNIK BANGUNAN (BUILDING TECHNOLOGY) KOMPETENSI.
Graphic Communication
Finishing the Building
Odd one out: 1.Sitting room, bathroom, toilet, angel. 2.Santa Claus, chair, sofa, table. 3.A cup, X-tree, a glass, a plate. 4.Behind, in front of, stars,
FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Project: Location Map Laa Capitol is the new residential project offering from Laa Builders & Developers. Located in the fast developing residential.
The problem is we have new land that needs to get buildings on it.
 Water Purifier.  CFL lamp and Ceiling Fan in each room.  Exhaust fan in kitchen & toilets.  Solar Water Heating System for Master Bedroom Toilet.
How are you?. [ a: ] – carpet, armchair, bath [ u: ] – room, bathroom, living room [ æ ] – lamp, flat, mat [ o: ] – floor, door [ t ] – TV set, table.
DREAMZ SUPRICHITH Location:HEBBAL Dreamz Infra India Ltd.
Shree Chand Homes Presents GOLF VIEW HOMES Situated at Greater Noida, Dadri Road next to Ansal’s Golf Link II a very close location From proposed Metro.
В гостях хорошо, а дома лучше. Нет лучше ничего, чем родной дом. Мой дом-моя крепость.
Vocabulario. living room bedroom kitchen dining room.
The Old Watermill. An old water mill in a truly idyllic position in a beautiful wooded valley with a traditional two storey house in need of modernizing.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Stands for Innovation. Contact No: Mail: Dreamz Siddesh - BELLANDUR
Arranging Bugdget Plan of Construction Cost (RAB) Calculating construction RAB of House Building, water building and Bridge By: SMK NEGERI 5 SURAKARTA.
A HOUSE.
Making picture of construction applying.
Identify House Building Science
IDENTIFYING BUILDING CONSTRUCTION
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
IMPLEMENTING SCAFFOLDING JOB
THIS IS JEOPARDY.
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING
Identifying House Building Science
Making Picture of construction Application
Install Glass in frame / door / wood window
Using Hand Tools and Electric on Stone and Concrete Construction
Implementing Finishing Job of Building
Identify the science building
Table (3.1)- the averages of the 10 models costs
Identifying House Building science
Making Picture of Construction Application
The Old Watermill.
IMPLEMENTING JOB OF BUILDING FINISHING
Building Structural Systems
CEN 180: Civil Engineering Drawing II
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING
Arranging Budget Plan of Construction Cost (RAB)
Arranging Budget Planning of construction cost (RAB)
“Planning and Scheduling a SIMPLIFIED Construction Project” BCT458 September 27, 2009 Group Signatures Taggart.
::Address Location:: Premises No , Nayabad, Kolkata
Progress Report 11/10/11.
Structures Mr. Hickey.
Building Drawing.
::Address Location:: 3160, Nayabad, Kolkata – ,
Balaka Housing Society Road, Near Thakur Pukur Cancer Hospital,
HOUSE.
::Address Location:: 201, Dharamtolla Road,
Presentation transcript:

Calculating simple Construction Calculating simple simple construction house building

The Goals of Learning Student can mention in terms of building job. Student can analyze building job. Student can calculate simple construction. Teknologi dan Rekayasa

The terms in building job Principal Adviser Direction / FOREMAN Contractor Manager Teknologi dan Rekayasa

Building Job The condition of hard land which is founded less than 1 m (practice construction) The Condition of Hard land which is founded more than 1 m. (construction is calculated) Teknologi dan Rekayasa

Practice Construction Kinds of foundation is river stone. Sloop size is 15 x 20 with 4 Φ 12 Practice Column size is 15 x 15 with 4 Φ 12 Ring Balk size is 5 x 20 with 4 Φ 10 Teknologi dan Rekayasa

Example of calcukation The Picture of map Teknologi dan Rekayasa

Analysis of Calculation NO JOB IN DETAIL VOLUME   HRG SATUAN JML HARGA Rp I. PREPARATION JOB 1 Land Digging 57.68 m3 15,000.00 865,200.00 2 Land Flatting 40.38 10,000.00 403,760.00 3 Sand Filling 26.85 120,000.00 3,222,000.00 Jumlah 4,490,960.00 II. Stone Job RiverStone Fondation i 1:3:10 73.71 325,000.00 23,955,750.00 Sloop Log and Ring Balk 7.56 2,900,000.00 21,924,000.00 Bone Skeleton Concret Column 5.81 16,834,500.00 4 Bone Skeleton Roof Concrete Plat 6.29 3,100,000.00 19,505,200.00 5 Roster 4.00 bh 150,000.00 600,000.00 6 \brick Arrangement 460.15 m2 55,000.00 25,308,250.00 7 Wall Plastering 920.30 17,500.00 16,105,250.00 8 Sponengan sudut 457.00 m' 7,500.00 3,427,500.00 9 Rain Channels 53.00 50,000.00 2,650,000.00 10 Pilar teras depan 2.00 500,000.00 1,000,000.00 11 Natural Stone Ornament 21.20 275,000.00 5,830,000.00 137,140,450.00 Teknologi dan Rekayasa

continued Teknologi dan Rekayasa III. Wood and Roof Job 1   III. Wood and Roof Job 1 Wood Easle BK 2.15 m3 9,000,000.00 19,310,400.00 2 Wood Gording BK 2.09 8,500,000.00 17,748,000.00 3 Wood Rafter BK Sb Rafter of Teakwood 205.09 70,000.00 14,356,588.24 4 Wood Lisplank BK 47.74 m' 95,000.00 4,535,300.00 5 Wood Plafond Skeleton Kruing 172.83 m2 56,000.00 9,678,480.00 6 Gipsum Plafond 35,000.00 6,049,050.00 8 Ornament Gypsum of the Center of Guest Room 2.00 unit 350,000.00 700,000.00 9 Gypsum List 279.98 17,500.00 4,899,650.00 11 Ridge of Roof 52.35 50,000.00 2,617,647.06 12 Roof Tile of concrete flat 57,500.00 11,792,911.76 13 Wattle Plang 25,000.00 1,308,823.53 15 BaringtoniaSpicata eave 21.00 45,000.00 945,000.00 16 Pralon saluran talang 20.00 20,000.00 400,000.00 17 Door and Window Frame of Teak Wood 1.71 15,000,000.00 25,670,250.00 18 Door plank of Teak Wood 31.57 525,000.00 16,574,250.00 19 Window Plank of Teak Wood 24.78 325,000.00 8,053,500.00 20 Rayben glass 85,000.00 2,106,300.00 21 Iron Door of the Garage 8.75 600,000.00 5,250,000.00 Jumlah 151,996,150.59 Teknologi dan Rekayasa

continued Teknologi dan Rekayasa IV. Sanitation and Ceramic Tile Job 1   IV. Sanitation and Ceramic Tile Job 1 Floor Ceramic Tile Serie Platinum ASIA 159.24 m2 87,500.00 13,933,500.00 2 Floor Ceramik Tile of Garage brand of Asia Platinum 21.00 90,000.00 1,890,000.00 3 List of Edge Ceramik (plint) 279.98 m' 20,000.00 5,599,600.00 4 List stpnosing (edge list) 17.00 60,000.00 1,020,000.00 5 Wall Ceramic of Kitchen 85,000.00 1,785,000.00 6 Discont Concrete of front garagei 22.75 50,000.00 1,137,500.00 7 Discount of Concrete 180.24 17,500.00 3,154,200.00 8 Complete Washtafel brand of TOTO 1.00 bh 1,200,000.00 9 Faucet 4.00 175,000.00 700,000.00 10 Stop kran 150,000.00 600,000.00 11 Floordrain 2.00 75,000.00 12 Wash basin ofstenlisteel brand of TOSTEM 1,250,000.00 13 Water Tankof stenlisteel brand of TIRTA 2,500,000.00 14 Water Radar 15 Water Tower 2,000,000.00 16 Clean Water Channels 76.00 1,330,000.00 17 Saluran air kotor 73.00 22,500.00 1,642,500.00 18 Well pipe tafsir 19 Well making 1,500,000.00 20 Water Pmp brand of SANYO/DAB 950,000.00 21 Pmp House 350,000.00 22 Kitchen table from concrete 5.00 125,000.00 625,000.00 23 Septictank dan absorbing unit 3,500,000.00 Jumlah 48,217,300.00 V. Hanging and locking Job / secure Door slot brand of SES 14.00 225,000.00 3,150,000.00 Door Easle 2,125,000.00 Window easle. 1,260,000.00 Wind hack 28.00 1,400,000.00 Grendel Handle 6.00 stel 2,100,000.00 10,735,000.00 Teknologi dan Rekayasa

continued Teknologi dan Rekayasa VI elctricity Installation Job : 1   VI elctricity Installation Job : 1 Lamp point 25.00 ttk 95,000.00 2,375,000.00 2 Stop Contact Broco 12.00 1,140,000.00 3 Bok MCB 1.00 unit 350,000.00 4 Installation of PLN tafsir 2,000,000.00 5 Lampo of andong for front ornament.for front tornament. 2.00 bh 500,000.00 1,000,000.00 Jumlah 6,865,000.00 VII. Paintig Job Wall painting brand of ICI 920.30 m2 12,500.00 11,503,750.00 Painting of plafond 172.83 12,000.00 2,073,960.00 Wood Painting brand of F TALIT 20.00 20,000.00 400,000.00 Politur of window frame pintu jendela 193.20 m' 50,000.00 9,660,000.00 Politur of plank door 59.62 80,000.00 4,769,600.00 6 Politur of plank window 49.56 3,964,800.00 7 Wood preservation (roof skeleton) 1,250,000.00 33,622,110.00 VIII. PEKERJAAN KMD/WC ANAK Wall ceramic kmd band of Asia 14.00 90,000.00 1,260,000.00 FloorCeramic kmd brand of ASIA 2.25 87,500.00 196,875.00 Lis keramik variation of list Ceramic 5.50 60,000.00 330,000.00 Shower brand of FRISONE 275,000.00 Toilet shower brand TOTO 250,000.00 Sit down Closed INA 1,350,000.00 Kran Brand SAN EI 8 Flordrain 75,000.00 9 Tempat sabun INA 125,000.00 10 Basin bath making 200,000.00 4,561,875.00 Teknologi dan Rekayasa

continued Teknologi dan Rekayasa IX. PEKERJAAN KMD/WC R.TIDUR UTAMA 1   IX. PEKERJAAN KMD/WC R.TIDUR UTAMA 1 Dinding keramik kmd Merk ASIA 22.00 m2 90,000.00 1,980,000.00 2 Lantai keramik kmd ASIA 6.00 87,500.00 525,000.00 3 Lis keramik variasi tengah saja 9.00 m' 60,000.00 540,000.00 4 Shower merk FRISONE 1.00 bh 275,000.00 5 Toilet shower merk TOTO 250,000.00 6 Closed duduk INA 1,350,000.00 7 Kran merk SAN EI 2.00 500,000.00 8 Flordrain 75,000.00 9 Tempat sabun INA 350,000.00 10 Bikin Bak mandi 11 Wastafel 1,200,000.00 Jumlah 7,395,000.00 X. Job of KMD / WC and washing Wall Ceramic kmd 12.00 80,000.00 960,000.00 Floor keramik kmd 5.25 420,000.00 Bath Basin 150,000.00 Closet 125,000.00 Floordrain Wash out 50,000.00 Soap Container Facet of SAN EI 2,355,000.00 Teknologi dan Rekayasa

continued Teknologi dan Rekayasa I. Preparation Job Rp 4,490,960.00   A. Main Building Job I. Preparation Job Rp 4,490,960.00 II. Stone ob 137,140,450.00 III. Wood and Roof ob 151,996,150.59 IV. Sanitation and Ceramic Job 48,217,300.00 V. Job of Hanging and Locking/ secure 10,735,000.00 VI. Electriciry Installation Job : 6,865,000.00 VII. Painting Job : 33,622,110.00 VIII. PEKERJAAN KMD/WC ANAK 4,561,875.00 IX. Main of sleep Room KMD/WC Job 7,395,000.00 X. Job of KMD/WC washing and servant 2,355,000.00 Jumlah 407,378,845.59 NO job in Detail VOLUME HRG SATUAN JML HARGA B. Job of Fence and another Cost : 1 Land Digging 18.76 m3 15,000.00 281,400.00 2 Foundation Arrangementi 18.09 325,000.00 5,879,250.00 3 Bone skeleton concrete Sloop 2.01 2,900,000.00 5,829,000.00 4 Bone skeleton concrete column 1.08 3,132,000.00 5 Brick Arrangement 117.25 m2 55,000.00 6,448,750.00 6 Wall Plastering 17,500.00 2,051,875.00 7 Corner Straight line 76.00 bh 7,500.00 570,000.00 8 Cat catan 105.00 12,500.00 1,312,500.00 9 Minimalist iron door model 5.25 m 550,000.00 2,887,500.00 10 Iron Fence of Minimalist model 9.50 500,000.00 4,750,000.00 11 Urugan tanah untuk peninggian bangunan 182.00 70,000.00 12,740,000.00 12 IMB cost 1.00 tafsir 2,685,000.00 48,567,275.00 Teknologi dan Rekayasa

continued Teknologi dan Rekayasa Recapitulaion : A. Main Building Job   Recapitulaion : A. Main Building Job Rp 407,378,845.59 B.Job of Fence and Another Cost: 48,567,275.00 455,946,120.59 455,000,000.00 Teknologi dan Rekayasa